Loading...
HomeMy WebLinkAbout20140055 Ver 1_USACE Correspondence_20140214Homewood, Sue From: Bailey, David E SAW <David.E.Bailey2 @usace.army.mil> Sent: Friday, February 14, 2014 1:38 PM To: Thomson, Nicole J; Nicole Thomson; Parker, Jerry A Cc: Homewood, Sue; Wanucha, Dave Subject: SAW - 2014 -00305 NWP #3 NCDOT Alamance County Bridge #144 (LIBP) (UNCLASSIFIED) Attachments: NWP3_3- 23.pdf Classification: UNCLASSIFIED Caveats: NONE Nikki and Jerry, On January 17, 2014, the US Army Corps of Engineers, Wilmington District received your written notification that you intend to replace NCDOT Bridge #144 with a new bridge at the same location. The specific location where the work is planned is on SR 2361 (Russell McPherson Road) over Rock Creek in Alamance County, North Carolina. The geographic coordinates (in decimal degrees) are 35.95581° N and - 79.46103° W. Your notification indicated that you intend to permanently place fill material within 31 linear feet ( <0.01 acre) of stream channel and temporarily impact 14 linear feet ( <0.01 acre) of stream channel in order to construct the bridge to current NCDOT standards. The primary purpose for the discharge of fill material within Waters of the US is for bank stabilization. Based on the information provided in your application, including Attachment G (Low /Minimum Impact Bridge Project Data Sheet) of the 2010 Low Impact Bridge Replacement Document, your work is authorized by Nationwide Permit (NWP) 3 for Maintenance Activities provided it is accomplished in strict accordance with the attached conditions and your submitted description. Any violation of the attached conditions or deviation from your submitted description may subject the permittee to a stop work order, a restoration order and /or appropriate legal action. Attached is a copy of the NWP 3 and the applicable permit conditions. This verification is valid until the NWP is modified, reissued, or revoked. All of the existing NWPs are scheduled to be modified, reissued, or revoked prior to March 18, 2017. It is incumbent upon you to remain informed of changes to the NWPs. We will issue a public notice when the NWPs are reissued. Furthermore, if you commence or are under contract to commence this activity before the date that the relevant nationwide permit is modified or revoked, you will have twelve (12) months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this nationwide permit. The Action Identification Number for this project is SAW- 2014 - 00305. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone: 919 - 807 -6300) to determine Section 401 requirements. This response to your notification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals /permits. This electronic copy is your official Department of the Army Notification; no paper copy will be mailed, unless specifically requested. Please let me know if you have any questions regarding this permit or the conditions. You can call me at telephone (919) 554 -4884, ext 30 or contact me via e -mail at David. E. Bailey2 @ usace.army.mil. Thank you, Dave Bailey David E. Bailey Project Manager US Army Corps of Engineers CE- SAW -RG -R 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 Phone: (919) 554 -4884, Ext. 30. Fax: (919) 562 -0421 Email: David. E. Bailey2 @usace.army.mil The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http : / /regulatory.usacesurvey.com /. Classification: UNCLASSIFIED Caveats: NONE