HomeMy WebLinkAboutNCG500189_NPDES Permit Renewal_20140408DUKE
ENERGY®
April 8, 2014
North Carolina Department of Environment
and Natural Resources
Division of Water Resources
NPDES Compliance & Expedited Permitting
1617 Mail Service Center
Raleigh, NC 27699-1617
MRO
Subject: Duke Energy - Progress
Tillery Hydroelectric Facility
General Permit - NCG500000
Existing Certificate of Coverage — NCG500189
Revised. Notification of Renewal Intent
Attention: Mr. John Hennessy
Environmental Services
Duke Energy
526 South Church Street
Charlotte, NC 28202
Mailing Address:
Mail Code EC13K/ P.O. Box 1006
Charlotte, NC 28201-1006
RECEIVED
DIVISION OF WATER QUALITY
SEP292014
MO0::ES,ALLE REO!ONAL. OFFICE
DE F
�r t
OCr 0 2 2014
Please reference the revised Notification of Renewal Intent form for Tillery Hydroelectric Facility,
which is attached. Note that the number of listed NPDES outfalls has been increased from one
to three. Please update your internal database to reflect these changes.
If you have any questions concerning this request, feel free to contact me (704) 382-4309.
Thanks for your assistance.
Sincerely,
aez-
Allen Stowe
Water & Natural Resources
Attachments
Avii7
NCDENR
North Carolina Department of:Environment and Natural Resources
Division Of Water Resources:
Pat McCrory Thomas A. Reeder
Governor Director;
NOTICE OF RENEWAL, INTENT
[Required by.15A NCAC 02H .0127(d)]; [term definition see 15A NCAC 02H .0103(19)]
Application for renewal of existing coverage under General Permit NCG500000
Existing Certificate of Coverage (CoC): NCG50189
(Press Tab to navigate form)
John E. Skvarla, III
Secretary
•
1) .Mailing address of facility owner/operator: (address to which all correspondence should be (nailed)
:Company Name
Owner Name
Street Address
City
Telephone #.
Email Address
Duke Energy - Progress
Allen Stowe
526 South Church Street
Charlotte
704 - 382 - 4309 Fax #
Allen.Stowe@duke-energy.com
2) Location of facility producing discharge:
Facility Name
Facility Contact
Street Address
City
County
Telephone #
Email Address
Tillery Hydroelectric Plant
Nob Zalme
179 Tillery Plant Road
Mount Gilead
Moritgomery�
336 462 0221 Fax #
Nob.Zalme@duke'-energy.com
Description of Discharge:
a) Is the discharge directly to the receiving stream?
®Yes
❑ No - Please submit a site map with the pathway to the potential receiving waters clearly marked. This
includes tracing the pathway of the storm sewer to the discharge point, if the storm sewer is the only
viable means of discharge.
State, NC
State NC
ZIP Code 28202 -
ZIP Code 27306 -
b) Number of discharge outfalls (ditches, pipes, channels, etc. that convey wastewater from the property): 3
Page of 3
NCG500000 Renewal Application
c) What type of wastewater is discharged? Indicate which discharge points, if more than one.
❑ Non -contact cooling water Outfall (s) #:
❑ Boiler Blowdown Outfall (s) #:
❑ Cooling Tower Blowdown Outfall (s) #:
❑ Condensate Outfall (s) #:
® Other Outfall (s) #: 001,002,003
(Please describe "Other"): Outfall 001- drains, sumps, turbine feed water, cooling water. Outfall 002 -
generator air cooler cooling water. Outfall 003 - diesel fire pump .water.
d) Volume of discharge per each discharge point (in GPD):
#001: 1,568,502,144 GPD #002: 216,000 GPD #003: 216,000 GPD #004: GPD
4) Please check the type of chemical[s] added to the wastewater for treatment, per each separate discharge
point (if applicable, use separate sheet):
❑ Chlorine ❑ Biocides
❑ Corrosion inhibitors ❑ Algaecide
El Other ® None
If any box other than None is checked, a completed Biocide 101 Form and manufacturers' information on the
additive must be submitted to the following address for approval:
NC DENR / DWR / Environmental Sciences Section
Aquatic Toxicology Unit
1621 Mail Service Center
Raleigh, NC 27699-1621
5) Is there any type of treatment being provided to the wastewater before discharge? (i.e., retention ponds,
settling ponds, etc.)
❑ Yes - Please include design specifics (i.e., design volume, retention time, surface area, etc.) with submittal
package. Existing treatment facilities should be described in detail.
® No
6) Discharge Frequency:
a) The discharge is: ❑ Continuous ® Intermittent ❑ Seasonal
i) If the discharge is intermittent, describe when the discharge will occur: Outfall 001- Discharge from
the sump occurs on an as needed basis , when the water level in containment structure reaches
the predetermined depth, and from the turbines when units are operating. Outfall 002 -
Discharge will occur when generator #4 is in operation. Outfall 003 - Discharge will occur when
the diesel fire pump is tested or operated.
ii) If seasonal, check the month(s) the discharge occurs:
❑ Jan ❑ Feb El Mar. El Apr El May El Jun ❑ Jul El Aug. ❑ Sept. ❑ Oct. ❑ Nov. ❑ Dec.
b) How many days per week is there a discharge? Usually 7 days per week
c) Please check the days discharge occurs: ® Sat. ® Sun. ® Mon. ® Tue. ® Wed. ® Thu. ® Fri.
Page 2 of 3
.
NCG500000 Renewal Application
Additional Application Requirements:
The following information must be included in duplicate [original + 1 copy] with this application or it
will be returned as incomplete.
Site map. If the discharge is not directly to a stream, the pathway to the receiving stream must
be clearly indicated. This includes tracing the pathway of a storm sewer to its discharge point.
Authorization for representatives. If this application will be submitted by a consulting
engineer (or engineering firm), include documentation from the Permittee showing that the
consultant submitting the application has been designated an Authorized Representative of the
applicant, per 15A NCAC 02H .0138(b)(1).
CERTIFICATION
I certify that I am familiar with the information contained in this application and that to the best of my
knowledge and belief such information is true, complete, and accurate.
Printed Name of Person Signing: Randy Herrin Title: General Mgr III-Hydro/CT
(Please review 15A NCAC 1 H .0106(e) f.: authorized signing officials)
/g/20/ % Click here to enter a date.
Signature of Ap ant Date Signed
North Carolina General Statute § 143-215.6B provides that:
Any person who knowingly makes any false statement representation, or certification in any application, record,
report, plan, or other document filed or required to be maintained under this Article or a rule implementing this
Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case
under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device
or method required to be operated or maintained under this Article or rules of the Commission implementing this
Article, shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars
($10,000). 18 U.S.C. Section 1001 provides a punishment by a fine or imprisonment not more than 5 years, or both,
for a similar offense.
This Notice of Renewal Intent does NOT require a separate fee.
The permitted facility already pays an annual fee for coverage under NCG500000.
Mail the original and one copy of the entire package to:
NC DENR / DWR / Water Permitting Section
1617 Mail Service Center
Raleigh, North Carolina 27699-1617
Attn: Charles Weaver
Page 4 of 3
tr
flu
L
Quad
34°36'0"N
Lti
Iw -- -
r34'34'30"
.7
A or
Outfall Number
82'2T30'
•'a
•
uY �.tq. ,
Coordinates
(decimal degrees, NAD83)
Longitude
-80.0646
-80.0651
-80.0642
82'2T0
Latitude
35.2064
35.2064
35.2066
82'26
•
•
30' r
3
r-a; • :
'T.k ,4:,.
:y •
82126.30
82'126'0'
Data Sources:
Outfall Locations: Duke Energy - Progress
Base Map: USGS 7.5 Minute Series Topographic Quadrangles, US Topo product: Mount Gilead West, NC,
URL http://store.usgs.gov, accessed 3/42014.
Drawn By: Tim Leonard
Project Manager. Bill Miller
Client Duke Energy - Progress
Date: 3/192014
Scale
0 025 05
wrs
82'26'0'
•
icha, )
.Y.iiiclafcT8114
9
f- u
IMME
i_•
0
Tillery Hydroelectric Station
■ NPDES Outfall
_ Laear,PA,
82'25'0
DISCHARGE LOCATION MAP
NPDES Permit No: NCG500000
Certificate of Coverage No: NCG600189
DUKE ENERGY - PROGRESS
TILLERY HYDROELECTRIC STATION
MONTGOMERY COUNTY AND STANLY COUNTY
NORTH CAROLINA
FIGURE
1