HomeMy WebLinkAboutNCC211874_MODIFICATION Supporting Doc LOTS 187-188 195-196_20220117ROY COOPER
Governor
ELIZABETH S. B1SER
Secretary
BRIAN WRENN
Director
NVR, Inc
ATTN: Joe Schmidtke, Vice President
5734 Trinity Road, Suite 200
Raleigh NC 27607
NORTH CAROUNA
Environmental Quality
January 5, 2022
LETTER OF APPROVAL
RE: Project Name: Coble Farms —Lots 187, 188, 195, 196
Acres Approved: 0.78
Project ID: HARNE-2022-067
County: Harnett
City: Angier
Address: SR 1415
River Basin: Cape Pear
Stream Classification: Other
Submitted by: NVR, Inc.
Date Received by LQS: December 8, 2021
Plan Type: NEW - Residential
Dear Mr. Schmidtke:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and
hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan
shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as
required by Title 15A NCAC 4B.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of
Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General
Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for
the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to
commencement of any land disturbing activity. The eNOI form may be accessed at dcq.nc.gov/NCG0 Please
direct questions about the eNOI form to the S_tormwater Program staff in the Raleigh central office. If the
owner/operator of this project changes in the future, the new responsible party must obtain a new COC.
...�—..
North Carolina Department of Environmental Quality 1 Division of Energy,,Mineral and Land Resources
+•� 16 � Fayetteville Regional Office 1 225 Creen Street, Suite 7141 Fayetteville, North Carolina 28301
oa'u crs vm
� v�
a4ct EsrlttmmmYal 'NNW*
410,433.330Ci
Letter of Approval
NVR, Inc.
January 5, 2022
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the
job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO 1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
This letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance
with the approved plan.
Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job
site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing
natural resources and adjoining properties. If, following the commencement of this project, it is determined that the
erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and
implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the
information included on the form. This permit allows for a land -disturbance, as called for on the application plan,
not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised
plan and additional application fee. In addition, it would be helpful if you notify this office of the proposed starting
date for this project. PIease notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Ti othy L. La ty, PE
Regional Engineer
DEMLR
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
cc: NVR, Inc. (via email)
Landon Chandler, Harnett County (via email)
Fayetteville Regional Office — DEMLR file
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Fayetteville Regional office 1 225 Green Street, Suite 7141 Fayetteville, North Carolina 28301
4�iE7 �1 C;J=A:� ISM
napammnrrsr �nrrmn:nemnrea�� �/"� 91Q.433,3300
CERTIFICATE OF PLAN APPROVAL
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 4B.0127 (b).
Coble Farms -Lots 187, 188, 195, 196 — Harnett County
Project Name and Location
January 5, 2022 �Ze= = = —
Date of Plan Approval Regional Engineer
Certificate of Coverage Number