Loading...
HomeMy WebLinkAboutNCG500189_Coverage Renewal_20120803ATA DENA-IRO �_. SEP i2012 NCDENR OWQ North Carolina Department of Environment and Natural Resources. Division of Water Quality Beverly Eaves Perdue Charles Wakild, P.E. Dee Freeman Governor Director Secretary August 3, 2012 Mr. Cecil Gurganus Progress Energy Carolinas Inc 179 Tillery Dam. Road Mount Gilead, NC 27306 Subject: Renewal of coverage / General Permit NCG500000 Tillery: Hydroelectric Plant Certificate of Coverage NCG500189 Montgomery County Dear Permittee: The Division is renewing Certificate of Coverage (CoC) NCG500189 to discharge under NPDES General Permit NCG500000. This CoC is issued pursuant to the requirements of North Carolina General Statue 143-215.1 and the Memorandum of Agreement between North Carolina arid the US Environmental Protection agency dated October 15, 2007 [or as subsequently amended]. If any parts, measurement frequencies or sampling requirements contained in this General Permit are unacceptable to you, you have the right to request an individual permit by submitting an individual permit:application. Unless such demand is made, the certificate of coverage shall be final and binding. Please take notice that this Certificate of Coverage is not transferable except after notice to the Division. The Division may require modification or revocation and reissuance of the certificate of coverage. Contact the Fayetteville Regional Office prior to any sale or transfer of the permitted facility. • Regional Office staff will assist you in documenting the transfer of this CoC. This permit does notaffect the legal requirements to obtain other permits which may berequired by the Division of Water Quality or permits required by the Division of Land Resources, Coastal Area Management Act or any other. Federal or Local governmental .permit that may be required. If you have any questions concerning the requirements of the General Permit, please contact John Hennessy [919 807-6377 or john.hennessy@ncdenr.gov]. Sincerely, Original signed by John Hennessy for Charles Wakild, P.E. cc: Fayetteville Regional -Office / Surface Water Protecti NPDES file 1617 Mail Service Center, Raleigh, North Carolina 27699-1617 512 North Salisbury Street, Raleigh; North Carolina 27604 Phone: 919.807-6300 / FAX 919 807-6489 / Internet: www.ncwaterquality.org An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper NotthCarolma VaturafIj STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT NCG500000 CERTIFICATE OF COVERAGE NCG500189 TO DISCHARGE NON -CONTACT COOLING WATER, COOLING TOWER AND BOILER BLOWDOWN, CONDENSATE AND SIMILAR WASTEWATERS UNDER THE NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM In compliance with the provision of North Carolina General Statute 143-215.1, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and the Federal Water Pollution Control Act, as amended, Progress Energy Carolinas Inc is hereby authorized to discharge Hydroelectric Dam Sumps & Non -contact Cooling Water from a facility located at Tillery Hydroelectric Plant 179 Tillery Dam Road Mount Gilead Montgomery County to receiving waters designated as the Pee Dee River in subbasin 03-07-08 of the Yadkin - Pee Dee River Basin in accordance with the effluent limitations, monitoring requirements, and other conditions set forth in Parts I, II, III and IV hereof. This Certificate of Coverage shall become effective August 3, 2012. This Certificate of Coverage shall remain in effect for the duration of the General Permit. Signed this day August 3, 2012 Original signed by John Hennessy for Charles Wakild, Director Division of Water Quality By Authority of the Environmental Management Commission