HomeMy WebLinkAboutNCG500189_Inspection_20090917NCDENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Beverly Eaves Perdue Coleen H. Sullins
Governor Director
September 17, 2009
Max Gardner
Environmental Specialist
Hydro Operations
Progress Energy Carolinas, Inc.
179 Tillery Dam Road
Mount Gilead, NC 27306
Subject: COMPLIANCE INSPECTION REPORT/ General Permit NCG500000
Tillery Hydroelectric Plant
Certificate of Coverage NCG500189
Montgomery County
Dear Mr. Gardner,
,Enclosed you will find a copy of the Compliance Inspection report for the routine
inspection that was conducted on September 10, 2009 at the Tillery Hydroelectric Plant.
The purpose of the inspection was to evaluate compliance with the requirements of the
Wastewater General Permit NCG500000 series. As part of the inspection, a tour of the
plant was conducted. All observations are in Section. D. Summary of
Findings/Comments of this inspection report: On the day of the inspection, this facility
appeared to be in compliance with the requirements of the permit. You are commended
for your initiative and proactive approach for documentation, monitoring, and on -site
SOP. Please keep up the good work.
I appreciate the time and professional courtesy ' that you extended during the
inspection. No additional response is necessary from your office to the DWQ-
Fayetteville Regional Office concerning this report. If you have any questions, please
feel free to contact me at (910) 433-3312.
erely,
(-Dale Lopez- 3
Environmental Specialis
cc: AFRO Files
Enclosures: EPA Water Compliance Inspection Report
225 Green St., Suite714, Fayetteville, NC 28301-5043
Phone: 910-433-3300 A FAX: 910-456-07071 Customer Service: 1-877-623-6748
Internet: www.ncwaterquality.org
An Equat Opporiunity \ Affirmative Action Employer
Dee Freeman
Secretary
One
1\ Ortla Clrohn a.
Naturally
United States Environmental Protection Agency
EPA Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection
1 INI 2 I5I 31 NCG500189 111 121 09/09/10 117
Type inspector Fac Type
18ICI 191 SI 201 1
I 1 I I I I I I I I I I I I 1"
Remarks
211 l I l I I I 1 1 I I I I I I 1 I I I 1 I I I I I 1 I I 1 1 I I
Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---Reserved-------- --------- —
67 I 2.0 169 701 41 71 I I 721 N I 731 I 174 751 I I I I I I 180
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Tillery Hydroelectric Plant
179 Tillery Dam Rd
Mount Gilead NC 27306
Entry Time/Date
10:30 AM 09/09/10
Permit Effective Date
07/08/01
Exit Time/Date
12:00 PM 09/09/10
Permit Expiration Date
12/07/31
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Max J Gardner,2593 Power Plant Rd Lilesville NC 28091//910-439-5211/ ntacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Other
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary) .
Name(s) and SSgnattg (s) of Inspector(s) Agency/Office/Phone and Fax
Dale Lopez \ v" FRO WQ//910-433-3300 Ext.712/
Numbers Date
9 � ! CO I
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
.6eLlid13D I 9.4.2.4., 9/a 07
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page # 1
NPDES yr/mo/day Inspection Type
3, NCG500189 I11 12I 09/09/10 I17 18IdI
(cont.)' 1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
This routine inspection was conducted on September 10, 2009 at the Tillery Hydroelectric Plant. The
purpose of the inspection was to evaluate compliance with the requirements of the Wastewater General •
Permit NCG500000 series. As part of the inspection, a tour of the plant was conducted. On the day of:the
inspection, this facility appeared to be in compliance with the requirements of the NCG500189 permit. You
are commended for your initiative and proactive approach for documentation, monitoring, and on -site SOP.
Please keep up the good work. ,
Page # 2