Loading...
HomeMy WebLinkAboutSW8060112_Current Permit_20080911Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Coleen H. Sullins Director Division of Water Quality September 11, 2008 Takeru Kamiyama True Worid Marine, LLC 1145 Sensation Weigh Beaufort, NC 28516 Subject: Approved Plan Revision Lot 10 - Jarrett Bay Industrial Park 1401 Sensation Weigh, Beaufort, NC Stormwater Project No. SW8 060112 Plan Revision Carteret County Dear Mr. Kamiyama: On August 11, 2008, the Wilmington Regional Office received a plan revision for Stormwater Management Permit Number SW8 060112. The revisions include removal of a factory that was never built. The factory and asphalt parking area were eliminated but the stormwater management system was installed. In lieu of a factory, a gravel parking lot was installed, creating an open boat storage and maintenance area. Only the sales office part of the original building was constructed. The overall built -upon impervious area remains unchanged. It has been determined that a formal permit modification is not required for the proposed changes. We are forwarding you an approved copy of the revised plans for your files. Please add the attached plans to the previously approved plan sheets. Please be aware that all terms and conditions of the permit issued on March 20, 2006 remain in full force and effect. Please also understand that the approval of this revision to the approved plans for the subject State Stormwater Permit is done on a case -by -case basis. Any other changes to this project must be submitted to and approved through the Division of Water Quality prior to construction. The issuance of this plan revision does not preclude the permittee from complying with all other applicable statutes, rules, regulations or ordinances which may have jurisdiction over the proposed activity, and obtaining a permit or approval prior to construction. If you have any questions concerning this matter, please do not hesitate to call me at (910) 796-7215. Sincerely, Steve G. Pusey Environmental Engineer ENB1sgp: WQSISTORMWATERIPERMIT1060112PR.sep08 cc: Greg Walker - W. E.C., LLC, PO Box 1923, Pawleys Island, SC 29585 Carteret County Building Inspections Steve Pusey Wilmington Regional Office Central Files N"o"�e Carolina dvatura!!r� North Carolina Division of Water Quality 127 Cardinal Drive Extension Wilmington, NC 28405 Phone (910) 796-7215 Customer Service Wilmington Regional Office Internet: www.ncwatercuality.org Fax (910) 350-2004 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer— 50% Recycled/10% Post Consumer Paper Permit No. S W 8 ®(p Q 1 j Z (to be provided by DWQ) State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM INFILTRATION BASIN SUPPLEMENT This form may be photocopied for use as an original DWQ Stormwater Management Plan Review: A complete stormwater management plan submittal includes a stormwater management permit application, an infiltration basin supplement for each system, design calculations, soils report and plans and specifications showing all stormwater conveyances and system details. I. PROJECT INFORMATION Project Name: True World Marine -Lot 10 Jarrett Bay Contact Person: Shane Lippard Phone Number: 910-251-8544 This worksheet applies to: Basin No. 1 in Drainage Area 1 (as identified on plans) (from Form SWU-101) II. DESIGN INFORMATION - Attach supporting calculations/documentation. The soils report must be Based upon an actual field investigation and soil borings. County soil maps are not an acceptable source of soils information. All elevations shall be in feet mean sea level (finsl). Soils Report Summary Soil Type Tomotley Infiltration Rate 1 ft/hr - horizontal hVhr or cVhr/sf (circle appropriate touts) SHWT Elevation 2.5 finsl (Seasonal High Water Table Elevation) Basin Design Parameters Design Storm 1.5 in.(1.5 inch event for SA waters, I inch event for others) Design Volume -2 cL 1 � q O 3 c.f. Drawdown Time 5 days Basin Dimensions -7D `?oo Basin Size -� ft. x -69- Basin Volume Provided 24;25r 2 1 01 c.f. Basin Elevations Bottom Elevation Storage Elevation Top Elevation Form SWU-103 Rev 3.99 4.5 finsl 6.0 fmsl 7.0 fmsl Page 1 of 3 f 3 "05z- ft. _�� sq.ft. (bottom dimensions) ill. REQUIRED ITEMS CHECKLIST The following checklist outlines design requirements per the Stormwater Best Management Practices Manual (NC Department of Environment, Health and Natural Resources, February 1999) and Administrative Code Section: 15 A NCAC 2H.1008. Initial in the space provided to indicate that the following design requirements have been met and supporting documentation is attached. If the applicant has designated an agent in the Stormwater Management Permit Application Form, the agent may initial below. Attach justification if a requirement has not been met. Applicants Initials [N)Sl, a. System is located 50 feet from class SA waters and 30 feet from other surface waters. JA)�L_ _ b. System is located at least 100 feet from water supply wells. lA L. c. Bottom of system is at least 2 feet above the seasonal high water table. V%L d. Bottom of the system is 3 feet above any bedrock or impervious soil horizon WNI_ e. System is not sited on or in fill material or DWQ approval has been obtained. V.1L, f. System is located in a recorded drainage easement for the purposes of operation and Maintenance and has recorded access easements to the nearest public right-of-way. URI g. Drainage area for the device is less than 5 acres. LZ 1, 4it h. Soils have a minimum hydraulic conductivity of 0.52 inches per hour and soils report is attached. lit— i. System captures and infiltrates the runoff from the first 1.0 inch of rainfall (1.5 inch event for areas draining to SA waters). Design volume and infiltration calculation attached. k%(., j. System is sized to take into account the runoff at the ultimate built -out potential from all surfaces draining to the system, including any off -site drainage. Calculations attached. OIL k. All side slopes stabilized with vegetated cover are no steeper than 3:1 (H:V). 1. A pretreatment device such as a catch basin, grease trap, filter strip, grassed swale or sediment trap provided. m. Bottom of the device is covered with a layer of clean sand to an average depth of 4 inches or dense vegetative cover is provided. ALA n. vegetated filter is provided for overflow and detail is shown on plans (Required minimum length is 50 feet for SA Waters, 30 feet for other waters). LJSI., o. Flow distribution mechanism within the basin is proved yJd(� p. A benchmark is provided to determine the sediment accumulation in the pretreatment device. tr, q. Runoff in excess of the design volume bypasses off-line systems (bypass detail provided). r. System is designed to draw down the design storage volume to the proposed bottom elevation under seasonal high water conditions within five days. A soils report and all pertinent draw -down calculations are attached. s. Plans ensure that the installed system will meet design specifications (constructed or restored) upon initial operation once the project is complete and the entire drainage area is stabilized. Form SWU-103 Rev 3.99 Page 2 of 3 IV. INFILTRATION BASIN OPERATION AND MAINTENANCE AGREEMENT 1. After every runoff producing rainfall event and at least monthly inspect the infiltratiord. stem f trash accumulation, vegetative cover, and general condition. �,+ 2. Repair eroded areas immediately, re -seed as necessary to maintain adequate vegetativeen a 2006 Vegetated cover to maintain a maximum height of six inches, and remove trash as need 3. After every runoff producing rainfall event and at least monthly inspect the bypass, inflow and overflow structures for blockage and deterioration. Remove any blockage and repair the structure to approved design specification. 4. Remove accumulated sediment form the pretreatment system and infiltration basin annually or when depth in the pretreatment unit is reduced to 75% of the original design depth. The system shall be restored to the original design depth without over -excavating. Over -excavating may cause the required water table separation to be reduced and may compromise the ability of the system to perform as designed. Removed sediment shall be disposed of in an appropriate manner and shall not be handled in a manner That will adversely impact water quality (i.e. stockpiling near a stormwater treatment device or stream, etc.) A benchmark shall be established in the pretreatment unit. The benchmark will document the original design depth so that accurate sediment accumulation readings can be taken. The measuring device used to determine the depth at the benchmark shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the design depth reads I.1 feet in the pretreatment unit, the sediment shall be removed form both the pretreatment unit and the infiltration basin. 5. If the Division determines that the system is failing, the system will immediately be repaired to original Design specifications. If the system cannot be repaired to perform its design function, other stormwater control devices as allowed by NCAC 2H.1000 must be designed, approved and constructed. I acknowledge and agree by my signature below that I am responsible for the performance of the five maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Print Name and Title: Mr. T akeru Kamiyama, President Address: A.% {, t/v7" 070-7 Phone: 412 � 'r — !� Date: JF ,:,6 Signature: i Note: The legally responsi le party should not be a homeowners association unless more than 50% of the lots have been sold and a Resident of the subdivision has been named the president. I, PaAWCaS CA- la'M 11-4 j6l a 9, ,a Notary Public for the State of N-e w Q:2 JeSrzl f , County of do hereby certify that TCLQ e p_U -kAk41%" personally appeared before me this day of "E►QvA S3 , 7-0�)bj , and acknowledge the due execution of the forgoing infiltration basin maintenance requirements. Witness my hand and official seal, SEAL My commission expires: Pone ^ to Form SWU-103 Rev 3.99 Page 3 of 3 pRANCESCA BAUSTRIERI NOTARY PUBLIC OF NEW JERSEY My Commission Expires Nov10 W10