HomeMy WebLinkAboutNCC205878_Annual Fee NOD Letter_20220118RCY COOPER
Gownor
ELIZABETH S. BISER
SPr f-Y
BRIAN WRENN
vrrq�-Xr
1 /18/2022
matt baldwin homes, LLC
Attn: matt baldwin
4009 Graham Sherron Road
Wake Forest, NC 27587
Subject: Notice of Deficiency - Failure to Pay Annual Fee
Invoice No. NCC205878-2021
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $100.00 for coverage under NPDES General Stormwater
Permit NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The
annual fee was billed on 12/1/2021 and was due on 1/1/2022. The annual fee applies to the following construction site:
Savannah Oaks PH2 Lot 41, RBPR-037365-2020
8728 Zeigler Drive, Knightdale, NC
Wake County
Certificate of Coverage No. NCC205878
NC Reference No. NCG01-2020-5878
If the project was closed out prior to the invoice date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Aziza Selkane at aziza.selkane@ncdenr.gov or me at toby.vinson@ncdenr.gov.
Sincerely,
William E. Vinson, Jr.
Chief of Program Operations
Division of Energy, Mineral, and Land Resources
+ NNIh Carallna Oe"wemc or Fnritimm agpellt¢ I DMSltn of Energy. S.9neral aM UrA Resources
■' 512 Nonh Salisbury 5Lr t 116R Mail Se MN Cemn I RaWoi. NorthC dlna 276a7-1612
ar�u
714.747.420D