Loading...
HomeMy WebLinkAboutGW1-2022-00954_Well Construction - GW1_20220107 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor information: Kaleb T. Hyde 14.WATER ZONES Well Contractor Name FROM TO DESCRIPTION 40 rr• 180 rr. 4436-A ft. ft. NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wells OR LINER if a livable Graham Well Drilling LLC FROM TO DIAMETER THICKNESS MATERIAL 0 ft. 59 f`- 6.25 in 188 Steel Company Name 16.INNER CASING OR TUBING(geothermal closed-loop) 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable we//construction permits(i.e.(/IC,County,State, Variance,etc'.) 0 ft. ft. in. 3.Well Use.(check well use): ft. ft. in. Water Supply Well: FR SCREEN FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Public ft. ft. in. l ❑Geothermal(Heating/Cooling Supply) 19Residential Water Supply(single) ft. ft. in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT !' ❑Irrigation ❑Wells>100,000 GPD FROM TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 fr. 17 ft. ❑Monitoring ❑Recovery 17 ft. 20 ft. injection Well: ft. ft. ❑Aquifer Recharge ❑Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage @. ft. ❑Experimental Technology ❑Subsidence Control fr. fr. ❑Geothenmal(Closed Loop) ❑Tracer 20.DRILLING LOG attach additional sheets if necessary ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM ft. To ft. DESCRIPTION(color,hardness,soiurock type,grain sire,etc.) 4.Date Well(s)Completed: 12/08/2021 well ID# ft. ft. ft. ft. 5a.Well Location: Josh Mitchell fr. ft. Facility/Owner Name Facility ID#(ifapplicable) Conleys Creek Rd, Bryson City, NC 28713 ft. ft. Physical Address,City,and Zip ft. ft. Swain 21.REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one lat/long is sufficient) 22.Certification: 35 degrees 24' 30" N 83 degrees 21' 35" W x-" y 12/8/2021 6.Is(are)the well(s): nPermanent or ❑Temporary Signature of Certified Well ontractor Date By signing this farm,/hereby certify that the u,e/l(s)eras(here)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or I'No 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a caw /fihis is a repair,Jill out known hell construction information and explain the nature(?/'the 4/'ihis record has been prorided to the we//onder. repair under 921 remarks section or on the back of this fornr. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only i GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 1 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 180 (ft•) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths ifdifferent(example-3@200'and 2@100') 40 24a. For All Wells: Original form to Division of Water Resources (DWR), ]0.Static water level below top of casing: (ft.) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 !f water level it above casing,use"= 11.Borehole diameter: 6.25 (in.) 24b. For Injection Wells:Copy to DWR,Underground Injection Control(IUC) Program, 1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: rotary 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA 13a.Yield(gpm) 15 Method of test: air Permit Program, 1611 MSC,Raleigh,NC 27699-1611 13b.Disinfection type: HTH Amount: 21 OZ Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018