HomeMy WebLinkAboutNCC210107_NOT Closeout Documents_20220114North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Edgecombe Project: Conetoe II Solar Farm Access River basin: Tar -Pamlico
Person financially responsible: Conetoe II Solar, LLC - Christopher M Fallon Project #: EDGEC-2021-003
Address: 550 South Tryon Street, Charlotte, NC 28202-4200
1. Project Location: Leigh Road, Conetoe
Pictures: No
2. Weather and soil conditions: Sunny, dry, workable Initial inspection: Yes
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): Manuel Arturo Marquinez Title: Lead EHS Professional
Inspection report: Gave Report Date given/sent: January 11, 2021
9. Corrective action needed:
10. Comments: Project work is complete. Permanent ground cover sufficient to restrain erosion has been
established. No additional self -monitoring or self -inspections are required. Project is in
compliance and released under the SPCA. Termination of coverage under the NPDES General
Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee
via a Notice of Termination (NOT). The NOT is available at:
https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Reported by: Lauren Garcia
Date of inspection: January 11, 2021
cc:
Others present: Joe Dupree
Time arriving on site: 11:30 AM Time leaving site: 12:30 PM