Loading...
HomeMy WebLinkAboutNCG500189_Inspection_20170127Water Resources Environmental Quality January 27, 2017 Norbert (Nob) Zalme Lead Environmental Professional Duke Energy Progress LLC 2818 South Main Street Concord NC 28027 SUBJECT: Compliance Evaluation Inspection Duke Energy Progress LLC Tillery Hydroelectric Station Permit No: NCG500189 Montgomery County Dear Mr. Zalme, ROY COOPER Governor MICHAEL S. REGAN Secretary S. JAY ZIMMERMAN Director Enclosed please find a copy of the Compliance Evaluation Inspection form from the inspection conducted on 1/17/2017. The Compliance Evaluation Inspection was conducted by Johnathan Watts, Environmental Specialist, of the Fayetteville Regional Office. The facility was found to be in Compliance with permit NCG500189. As part of the inspection, a tour of the plant was conducted. All observations are in Section D. Summary of Findings/Comments of this report. You are commended for your initiative and proactive approach for documentation and monitoring. I appreciate the time and professional courtesy that you extended during the inspection. As a reminder, preservation of the Waters of the State can only be achieved through consistent NPDES Permit compliance. Please refer to the enclosed inspection report for additional observations and comments. If you or your staff have any questions, please call me at 910-433-3322. cc: Central Files Fayetteville File' Sincerely, Johnathan C. Watts Environmental Specialist - Division of Water Resources Water Quality Regional Operations Section �c2 `N.othi x Compares. �,. .... State of North Carolina 1 Environmental Quality 125 Green Street, Suite 714. Fayetteville, North Carolina 28301-5095 910-433-3.00 United States Environmental Protection Agency EPA Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (Le., PCS) Transaction Code 1[ j 2 H 2111,1I11 111 NPDES yr/mo/day Inspection 3 1 NCG500189 111 121 17/01/10 117 Type 18 I. i 'Hi i Inspector Fac Type 19 1 c I 201 I 111IIIIIIIIIIII I•IIIIII II IIIII 166 l Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA 67 I I 70 I I 71 I I 72 J i I L Reserved 73, 11 74 751 I I 1 I 1 I 1 1 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Tillery Hydroelectric Plant 179 Tillery Dam Rd Mount Gilead NC 27306 Entry Time/Date 09:30AM 17/01/10 Permit Effective Date 16/01/19 Exit Time/Date 11:30AM 17/01/10 Permit Expiration Date 20/07/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /1/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Contacted Nob Zalme,5790 Power House Rd Morganton NC 28655//336-462-0221/ - No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Other Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) Johnathan C Watts of Inspector(s) ' Agency/Office/Phone and Fax Numbers_' Date FRO WQ//910 433-3300/ C' Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date Trent AIIen jte_verei FRO WQ//910-433-3300/ EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page# 1 NPDES NCG500189 111 121 yr/mo/day 17/01/10 17 Inspection Type 18 [ j (Cont.) 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Enclosed you wilt find a copy of the Compliance Evaluation Inspection report for the routine inspection that was conducted on January 10, 2017 by Johnathan Watts of the Fayetteville Regional Office, at the Tillery Hydroelectric Station. The purpose of the inspection was to evaluate compliance with the requirements of the Wastewater General Permit NCG500000 series. As part of the inspection, a tour of the plant was conducted and semi-annual sample records were examined from March 2013 to November 2016. On the day of the inspection, this facility was found to be in compliance with the requirements of the permit. You are commended for your initiative and proactive approach for the documentation and on site monitoring. I appreciate the time and professional courtesy that you extended during the inspection. No additional response is necessary from your office concerning this report. If you have any questions, please feel free to contact me at (910) 433-3322. Page# 2