Loading...
HomeMy WebLinkAbout20111000 Ver 2_Triage Check List_20140211M 401 WQC /Buffer Application To: Anthony Scarbraugh Washington Regional Office From: 401 & Buffer Permitting Unit, Central Office Date: 2/11/2014 DWQ M 11 -1000 v.2 Pea Island NWR North Project Name: Pond Bulkhead Repair & County: Dare South Pond Water Control Structure Replacement 60 -day Processing Time: 2/6/14 thru 4/7/14 ® Please review attached application /additional information. ❑ This is an Individual Permit— needs the Public Notice. ❑ This is a "Courtesy Copy" and is located in Laserfiche. ❑ Restoration Project NOT for mitigation (issued by RO). A copy has been given to Eric. ❑ Non -EEP mitigation project (issued by RO). A copy has been given to Eric. ❑ EEP full delivery project (issued by RO). A copy has been given to Eric. ❑ EEP design -bid build project (issued by RO). A copy has been given to Eric.