Loading...
HomeMy WebLinkAboutNCC192638_NOT Closeout Documents_20220113ROY COOPER Governor MICHAEL S. REGAN Secretory BRIAN WRENN Dimclor NORTH CAROLINA Environmental Quality SEDIMENT AND EROSION CONTROL & CONSTRUCTION STORMWATER INSPECTION REPORT East Carolina University Attn: Mr. William E. Bagnell, Associate Vice Chancellor for Campus Operations 1001 E. Fourth Street Greenville, NC 27858 RE: ECU College Hill Drive Replacement Steam — Phase 1 (Pitt-2019-015) Dear Sir, Attached is a copy of the inspection report prepared following an onsite inspection of the project referenced on the report. This report is intended to inform you of the project's compliance with the North Carolina Sedimentation Pollution Control Act of 1973 and Construction NPDES Stormwater General Permit. Please review this report carefully as it may contain corrective actions needed and/or comments which will assist you in meeting the required performance standards. It is our desire that any and all possible problems be discussed and resolved at the earliest possible time. To facilitate this effort, please contact me at the address/phone number below should you have any questions. Sincerely, J. Randall Jones, Jr., PE Environmental Engineer (252) 946-6481 Enclosure: Sediment/Construction Stormwater Inspection Report North Carolina Department of Environmental. Quality Division of [nergy, MlmE ral and Lrnd Retiources cf�,,D—E Washington Regia€gal Office ', 941 Washington Square Mail Carolina 27681) 257946.h-t8t North Carolina Department of Environmental Quality Land Resources: 943 Washington Square Mall, Washington, NC 27889 (252) 946-6481 County: Pitt Project: ECU College Hill Dr. Replacement River basin: Tar -Pamlico Person financially responsible: East Carolina University - William E Bagnell. Project #: PITT-2019-015 Assoc. Vice Chancellor for Campus Ops. Address: 1001 East Fourth St., Greenville, NC 27858-4043 1. Project Location: College Hill Dr, Greenville Pictures: No 2. Weather and soil conditions: Sunny, Warm, Wet Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? NIA Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: February 25, 2021 10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities (NCGO1) must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: https:l/edocs.deq.nc.gov/Forms/NCGOI-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Randall Jones Date of inspection: February 24, 2021 cc: Others present: Time arriving on site: 1:30 PM Time leaving site: 1:50 PM