Loading...
HomeMy WebLinkAbout20140122 Ver 1_401 Application_20140214\O�cp W A r f;,? Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Page 1 of 11 PCN Form —Version 1.3 December 10, 2008 Version Pre - Construction Notification PCN Form A. Applicant Information 1. Processing 1a. Type(s) of approval sought from the Corps: ®Section 404 Permit El Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number: 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ® No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ® Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ® No For the record only ❑ Yes for Corps Permit: ® No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ❑ Yes ® No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes ® No 2. Project Information 2a. Name of project: Eastwood Culvert Removal and Streambank Stabilization 2b. County: Pitt 2c. Nearest municipality/ town: Greenville 2d. Subdivision name: Eastwood 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: See attached list for multiple locations. 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d. Street address: 3e. City, state, zip: 3f. Telephone no.: 3g. Fax no.: W W 3h. Email address: Page 1 of 11 PCN Form —Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a Applicant is ® Agent ❑ Other, specify 4b Name Kinsey Holton 4c Business name (if applicable) City Of Greenville 4d Street address 1500 Beatty Street 4e City, state, zip Greenville, NC 27834 4f Telephone no 252- 329 -4467 4g Fax no 252 - 329 -4535 4h Email address kholton @greenvillenc gov 5 Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City, state, zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 11 PCN Form — Version 1 3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a Property identification no (tax PIN or parcel ID) See attached maps lb Site coordinates (in decimal degrees) Latitude Longitude - (DD DDDDDD) ( -DD DDDDDD) 1c Property size acres 2 Surface Waters 2a Name of nearest body of water (stream, river, etc ) to Meeting House Branch proposed project 2b Water Quality Classification of nearest receiving water C,NSW 2c River basin Tar - Pamlico 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Land use for these projects is mixed The streams have silted in because of a pipe failure and the stream banks around the structures have significant erosion The stream banks have started to undercut and erode because of the failure There is also a bulkhead in the stream that has started to fad as well 3b List the total estimated acreage of all existing wetlands on the property 0 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property See attached 3d Explain the purpose of the proposed project This project is intended to removefailed culvert piping causing a public safely hazard, improve the flow of the stream, reduce flooding in the area and repair erosion on the streambanks 3e Describe the overall project in detail, including the type of equipment to be used The project will cosist of removing two sections of 48" RCP that have failed and resolpe the stream banks at 3 1 and provide a new floodplain bench within the stream We will also be repairing erosion downstream of the pipe failure due to the turbulance that the failure has caused in the stream All the dirt from the pipe removal and sediment removed from the stream will be hauled away The banks downstream of the failure will be regraded to a 3 1 slope with exception to the stretch that will have a 6 1 and then 3 1 There will also be repair of bulkhead during this project, because of the damage it has received because of the pipe failure After the stream banks have been stabilized we seed and mulch the slopes to prevent future erosion All other disturbed areas will be seeded and mulched The grading and installation work will be performed with an excavator See attached plans for further detailsof the improvements 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ® No ❑ Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination, what type ❑ Preliminary ❑ Final of determination was made? 4c If yes, who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation Page 3 of 11 PCN Form —Version 1 3 December 10, 2008 Version S. Project History 5a Have permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes ® No ❑ Unknown 5b If yes, explain in detail according to "help file" instructions 6. Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes, explain Page 4 of 11 PCN Form — Version 1 3 December 10, 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ® Streams - tributaries ® Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ No ❑ Corps ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 0 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - (PER) or (Corps - 404, 10 stream length Permanent (P) or intermittent DWQ — non -404, width (linear Temporary (T) (INT)? other) (feet) feet) Removal of failed ® PER ® Corps S1 ®P ❑ T 48" pipes from the UT ❑ INT ® DWQ 15 50 stream Removal of S2 ❑ P ® T sediment deposits ® PER ® Corps 15 30 caused by the ❑ INT ® DWQ failure S3 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 80 31 Comments Page 5of11 PCN Form — Version 1 3 December 10, 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U S then individually list all open water impacts below 4a Open water impact number — Permanent (P) or Temporary T 4b Name of waterbody (if applicable) 4c Type of impact 4d Waterbody type 4e Area of impact (acres) 01 ❑P ❑T 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f. Total open water impacts 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed, the complete the chart below 5a Pond ID number 5b Proposed use or purpose of pond 5c Wetland Impacts (acres) 5d Stream Impacts (feet) 5e Upland (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded P1 P2 5f. Total 5g Comments 5h Is a dam high hazard permit required ❑ Yes ❑ No If yes, permit ID no 51 Expected pond surface area (acres) 5j Size of pond watershed (acres) 5k Method of construction Page 6 of 11 PCN Form — Version 1 3 December 10, 2008 Version 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts below If any impacts require mitigation, then you MUST fill out Section D of this form 6a ❑ Neuse ®Tar- Pamlico ❑Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) for impact Stream name mitigation (square feet) (square feet) or Temporary required? T Regrading of side ❑ Yes B1 ®P ❑ T slope and UT ® No 3200 bulkhead repair B2 ❑ P ®T Access UT ®Nos 2000 Removal ❑ Yes B3 ®P ❑ T of existing UT ® No 1280 1920 asphalt 6h Total buffer impacts 6480 1920 61 Comments The permanent impact will be to remove existing asphalt and seed and mulch the disturbed area and regrading the the side slopes and providing a new flood plain D. Impact Justification and Mitigation 1. Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project 1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques The area to be disturbed is currently vegetated and we ne rplanted the complettion of the project 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for ❑ Yes ® No impacts to Waters of the U S or Waters of the State? 2b If yes, mitigation is required by (check all that apply) ❑ DWQ ❑ Corps ❑ Mitigation bank 2c If yes, which mitigation option will be used for this projects ❑ Payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity Page 7 of 11 PCN Form — Version 1 3 December 10, 2008 Version 3c Comments 4. Complete if Making a Payment to In -lieu Fee Program 4a Approval letter from in -lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation, stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non - riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan 5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund) 6h Comments Currently maintained as grass up to the top of bank Page 8 of 11 PCN Form — Version 1 3 December 10, 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1a Does the project include or is it adjacent to protected riparian buffers identified ® Yes ❑ No within one of the NC Riparian Buffer Protection Rules? lb If yes, then is a diffuse flow plan included? If no, explain why Comments There will be no point dischage, the site will still allow for sheet flow of ❑ Yes ® No the water 2. Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plan? ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan, explain why Disturbed area does not meet the requirements 2d If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a In which local government's jurisdiction is this project? City of Greenville ® Phase II 3b Which of the following locally - implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state - implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 -246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes E] No attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been met? ® Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10, 2008 Version F. Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ® No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter) Comments 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards, ❑ Yes ® No or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b Is this an after - the -fact permit applications ❑ Yes ® No 2c If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes ® No additional development, which could impact nearby downstream water quality? 3b If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered "no," provide a short narrative description 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility Page 10 of 11 PCN Form — Version 1 3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or ❑ Yes ® No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ❑ Yes ® No impacts? El Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? ❑ Yes ® No 8b. If yes, explain how project meets FEMA requirements: 8c. What source(s) did you use to make the floodplain determination? Kinsey Holton, PE / 27#7vJ y /( /Date Applicant/Agent's Printed Name Applicant/Agent's Signature (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 1 1 of 11 PCN Form —Version 1.3 December 10, 2008 Version OPIS Print Pitt County Government l� E Green -ille, North Carolina Pitt t! �4 1 1 v.;. www.pittcountync.gov ^3 58339 '49369'.. '.-s. 56451' W �i a Page 1 of 1 Parcel 06138 Physical Address 99 NICHOLS DR Owner Name HART JOHN SMITH OwnerAddressl HART FRANCES BOOTH OwnerAddress2 99 NICHOLS DRIV OwnerAddress3 City / State / Zip GREENVILLE NC 27858 NC PIN 4697453236 Subdivision / Section / Phase Prior Legal Description RES. DEVONSHIRE EXT. Block / Lot Tract Building Number / Unit Acres 1.62 Current Owner Deed/Document 000192 00388 Map Book - Deed / Document Date 08/1988 Deed / Document Sales Price $97,000 Building Type / Use SFR CONST(SFRS/L) Number of Buildings I Year Built 1966 Total Living Area 2862 Building Value $128,702 Extra Features Value $4,830 Land Value $29,808 Total Current Market Value $163,340 Total 2011 Market Value $152,759 Revaluation Year 2012 Municipality GREENVILLE Township GREENVILLE Fire Service District INSIDE MUNICIPALITY Census Tract 3.02 Neighborhood 004026 Elementary School EASTERN ES Middle School C M EPPES MS High School J H ROSE HS Disclaimer: This tax record is prepared for the inventory of real property within Pitt County 0 23 46 92 138 184 Feet and is compiled from recorded deeds, plats, tax maps, surveys, and other public records. Users of this data are hereby notified that the aforementioned public primary information sources should be consulted for verification. Pitt County assumes no legal responsibility for the information contained herein. PLEASE NOTE: Copyright©2014, Pitt County, north Carolina. Parcel ownership information updated nightly. Map printed 1/28/2014. http:// gis. pittcountync. gov /opis /Fnrint.aspx ?resetSession= true &x 1 =2493636.991987182&y... 1/28/2014 OPIS Print ,,tom °tom Pitt County Government �4 Greenville, North Carolina I Pict www.pittcountync.gov Page 1 of 1 Parcel 05954 y 9 Physical Address 101 EASTBROOK DR • O EASTBROOK APARTMENTS 41835' Owner Name LLC OwnerAddressl PO BOX 3316 �u �'' ✓".. OwnerAddress2 413',6 ` OwnerAddress3 City / p Og�' ;"'' ty State / Zip GREENVILLE NC 27836 41837, .�Ey4 NC PIN 4697457533 58335:'. R Subdivision / Section / Phase a � k ' O ` 04053k C "i Prior Legal Description EASTBROOK APARTMENTS : �14,J/ T' f r RRyC Block / Lot Tract '41k jD « Building Number/ Unit 57280 Acres 21.51 .w; e Current Owner 002556 00627 `,.. Deed /Document Map Book - C Deed / Document Date 10/2008 577M r, • Deed / Document Sales Price $0 +` 405954 h ' Building Type / Use MFR CONST(GARDENAPT) Number of Buildings 24 138 572_Tl Year Built 1972 ' k�� Total Living Area 173522 Building Value $3,453,000 Extra Features Value $25,840 ' Land Value $1,193,004 Total Current Market Value $4,671,849 Total 2011 Market Value $4,108,844 ? Revaluation Year 2012 r G ur Municipality GREENVILLE 4 Township GREENVILLE be a r. r O Fire Service District INSIDE MUNICIPALITY Census Tract 3.02 Neighborhood 004019 25579 Elementary School EASTERN ES Y4: • 4` Middle School C M EPPES MS 1 t High School J H ROSE HS i ✓' � f F' e Disclaimer: This tax record is prepared for the inventory of real property within Pitt County o 23 46 92 138 184 Feet and is compiled from recorded deeds, plats, tax maps, surveys, and other public records. Users of this data are hereby notified that the aforementioned public primary information sources should be consulted for verification. Pitt County assumes no legal responsibility for the information contained herein. PLEASE NOTE: Copyright©2014, Pitt County, North Carolina. Parcel ownership information updated nightly. Map printed 1/28/2014. http: / /gis.pittcountync.gov /opis /print.aspx ?resetSession = true &x 1= 2493903.8515624967 &... 1/28/2014 rB2 C) LY w Ly 0 )w #a B C 1 /�I ' •!ice_ � ` \l�r°'+\L���':1 + i;� � ; � , , • pp .� r PAN •. i � 1 t:ITY OF i;REE'VVILLE, ��T r;. EASTBROOK DRIVE CULVERT REMOVAL AND STREAM BANK IMPROVEMENTS DEVON5HIRE ROAD (G(Y PUBLIC R/W UNOPENED) q---------------------------- - - - - -- ------------------------- -/ -A�y -rte----- - - - - -- - - - -- - -- i N JOHN SMITH HART, ex ux \ \\ `-- DB 192 PG 389 \\ -- - - - -JI \ I }t / --- - - - -JO nRRNG[ 1 I 27 wk I - J KN ,(ems,; NI N LLA DEVONSHIRE ROAD (GO' PUBLIC R/W UNOPENED) I- -------------------- I CANNON COURTI.4_ ONDOMINIUM5 A550CIATION S51 PG 7131127 rl.� y� MB 29 MB 31 PG 39" I I r��t'� — �'i�r,,,'c rt f �•k, Vicinity Map LEGEND ROW= RIGHT OF WAY B-B = BACK OF CURB TO BACK OF CURB DB - DEED BOOK MB- MAP BOOK PG = PAGE TOB = TOP OF BANK TOE - TOE OF BANK CMP = CORRUGATED METAL PIPE RCP - REINFORCED CONCRETE FIRE NOR17ONTAL GRAPHIC SCALE 20 0 10 20 40 ( IN FEET ) 1 hM -201( REVISIONS annnnnnnI J O ZR WQ v Lu 2 W 2' W� 0 > j w a Lu W Nw0Yu U. 6 J � YW� Z c.i � w m cO U) a� W v i ng u a� WOE m m �( C q ATA R U CAR01 4 SEAL 17376 C1 K1W 1a11A -t I NI �a N DEVONSHIRE ROAD (60' PUBUC R/W, UNOPENED) - - - - - ----- - - - - -- - - - - - I I I I I I I I I I EXISTING CONDITIONS NOTE THE EXISTING CONDRION5 WERE 5URVEYED BY BILLY MERRILL P L 5 IN JUNE AND AUGUST 2012 CONTRACTOR SHALL V15TT 51TE AND BE AWARE OF ANY CHANGED CONDMON5 I I I I I I JOHN SMITH HART, ex ux 1 DB 192 PG 388 I I / t9 I I ~ LJ 1 —Z .L —/ 1- LZ1_.L DEMOLITION NOTES 1) IN5TALL APPROPRIATE ERO510N CONTROL MEA5URE5 F TREE PROTECTION PRIOR TO BEGINNING DEMOLITION 2) REMOVE ALL EX15TING CURB AND GUTTER, BARRICADE5 ASPHALT AND STONE BASE SOUTH OF PKOP05ED 5AW -CUr LINE 3) REMOVE EX15TING WOOD HEADWALL 4) REMOVE E)(15TING TREF5 A5 NOTED REMOVE ONLY TREE5 5HOWN TO BE REMOVED 5) REMOVE EX15TING TWIN 48' RCP`> AND HEADWALL AFTER ALL WORK ON NORTH SIDE OF EX15TING DITCH 15 COMPLETE 6) REMOVE HEAD FROM EXISTING CURB AND GUTTER A5 SHOWN AT THE END OF NICHOL5 DRIVE AND IN5TALL 001,15TRUCTION ENTRANCE ONCE CON5TRUCTION 15 COMPL mr REMOVE REMAINDER OF GUTTER AND REPLACE WITH NEW CURB AND GUTTER 7) ALL CON57RUCTION TRAFFIC SHALL ENTER MM NICHOL5 DRIVE w ,fie•, � Ay, wu ; I 8 t; "b N W 60 00' II`yr, f'- I tl A II vx lz y BI_'ra "s oL�� _'i 10 al v��= 4, rl u 11�, .ISa DEVONSHIRE ROAD (6(Y PUBUC R/W, UNOPENED) m�wc ewwuncovlrnm - ---------------- ------ ---------------- [IP ( _- 1- - -- --- - - -� -t -7-5 - - - - - -- �I vSt�41 �- gCONDOMINIUM BUILDING AII "' / I�? rl�; , °(• ,,1 �= I� �:I .f; �;`'I' �` Iz �:'I<„ ,III `,CANNON COURT ° GONDOMINIUM5 A550CIXTION i DB 5-51 PG 7131727 "- ( M8 29 PG 77 MB 31 PG 39 i! AD jpk AVI i I?� {``s� "S'c.ss'�,I I —�� ,✓4. F ?T. " "rst °` f� ( F3 /r/ i P40 PG 495 / / /�/ // j {/{ rQIP8 tQ111Bt$WIM �� 1 -/_ 11_ _L T,•��''� G ��-;; F�,?. r,= T =�,�; � EASTBROOK APARTMENTS, LLC GW `�ay...l ` DB 2556 PG 627 / UNRECORDED MAP BY GAR 5 MILLER �Vt r'v'+° ^r .F)'vk cd;•x DATID MAY 23 2002 REVI5ED JULY 19 2005 TITLED 5URVEY FOR REGINALD MORTON FOUNTAIN JR. •���� §I� � I <yf? ads`a t FS'r ;:I/ REVISIONS I�nnnnnnn 1 — — J Q J O z g Wa W w W� OJ~0z J 0 W W gz - - zz LL J 0 w � a s LL _ Z Cm O O c J W > V W �Iz m J3 LL O Q Q� W v U 'n 2mm r N LEGEND U ;iill. ¢ 0 ROW = RIGHT OF WAY • M IY B = BACK OF CURB TO BACK OF CURB D B =DEED BOOK � MB - MAP BOOK PG — PAGE TOB = TOP OF BANK TOE TOE OF BANK i 1 = CMP — CORRUGATED METAL FIFE ` dP RCP = REINFORCED CONCRETE PIPE CHECK DAM •��{1CARO(�r. SILT FENCE S. �.�+g' ,7, /�Yy w••`% TREE FROTECTIONFENCE QpFF' SEAL T 17376 = PiolatlMwOV FDT NO. EnN , STA Dwow By KTW Drawn By LIT Uhxb! By FDT Pm)ad Nu 20121W LiraMip NamMr W.SI66 Grab i =20 Uab. SEPTE SER 26 2012 HORIZONTAL GRAPHIC SCALE 20 0 10 20 40 C-2 (In FEEr) I loch a 20 It (60' PUBLIC RN✓ UNOPENED) /" ;,'`'4'' "_� =`'a`.-A�``•_ M„y,"� I-) ': , `< @" . ,4 • �"•• tt f, \; +I � M1`, .n.oa Nw enra awn.w wnea DEVON5111RE ROAD flNICh0L5 DRIVE f (GO PUBLIC RAN UNOPENED) (50 PUBLIC R/W 36' B-13) m em VARIES EXISTING VARIES 6' VARIES 2 ryr /ice 5 � 5TING GRUND SOUTH SIDE WHERE CULVERT REMOVED j�pINGA +� UNRECORDED MAP BY GARY MILLER DATED MAY 23 2002 REVISED JULY 19 2005 TITLED E5TUND MG NORTH GROUND RO SIDE 2'r =— 'oft - 3 f TYPICAL CP055 SECTION NT5 CON5TRUCTION SEQUENCE 1) INSTALL SEDIMENTATION AND EROSION CONTROL MEASURES AND TREE PROTECTION FENCE AS SHOWN ON PLANS 2) STABILIZE EA5TBROOK DRIVE AS NECESSARY TO ACCESS NORTH SIDE OF PROJECT AREA 3) REMOVE EXISTING TREES WOOD HEADWALL AND CHAIN -UNK FENCE 4) INSTALL NEW HEADWALL ON SOUTH 510E OF E)0511NG DITCH AS SHOWN ON PLANS 5) REGRADE NORTH SIDE OF DG5TING DITCH UP TO E 5TBR00K DRJVE AS SHOWN ON PLANS 6) REMOVE ASPHALT STONE BASE AND GURB E GUTTER IN ES5TBROOK DRIVE STARTING AT THE 5AW -CVT UNE ON THE NORTH END INSTALL TOPSOIL TO GRADE WHERE ASPHALT 5 REMOVED SAND A REGRADE DITCH ACRO55PASTBROOK DRIVE PIPES 8) REMOVE THE REMAINDER Of ASPHALT STONE BASE AND CURB f GUTTER FROM EXISTING DITCH TO SOUTH END OF EA5TBROOK DRIVE BACKMLL TO GRADE WITH TOP501L 9) SEED AND MULCH ALL DISTURBED AREAS AND REPLACE CURB 4 GUTTER IN NICHOL5 DRIVE �I IJgI S 35 30 25 JOHN 5MITH HART ex ux- DB 192 PG 388 NG9"09'11'W 6000 Ig " ELM / EIP (6O PUBUC RAN UNOPENED) DEVONSHIRE ROAD (60 PUBLIC RAN UNOPENED) w "7,s,1 Yty� + ;`..t �a t i•^7 �� ,,�y�:i„1 ��4 r, '—, e " * � `� v � I' >S'+t q _� t1f ._,i,�z,.c'Si'"''"I�' v ' �,.7 ,� '� Lr •A'^ '�i F \\\�C -32 —J 0 +00 8 D - - -_ \ I F I z) -� �— 0Wx 0NC Rftt \ \I V 1 1Y II I. I 32 - - _/ / TpwxuNCrrNO: J2 7 r F ecnl�iG.`f /' 3J_ /,L 9 � j / / 2 ryr /ice _..%�1_�1//� ; � �� R249AN DB o-Vo 0 +00 8 D - - -_ \ I F I z) -� �— 0Wx 0NC Rftt \ \I V 1 1Y II I. I 32 - - _/ / TpwxuNCrrNO: J2 7 r F ecnl�iG.`f /' 3J_ /,L 9 � j / / 2 ryr /ice _..%�1_�1//� ; � `�� �� 1 1 EA5TBROOKAPARTMENT5, LLC // d� DB 2556 FG 627 / p��Y4 j�pINGA +� UNRECORDED MAP BY GARY MILLER DATED MAY 23 2002 REVISED JULY 19 2005 TITLED ?gi lY,',� tcT SURVEY FOR REGINALD MORTON FOUNTAIN JR =— 1 +00 - CONDOMINIUM 13UILDING,,,,-- 5-(,_' r1-, e p -F, I`_n %ms's -,,= " 2 +00 - — — — -------- - - ---I ri ��F,lfl <tryh�I`-�xr° ��K,���15;• �I` "' =�qt''�- CANNON COURT ,g ,,' >k``rCONDOMINIUM5A55OCIATl IDB 5 51 FG 713 t 727 yi'`MB 29 PG77,MB31 PG 39A }5 �TJ� ,r. mmr rxMxfnr ql'` j, -»,,� Te N ` ` f b°1p I P" r ? Fn 1xL� y`11 DTI M r ' 3 +00 315 1 +DIP T � -7 7 I j/71k SEWER MNN CROSSING TOP 31 0 D 2'W I P p� " - O O O =— L 1 a m - -a - -- O O — _0_ -__ -� v o U —d -- O O — _-- - - -1 -- u-- ' - -� O O — _�-- N CENTERUNE TWIN 48' RCP 9 I i II DITCH -- —�U'- STA +616 0 48 RCP INV Rx3D NO ACQSS /� —_ - -_� STA 2+524 - - - - - -- -__ -- — -- - -- 3 +00 315 1 0 +00 1+00 2 +00 1 — 1 �r I �I TWIN 48' RCF 6 I dnlI I l 5TA 3 +05 O 48' CMP 151 MID— 2A —.1 6 Ly �ITA3+0l 0 49' CMP O01NV (OUD 26 10 25 3 +00 LEGEND ROW = RIGHT OF WAY B-B = BACK OF CURB TO BACK OF CURB DB - DEED BOOK MB = MAP BOOK PG = PAGE TOB = TOP OF BANK TOE = TOE OF BANK CMP = CORRUGATED METAL PIPE y> R�CoP1f - REINFORCED CONCRETE PIPE V4. CHECK DAM SILT FENCE TREE PROTECTIONFENCE INV - INVERT N - NORTH 5 = SOUTH 5TA = STATION —31— MINOR CONTOUR —3D— MAJOR CONTOUR WR77CAL GRAPHIC SCALE 4 1 0 ( IN FEET ) 1 k, -2R .,,CNTAL GRAPHIC SCALE 20 0 10 20 40 ( IN FEET ) 1 xrch - 20 /t REVISIONS >.0000000 i J Q J O za v W wwLu zJwoZ wa gW�Mz V W c.i Y V NLL�m� u _ 5 (� OWZ W cr. F Q Q w € 219 D !Hg �# IJ ma 9� Sp 'n Cmm� •��s � I(� °o WoZ SEAL 17376 � c P.j. Wm ;FT D-WQ BY KiW 0—BY f CMdmO BY FDT P4f)wlN -w W12107 D.WN N-W WS1.5B 8rak NOR 11 20 VER 11 Z DAfe SFPfEMBEiiR 2012 C -3 +DIP FOOT BRIDGE SEWER MNN CROSSING TOP 31 0 D 2'W I P p� " - O O O =— L 1 a m - -a - -- O O — _0_ -__ -� v o U —d -- O O — _-- - - -1 -- u-- ' - -� O O — _�-- N CENTERUNE TWIN 48' RCP 9 I i II DITCH -- —�U'- STA +616 0 48 RCP INV Rx3D NO ACQSS /� —_ - -_� STA 2+524 - - - - - -- -__ -- — -- - -- _� —-� —� 15 RCP INV 26 90 (4 G Lt) - — — 5T NV za 71 (5 4 R6 CENTERUNE q.2 5TA 2 +23 9 48 RCF INV Rye 27 74 (2.7 W I _4-&V R )INV(OU))27156(28�Ly 0�1 9TA 2237 48' RCP INV(,. 2763 (2 iRf) 0 +00 1+00 2 +00 1 — 1 �r I �I TWIN 48' RCF 6 I dnlI I l 5TA 3 +05 O 48' CMP 151 MID— 2A —.1 6 Ly �ITA3+0l 0 49' CMP O01NV (OUD 26 10 25 3 +00 LEGEND ROW = RIGHT OF WAY B-B = BACK OF CURB TO BACK OF CURB DB - DEED BOOK MB = MAP BOOK PG = PAGE TOB = TOP OF BANK TOE = TOE OF BANK CMP = CORRUGATED METAL PIPE y> R�CoP1f - REINFORCED CONCRETE PIPE V4. CHECK DAM SILT FENCE TREE PROTECTIONFENCE INV - INVERT N - NORTH 5 = SOUTH 5TA = STATION —31— MINOR CONTOUR —3D— MAJOR CONTOUR WR77CAL GRAPHIC SCALE 4 1 0 ( IN FEET ) 1 k, -2R .,,CNTAL GRAPHIC SCALE 20 0 10 20 40 ( IN FEET ) 1 xrch - 20 /t REVISIONS >.0000000 i J Q J O za v W wwLu zJwoZ wa gW�Mz V W c.i Y V NLL�m� u _ 5 (� OWZ W cr. F Q Q w € 219 D !Hg �# IJ ma 9� Sp 'n Cmm� •��s � I(� °o WoZ SEAL 17376 � c P.j. Wm ;FT D-WQ BY KiW 0—BY f CMdmO BY FDT P4f)wlN -w W12107 D.WN N-W WS1.5B 8rak NOR 11 20 VER 11 Z DAfe SFPfEMBEiiR 2012 C -3 �i NI �I -I NI �I N a �F gy6 9 i 100 35 30 25 50 0 50 100 150 35 40 GROUND PROFILE 30 30 I �G 1 � I I I 1 I I 1 � I I _- - - -- PROFILE 11 111 3' I PAVEMENT PROFILE I ^� 30 0 PROTECT ALL SLOPES 2 I OR " I �° I -- � — 5TEEPER WITH TEMPORARY_ — I 4 - - -_— - -_ —__ i 48 RCP N INV (OUT) 27 I G — (REMOVE) HORIZONTAL GRAPHIC SCALE ER05ION CONTROL MATTING USE 5150 A5 MANUFACTURED 111 — BY NORTH AMERICAN GREEN = T= 1 r -- _ - -- I 1 - -- OR APPROVED EQUAL PROTECT ALL 5LOPE5 2 1 OR / I� 48' RCP 5 INV (IN) 27 G3 (REMOVE) `45° RCP N INV (IN) 27 74 (REMOVE) — _ —__ -- —___ 5TEEPER WITH TEMPORARY -- 1 — 1 ER0510N CONTROL MATTING USE 5150 AS MANUFACTURED _ BY NORTH AMERICAN GREEN —A 100 50 0 50 100 150 40 30 35 25 30 35 30 20 20 25 1 1 25 100 O ° 100 15 H_ SECTION G —G —NORTH 0 100 50 0 50 100 150 D S SOUTH— SECTION H —H (CENTERLINE EASTBROOK DRIVE) — NORTH --I- (STA 1+74 9) (STA 2 +00.0) 100 50 0 50 100 50 0 50 50 0 50 4u 35 30 25 I 30 30 I �G 1 � I I I 1 I I 1 � I I - - - -_ -- I— � GROUND _- - - -- PROFILE PAVEMENT PROFILE I PAVEMENT PROFILE - 30 0 — -- — -- 30 -- � ( IN FEEr ) WASHOUT i.M -2R 48° RCP 5 INV (OUT - NO ACCE55) _ RREEMOVEL— 48 RCP N INV (OUT) 27 I G — (REMOVE) HORIZONTAL GRAPHIC SCALE - - - - - -- — — = T= 1 r -- _ - -- I 1 -- PROTECT ALL 5LOPE5 2 1 OR / I� — — — _ —__ -- —___ 5TEEPER WITH TEMPORARY -- 1 — 1 ER0510N CONTROL MATTING USE 5150 AS MANUFACTURED _ BY NORTH AMERICAN GREEN —A OR APPROVED EQUAL 48 RCP 48' RCP (REMOVE) (REMOVE) 30 35 25 30 35 30 20 20 25 1 1 25 100 O ° 100 15 H_ SECTION G —G —NORTH 0 100 50 0 50 100 150 D S SOUTH— SECTION H —H (CENTERLINE EASTBROOK DRIVE) — NORTH --I- (STA 1+74 9) (STA 2 +00.0) 100 50 0 50 100 50 0 50 50 0 50 4u 35 30 25 4V 4U 35 I 30 30 0 z GROUND PROFILE �G 1 � I I I 1 I I 1 � I I - - - -_ -- I— � GROUND _- - - -- PROFILE I � I PROTECT ALL SLOPES 2 1 OR 5TEEPER WITH TEMPORARY -- 'A ER0510N CONTROL MATTING I USE 5150 AS MANUFACTURED BY NORTH AMERICAN GREEN OR APPROVED EQUAL W I 1 - 30 0 0 3 30 ( IN FEEr ) i.M -2R 48° RCP 5 INV (OUT - NO ACCE55) _ RREEMOVEL— 48 RCP N INV (OUT) 27 I G — (REMOVE) HORIZONTAL GRAPHIC SCALE 4V 4U 35 35 30 30 0 z GROUND PROFILE �G 35 3 I 0 z GROUND PROFILE I - 1 � I I I 1 I I 1 � I 35 3 35 ICRTICAL GRAPHIC SCALE a 1 30 0 0 3 30 ( IN FEEr ) i.M -2R HORIZONTAL GRAPHIC SCALE 20 0 IO 20 40 I - iI I ~ -- � GROUND PROfILi 1 � i 1 1 1 If I _ — 35 30 1 7C 100 l — SOU ° TH— SECTION J — J — NORTH — , 100 11- SOUTH- SECTION K — K — NORTH -0- SOUTH— SECTION L — L — NORTH (STA 2 +25.2) (STA 2 +50.4) (STA 2 +76 0) annnonnnnill J Q J O W w�>� J�Ozz Lu W J M z w�VY0 ��' �Q� U. CL 0 C1 O YW> N O z C) Ul m U. co ZO Q F— w u CBe A 8 I y gg U a� ��Wma D7 h� o •was n �tr `1 s� ,dtss% 9' 17376 ,PCINF�� �c .G ROTS. Projwhf wer FDT Pmw EnObear STA DogWW By KIW D— Br JHT ci r By FM PIo)eCNUmber 3013107 Drm4y NiFnOer W3108 8ulx HOR 1 = 20 VEk t'=2 Deb. 8EPfENBER28 M13 C -5 35 30 1 7C 100 l — SOU ° TH— SECTION J — J — NORTH — , 100 11- SOUTH- SECTION K — K — NORTH -0- SOUTH— SECTION L — L — NORTH (STA 2 +25.2) (STA 2 +50.4) (STA 2 +76 0) annnonnnnill J Q J O W w�>� J�Ozz Lu W J M z w�VY0 ��' �Q� U. CL 0 C1 O YW> N O z C) Ul m U. co ZO Q F— w u CBe A 8 I y gg U a� ��Wma D7 h� o •was n �tr `1 s� ,dtss% 9' 17376 ,PCINF�� �c .G ROTS. Projwhf wer FDT Pmw EnObear STA DogWW By KIW D— Br JHT ci r By FM PIo)eCNUmber 3013107 Drm4y NiFnOer W3108 8ulx HOR 1 = 20 VEk t'=2 Deb. 8EPfENBER28 M13 C -5 annnonnnnill J Q J O W w�>� J�Ozz Lu W J M z w�VY0 ��' �Q� U. CL 0 C1 O YW> N O z C) Ul m U. co ZO Q F— w u CBe A 8 I y gg U a� ��Wma D7 h� o •was n �tr `1 s� ,dtss% 9' 17376 ,PCINF�� �c .G ROTS. Projwhf wer FDT Pmw EnObear STA DogWW By KIW D— Br JHT ci r By FM PIo)eCNUmber 3013107 Drm4y NiFnOer W3108 8ulx HOR 1 = 20 VEk t'=2 Deb. 8EPfENBER28 M13 C -5 �I NI �I EROSION CONTROL PROVISIONS 1) NO PERSON MAY INITIATE A LAND DISTURBING ACTIVITY BEFORE NOTIFYING THE CRY OF GREENVILLE OF THE DATE THAT THE LAND D15TUR51NG ACTIVITY WILL BEGIN 2) LAND DISTURBING ACTIVITY BEYOND THAT REQUIRED TO INSTALL APPROPRIATE EROSION CONTROL MAY NOT PROCEED UNTIL EROSION CONTROL MEASURES ARE INSPECTED AND APPROVED BY THE CITY 3) SCHEDULING OF A PRE- CON5TRUCTION CONFERENCE WITH THE ERD51ON CONTROL INSPECTOR 15 REQUIRED PRIOR TO INITIATING LAND DI5TURBING ACTIVITIES FOR INSPECTION CALL (252) 329 -4467 24 HOUR NOTICE 15 REQUIRED 4) INSTALL ROCK INLET SEDIMENT TRAPS AROUND ALL CATCH BA51N5 DROP INLETS AND YARD INLETS 5) PROVIDE 20 X SO X G' STONE CONSTRUCTION ENTRANCES AS SHOWN ON PLAN 6) SEED OR OTHERWISE PROVIDE GROUND COVER DEVICES OR 5TRUCTURE5 SUFFICIENT TO RESTRAIN EROSION FOR ALL EXPOSED SLOPES WITHIN 7 DAYS OF COMPLETION Of ANY PHASE OF GRADING ON PERIMETER AREAS AND SLOPES STEEPER THAN 3 1 ALL OTHER AREAS SHALL BE 5TA5IUZED WITHIN 14 DAYS 7) CONTRACTOR SHALL INSPECT AND MAINTAIN AS NEEDED ALL ER05ION CONTROL DEVICES ON A WEEKLY BA515 AND AFTER EACH MAJOR STORM EVENT FAILURE TO KEEP ALL EROSION CONTROL DEVICES IN PROPER WORKING ORDER MAY RESULT IN A 5TOP WORK ORDER OR CIVIL PENALTIES UP TO $5000 00 PER DAY OF VIOLATION 8) THE CITY ENGINEER RESERVES THE RIGHT TO REQUIRE ADDITIONAL EROSION CONTROL MEASURES SHOULD THE PLAN OR IP5 IMPLEMENTATION PROVE TO BE INADEQUATE 9) ACCEPTANCE AND APPROVAL OF TH15 PLAN 15 CONDITIONED UPON YOUR COMPLIANCE WITH FEDERAL AND STATE WATER QUALITY LAWS REGULATION AND RULES IN ADDITION LOCAL CITY AND COUNTY ORDINANCES OR RULES MAY AL50 APPLY TO TH15 LAND D15TURBING ACTIVITY APPROVAL BY THE CITY DOES NOT SUPERSEDE ANY OTHER PERMIT OR APPROVAL 10) PLEASE BE ADVISED OF THE RULES TO PROTECT AND MAINTAIN EXISTING BUFFERS ALONG WATER COURSES IN THE NEU5E AND TAR RIVER BASINS THESE RULES ARE ENFORCED BY THE DIVISION OF WATER QUALITY (DWQ) DIRECT ANY QUESTIONS ABOUT THE APPIUCABIUTY OF THESE RULES TO YOUR PROJECT TO THE REGIONAL WATER QUALM SUPERVISOR, WASHINGTON REGIONAL OFFICE AT (252) 946 -6481 EROSION CONTROL MEASURES 1) ALL WORK WILL BE DONE IN ACCORDANCE WTRL THE CITY OF GREENVILLE EROSION CONTROL ORDINANCE NO LAND DISTURBING ACTIVITY BEYOND THAT REQUIRED TO INSTALL THE APPROPRIATE EROSION CONTROL MEASURES MAY PROCEED UNTIL MEASURES ARE INSPECTED AND APPROVED BY THE CITY OP GREENVILLE CALL 329 4467 TO SCHEDULE AN INSPECTION 2) FOLLOWING SITE CLEARING ALL STORM DRAINAGE CULVERTS AND STRUCTURES SHALL BE INSTALLED ROCK INLET SEDIMENT TRAPS SHALL BE PLACED AROUND ALL DRAINAGE 5TRUCTLJRn TO COLLECT SURFACE RUNOFF AND CONTROL SILTATION AND RELEASE WATER AT A GRADUAL RATE ALL EASEMENTS OUTSIDE THE PARKING LOT WHERE STORM PIPE5 ARE INSTALLED WILL BE GRADED SEEDED AND MULCHED 3) PARKING LOTS SHALL HAVE STONE BASE PLACED ON THEM FOR STABILIZATION AND SHOULDERS SHALL BE SEEDED TO STABILIZE THE SOIL SEED BED PREPARATION SHALL BE CONDUCTED ACCORDING TO NORTH CAROLINA DEPARTMENT Of TRANSPORTATION STANDARD 5PECIFICATION5 FOR RDAD5 AND 5TRUCTURE5 (DO T ) THE GROUND SURFACE SHALL BE CLEARED OF STUMPS 5TONE5 ROOTS CABLES 'WIRE GRADE 5TAKE5 AND OTHER MATERIALS THAT MIGHT HINDER PROPER GRADING TILLAGE SEEDING OR SUBSEQUENT MAINTENANCE OPERATIONS GRADES ON THE AREA TO BE SEEDED SHALL BE MAINTAINED IN A TRUE AND EVEN CONDITION MAINTENANCE SHALL INCLUDE ANY NECESSARY REPAIRS TO PREVIOUSLY GRADED AREA5 ALL GRADED AREAS SHALL BE THOROUGHLY TILLED TO A DEPTH OP AT LEAST FOUR (4) INCHES BY PLOWING DISKING HARROWING OR OTHER APPROVED METHODS UNTIL THE CONDITION OF THE SOIL 15 ACCEPTABLE ON SITES WHERE 501L CONDITIONS ARE SUCH THAT HIGH CLAY CONTENT AND EXCESSIVE COMPACTION CAUSE DIFFICULTY IN GETTING CLODS AND LUMP5 EFFECTIVELY PULVERIZED THE CONTRACTOR SHALL USE THE ROTARY TILLAGE MACHINERY UNTIL THE MIXING OF THE 501L 15 ACCEPTABLE AND NO CLODS OR CLUMPS REMAIN LARGER THAN I Y2 INCHES IN DIAMETER A FIRM AND COMPACT SEED BED IS REQUIRED AND AFTER BEING GRADED THE SEED BED SHALL E LIGHTLY COMPACTED WITH I LAND ROLLER SUCH AS AMESTONE CONTAINING BEFORE AND AFTER SEWING LIMESTONE SHALL 51 DOLOMITIC AGRICULTURE GROUND LIMESTONE CONTAINING NOT LESS THAN 10 PERCENT MAGNESIUM OXIDE UME SHALL BE UNIFORMLY APPLIED AT THE RATE OF 2 TONS PER ACRE FERTILIZER SHALL BE UNIFORMLY APPLIED AT E RATE OF E LI POUNDS PER ACRE OF Hn OF ANALYSIS THE FERTILIZER PRIOR SHALL E INCORPORATED INTO THE UPPER THREE E FOUR INCHES LI PREPARED SEED BED JUST PRIOR TO THE LAST TILLAGE OPERATION BUT IN NO CASE SHALL IT D APPLIED MORE THAN THREE DAYS PRIOR TO SEEDING FERTILIZER SHALL BE USED IMMEDIATELY AFTER DELIVERY OR STORED E A MANNER THAT WILL NOT PERMIT IT TO HARDEN SMALL DESTROY LIE EFFECTIVENESS WHEN HSEED USING G EQUIPMENT IS USED FOR SEEDING FERTILIZER SHALL E APPLIED SIMULTANEOUSLY WITH SEED USING THE ABOVE RATES OF APPLICATION SEED SHALL BE CERTIFIED SEED EQUIVALENT BASED ON NORTH CAROLINA SEED IMPROVEMENT ASSOCIATION REQUIREMENTS FOR CEREK TIFICATION ALL SEED SHALL FURNISHED IN SEATED STANDARD CONTAINERS SEED WHICH HAS BECOME WET MOLDY OR OTHERWISE DAMAGED PRIOR TO SEEDING WILL NOT BE ACCEPTABLE SEEDING SHALL BE ACCOMPLISHED ITH HAND PLANTERS POWER -DRAWN PLANTERS HAND PECKERS OR HYDROSERDING EQUIPMENT NT AT AT THE HE FOLLOWING RATES PERMANENT SEEDING SCHEDULE (ENTIRE 51TE) SEED BED PREPARATION UME - 2 TONS PER ACRE FERTILIZER (10.20 -20) - 500 POUNDS PER ACRE SEEDING MD(TURE (JANUARY I - MARCH 31) COMMON BERMUDA GRA55 (UNHULLED) - 20 POUNDS PER ACRE RYE (GRAIN) - 25 POUNDS PER ACRE (APRIL I -JULY 31) COMMON BERMUDAGRA55 (NULLED) -15 POUNDS PER ACRE WEEPING LOVEGRA55 5 POUNDS PER ACRE CENTIPEDE 8 POUNDS PER ACRE (AUGUST 1 DECEMBER 31) COMMON BERMUDA GRA55 (UNHULLED) 20 POUNDS PER CARE TALL FESCUE - GO POUNDS PER ACRE RYE (GRAIN) - 25 POUNDS PER ACRE SEED BED PROTECTION STRAW MULCH -2 TONS PER ACRE (VISUAL) ASPHALT TACK - O 03 GALLONS PER SQUARE YARD 4) GROUND STABILIZATION (PER NCGO 10000) A) SOIL 5TABIUZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND- DISTURBING ACTIVITIE5 HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE 1) ALL PERIMETER DIKES 5WAUn DITCHES PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3 1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND - DISTURBING ACTIVITY IU ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS 50ON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND - DISTURBING ACTIVITY B) CONDITIONS - IN MEETING THE 5TABIUZAT10N REQUIREMENTS ABOVE THE FOLLOWING CONDITION5 OR EXEMPTIONS SHALL APPLY 1) EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE 11) ALL SLOPES 50 IN LENGTH OR GREATER SHALL APPLY THE GROUND COVER WITHIN 7 DAYS EXCEPT WHEN THE SLOPE 15 FLATTER THAN 4 1 SLOPES LE55 THAN 50 SHALL APPLY GROUND COVER WITHIN 14 DAYS EXCEPT WHEN SLOPES ARE STEEPER THAN 3 1 THE 7 DAY REQUIREMENT AFFUE5 III) ANY SLOPED AREA FLATTER THAN 4 1 SHALL BE EXEMPT FROM THE 7 DAY GROUND COVER REQUIREMENT IV) 5LOFE5 10' OR LE55 IN LENGTH SHALL BE EXEMPT FROM THE 7 DAY GROUND COVER REQUIREMENT EXCEPT WHEN THE SLOPE 15 STEEPER THAN 2 1 V) ALTHOUGH STABILIZATION 15 USUALLY SPECIFIED AS GROUND COVER OTHER METHODS SUCH AS CHEMICAL STABILIZATION MAY BE ALLOWED ON A CASE BY -CASE BASIS VI) FOR PORTION5 OF PROJECTS WITHIN ONE MILE AND DRAINING TO TROUT WATERS AND HIGH QUALITY WATERS AS CLA551FIED BY THE ENVIRONMENTAL MANAGEMENT COMM155ION STABILIZATION WITH GROUND COVER SHALL BE ACHIEVED AS 50ON AS PRACTICABLE BUT IN ANY EVENT ON ALL AREAS OF THE SITE WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACT VII) FOR FORTION5 OF PROJECTS LOCATED IN OUT51FANDING RF50URCE WATERS WATERSHEDS AS CLASSIFIED BY THE ENVIRONMENTAL MANAGEMENT COMMISSION STABILIZATION WITH GROUND COVER SHALL BE ACHIEVED AS SOON AS PRACTICABLE BUT IN ANY EVENT ON ALL AREAS WITHIN 7 CALENDAR DAYS FROM THE LAST LAND - DISTURBING ACT VIN) PORTIONS OF A SITE THAT ARE LOWER IN ELEVATION THAN ADJACENT DISCHARGE LOCATIONS AND ARE NOT EXPECTED TO DISCHARGE DURING CONSTRUCTION MAY BE EXEMPT FROM THE TEMPORARY GROUND COVER REQUIREMENTS IF IDENTIFIED ON THE APPROVED E45C PLAN OR ADDED BY THE PERMITTING AUTHORITY PERMANENT SEEDING SCHEDULE (ENTIRE SITE) CONTINUED 5) SELF INSPECTION AND REPORTING REQUIREMENTS (PER NCGO 10000) MINIMUM SELF INSPECTION AND REPORTING REQUIREMENTS ARE AS FOLLOWS UNLE55 OTHERWISE APPROVED IN WRITING BY THE DM51ON OF WATER QUALITY A) A RAIN GAUGE SHALL BE MAINTAINED IN GOOD WORKING ORDER ON THE SITE UNLESS ANOTHER RAIN MONITORING DEVICE HAS BEEN APPROVED BY THE PERMITTING AUTHORITY B) A WRITTEN RECORD OF THE DAILY RAINFALL AMOUNTS SHALL BE RETAINED AND ALL RECORDS SHALL BE MADE AVAILABLE TO DWQ OR A1JTHORIZW AGENT UPON REQUEST (NOTE IF NO RAINFALL OCCURRED THE PERMTTTM MUST RECORD *ZERO') C) ER05ION AND SEDIMENTATION CONTROL MEASURES SHALL Be IN5PECTED TO ENSURE THAT THEY ARE OPERATING CORRECTLY INSPECTION RECORDS MUST BE MAINTAINED FOR EACH INSPECTION EVENT AND FOR EACH MEASURE AT A MINIMUM INSPECTION OF MEASURES MUST OCCUR AT THE FREQUENCY INDICATED BELOW 1) ALL EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE INSPECTED BY OR UNDER THE DIRECTION OF THE PERM(TTEE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS 11) ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSPECTED BY OR UNDER THE DIRECTION OF THE FERMITTEE WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN O 50 INCHES OF RAIN PER 24 HOUR PERIOD III) TIMES WHEN A DETERMINATION THAT ADVERSE WEATHER CONDITIONS PREVENTED INSPECTIONS SHOULD BE DOCUMENTED ON THE INSPECTION RECORD D) ONCE LAND DISTURBANCE HAS BEGUN ON THE SITE 5TORMWATER RUNOFF DISCHARGE OUTFALL5 SHALL BE INSPECTED BY OBSERVATION FOR ER05ION SEDIMENTATION AND OTHER STORMWATER DI5CHARGE CHARALTER15TIC5 SUCH AS CLARITY FLOATING 5OUD5 AND OIL SHEENS INSPECTIONS OF THE OUTFALL5 SHALL BE MADE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WrMIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN O 50 INCHES OF RAIN PER 24 HOUR PERIOD E) INSPECTIONS ARE ONLY REQUIRED TO BE MADE DURING NORMAL BUSINESS HOURS WHEN ADVERSE WEATHER CONDITIONS WOULD CAUSE THE SAFETY OF THE INSPECTION PERSONNEL TO BE IN JEOPARDY THE INSPECTION CAN BE DELAYED UNTIL IT IS DEEMED SAFE TO PERFORM THESE DUTIES IF THE INSPECTION CANNOT BE DONE ON THAT DAY IT MUST BE COMPLETED ON THE FOLLOWING BLI54NE55 DAY F) TWENTY FOUR HOUR REPORTING POR VISIBLE SEDIMENT DEPOSITION 1) THE PERMITTEE SHALL REPORT TO THE DIVISION OF WATER QUALITY CENTRAL OFFICE OR THE G) AU5T INCLUDE AT A MINIMUM ING PROPERLY RE OW5 MUST INCLUDE AT A MINIMUM SUCH AS OIL SHEEN FLOATING OR AND INSPECTION RECORDS MUST INCLUDE OL FUTURE RELEA5E5 M THAT HAS LEFT THE SITE LIMITS AND J5 ALL INSPECTIONS SHOULD INCLUDE TTE (WHERE ACCESSIBLE) TO DETERMINE IF V) V151BLE STREAM TURBIDITY IF THE DISCHARGE FROM A SITE RESULTS INVISIBLE STREAM TURBIDITY INSPECTION RECORDS MUST RECORD THAT EVIDENCE AND ACTIONS TAKEN TO REDUCE SEDIMENT CONTRIBUTIONS SITES DISCHARGING TO STREAMS NAMED ON THE 5TATV5 303(D) L15T AS IMPAIRED FOR SEDIMENT- RELATED CAUSES MAY BE REQUIRED TO PERFORM ADDITIONAL MONITORING INSPECTIONS OR APPLICATION OF MORE STRINGENT MANAGEMENT PRACTICES IF IT 15 DETERMINED THAT THE ADDITIONAL REQUIREMENTS ARE NEEDED TO A55UKE COMPLIANCE WITH THE FEDERAL OR STATE IMPAIRED WATERS CONDITIONS IF A DISCHARGE COVERED BY THIS PERMIT ENTERS A STREAM SEGMENT THAT LS LISTED ON THE IMPAIRED STREAM UST FOR SEDIMENT RELATED CAUSES AND A TOTAL MAXIMUM DAILY LOAD (TMDU HAS BEEN PREPARED FOR THOSE FOLLUTANT5 THE PERMTTTEE MUST IMPLEMENT MEASURES TO ENSURE THAT THE DISCHARGE OF POLUITANTS FROM THE SITE 15 CONSISTENT WITH THE ASSUMPTIONS AND MEETS THE REQUIREMENTS OF THE APPROVED TMDL THE DWQ 303(D) UST CAN BE FOUND AT HTTPJ/1120 ENRSTATE NC U51TMDUGENERAL 303D HTW 6) ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL REMAIN IN PLACE AND BE MAINTAINED BY THE CONTRACTOR UNTIL ALL SEEDING 15 ESTABLISHED AND CONSTRUCTION AREAS HAVE BEEN STABILIZED 7) TEMPORARY SEEDING SEED IN ACCORDANCE WITH SOIL CONSERVATION SERVICE RECOMMENDATIONS WITH REGARD TO SEED TYPE RATE OF APPLICATION FEKTIUZER. ETC TEMPORARY GRAVEL CONSTRUCTION ENTRANCE NT5 DUN L 4C DETAIL41) ANCHOR TRENCH ANCHOR TRENCH' ER0510N CONTROL MATTING DETAIL NI-5 1) PLACE STONE TO THE UN2 AND DIMENSION SHOWN W THE PLAN ON A FILTER FABRIC FOUNDATION 21 NTT THE CENTIRSTONE 5ECTION AT LWT 9 INCHES BELOW NATURAL GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS 31 EXTEND STONE AT LEAST 1 5 FEET BEYOND THE DITCH BANK TO KEEP WA1ER FROM CURING AROUND THE ENDS OF THE CHECK DAM 4) SET SPACING BETWEEN DAIS TO A55UM THAT THE ELEVATION AT THE TOP Of THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAN 5) FROMM THE CHANM 3. AFTER THE LOV45T CHECK DAM FROM HEAR FLOW THAT COLD CAUSE EROSION Q MAKE SURE THAT THE CHANNEL REACH ABOVE THE M05T UP5TRpW 19 STABLE 7) ENSURE THAT OTHER AREAS Of THE CHANNE, SUCH AS CULVERT ENTRANCES B THE CHECK DIVAS ARE NOT 5UB)ECT TO DAMAGE OR BLOCKAGE FROM DISPLACED STONES DESIGN CRITERIA THE DRNNAGt ARfA 5 UMHED TO ONE HNP ACRE KEEP A MNOMUM HpGHT OP 2 PITT AT THE CENTER I Y OF NCDOT 15 OR Or THE DNA K TH[ CpNTBR OF THE CHECK DAM AT LEAST 9 a4HE5 LOWM THN1 THE OUTER EDGES 057 WASHED STONE AT NATURAL GROUND ELEVATION KEEP THE SIDE 51OPE5 OF THE DAM AT 2 1 OR MT7FA ENSURE iMAT 1 5 THE MAXIMUM SPACING BETWEEN DAMS PLACES THE TOE OF THE UPSTREAM DAM AT THE SAME ELEVATION AS THE TOP OF THE DOWNSTREAM DAM 5TABIUZE OUTFLOW AREAS ALONG THE CHANNEL TO RESIST MMON USE NCDOT CLASS B STONE AND LINE THE UPSTREAM SIDE OF THE DAM WITH NODOT 05 OR CLASS B RIP RAF O 057 STONE KEYTHE STONE INTO THE DITCH BANKS AND EXTEND IT BEYOND THE ABUINRNT5 AMINIMUM "D OF 15 FEET TO AVOID WASHOUT FROM OVERFLOW AROUND THE DAM 2 MOAT 1 5 MIN MITER FA5WC QMER iL 9 MW - Z-1 IFU3 Y Vr� 011_ 4 TC 017' OS�C�S -OO` xb, 1 ELICIT FABRIC PLAN VIEW CHECK DAM DETAILS SEE DENR STANDARDS AND 5MIFCATLON5 FOR COMPLETE DESIGN CRITERIA AND MAINTENANCE VARIABLE AS DIRECTED BY EHGINFER IN MAY wJ MIRE I2 GNIGE 414 WELDED WIRE FABRIC ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ STEEL PEST WIRE FABRIC W RESISTANT GEOTEIRTRE FABRIC TAMP® BACKEILL GROUND LINE BURP FABRlC6 MRN TEMPORARY SILT FENCE NT5 NT5 GENERAL NOTES CR055- 5ECTION VIEW L e THE DISTANCE SLOT THAT POINTS A AND B ARE OF EOUAL ELEVATION egg lll_!11_llll lll1111_Ill�llll_tlll_ - d°h iucrm_lur�lnrm)� 51DE VIEW Ilu CONTRACTION JOINTS SHALL BE SPACED AT 1 O INTERVALS EXCEPT THAT A 15' 5PACING MAY BE USED WHEN A MACHINE 15 USED OR WHEN SATISFACTORY 5UPPORT FOR THE FACE FORM CAN BE OBTAINED WITHOUT THE USE OF TEMPLATES AT I O INTERVALS JOINT SPACING MAY BE ALTERED BY THE ENGINEER TO PREVENT UNCONTROLLED CRACKING CONTRACTION JOINTS MAY BE INSTALLED BY THE USE OF TEMPLATES OR FORMED BY OTHER APPROVED METHODS WHERE SUCH JOINTS ARE NOT FORMED BY TEMPLATES A MINIMUM DEPTH OF I h' SHAD. BE OBTAINED ALL CONTRACTION JOINTS SHALL BE FILLED WITH JOINT FILLER EXPANSION JOINTS SHALL BE SPACED AT 90 INTERVALS AND ADJACENT TO ALL RIGID OBJECTS ALL CURB AND GUTTERS ARE TO BE POURED WITH CLA55'A" CONCRETE (3000 P51) FIi(ABLE FORMS ARE TO BE USED WHEN RADII 15 LE55 THAN 200 24" CONCRETE CURB AND GUTTER STANDARD 2' -0" CURB AND GUTTER NT5 REVISIONS J a J 0 z1 W Zv W W W � i w Oz a5;LLla oW Jmz O V Y V p (D WZ� z LL � ma IF- 03 a M J c°u�YW> V O ~ W W 0 LL r a LL a� W 1114 11 1z 9� F !1 U N W yU • Poo o6 �F �i z SEAL 17376 PM IW N..dw M12107 I) C-6