Loading...
HomeMy WebLinkAboutNCC210107_NOT Closeout Documents_20220114North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Edgecombe Project: Conetoe II Solar Farm Access River basin: Tar -Pamlico Person financially responsible: Conetoe II Solar, LLC - Christopher M Fallon Project #: EDGEC-2021-003 Address: 550 South Tryon Street, Charlotte, NC 28202-4200 1. Project Location: Leigh Road, Conetoe Pictures: No 2. Weather and soil conditions: Sunny, dry, workable Initial inspection: Yes 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Manuel Arturo Marquinez Title: Lead EHS Professional Inspection report: Gave Report Date given/sent: January 11, 2021 9. Corrective action needed: 10. Comments: Project work is complete. Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Lauren Garcia Date of inspection: January 11, 2021 cc: Others present: Joe Dupree Time arriving on site: 11:30 AM Time leaving site: 12:30 PM