HomeMy WebLinkAboutNCG500153_Inspection_20180424Water. Resources
Environmental Quality
April 24, 2018
Christopher Sager
Environmental Manager
The Goodyear Tire and Rubber Company
6650 Ramsey Street
Fayetteville NC 28311
SUBJECT: Compliance Evaluation Inspection
The Goodyear Tire and Rubber Company
Permit No: NCG500153
Cumberland County
Dear Mr. Sager:
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
LINDA CULPEPPER
• Interim Director
Enclosed please find a copy of the Compliance Evaluation Inspection form from the inspection.
conducted on April 17, 2018. The Compliance Evaluation Inspection was conducted by Johnathan
Watts, Environmental Specialist of the Fayetteville Regional Office.
The purpose of the inspection was to evaluate compliance with the requirements of the Wastewater
General Permit NCG500000 series. You are commended for your initiative and proactive approach
regarding the preservation of the Waters of the State. I appreciate the time and professional courtesy
that you extended during the inspection.. The facility was found to be in compliance with permit
NCG500292.
The inspection report is attached with findings and observations made during the inspection. Please
review for more detail.
Thank you. for your continued cooperation. If you or your staff have any questions please do not
hesitate to contact me at, (910) 433-3322 [Johnathan.Watts@ncdenr.gov]
cc: (FRO_ Files (JW)
Sincerely,
Johnathan C. Watts
Environmental Specialist
Division of Water Resources
Water Quality Regional Operations Section
n
."'other
State of North Carolina I Environmental Quality
225 Green Street, Suite 714, Fayetteville, North Carolina 28301-5095
910-433-3300
United States Environmental Protection Agency
EPA Washington, D.C. 20460
.. Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-96
Section A: National Data System Coding (i.e., PCS)
Transaction Code' NPDES yr/mo/day Inspection
1 IN I 2 I,r I 3 I NCG500153 111 12 I 18/04/17 117
Type
18 I r_ I
IIi
Inspector Fac Type
19 I c I 2011
—�
21IIIIIII IIIIIIiiiliiIi IIII in n f1III
III
I•111I P6
Inspection Work Days Facility Self -Monitoring Evaluation 'Rating B1 QA
67I I 70II 71 Li72 1 ti 1
LJ
Reserved
73174 75I
1 1 1 I 1 I 1l8°
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number) -
Fayetteville Plant
6650 Ramsey St
Fayetteville NC 28311
Entry Time/Date
09:OOAM .18/04/17
Permit Effective Date
15/10/01
Exit Time/Date
11:30AM 18/04/17
Permit Expiration Date
20/07/31
Names) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Other Facility Data
Name, Address of Responsible Official/Title/Phone and Fax Number
Contacted
Louis Lapierre,6650 Ramsey St Fayetteville NC 28311/Plant Manager//
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Other
, Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(i) and Signature(s) of Inspector(s) Agency/Office/Phone and Fax Numbers Date .p
Johnathan C Watts FRO WQ//910-433-3300/ 4- oa't - 1 A
Signature of Management Q A Review r' Agency/Office/Phone and Fax Numbers Date
Trent Allen FRO WQ//910-433-3300/ f ,,h,
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page# 1
NPDES
NCG500153
I11 121
yr/mo/day
18/04/17
Inspection Type
17 18 L_l
(Cont.)
1
Section D: Summary of Finding/Comments. (Attach additionalsheets of narrative and checklists as necessary)
Two types of wastewater were present and covered by NCG500153, which included Boiler Blowdown
and Air Compressor Condensate. 001 and 002 outfalls were observed. Non Contact Cooling Water
and Stormwater Discharges flow through outfall 001. All Air compressor condensate commingles with
stormwater before discharging to outfall 002. Safety Kleen pumps and hauls oil portion after condesate
flows through seperator. Flow is measured with gauge as water flows through Parshall Flume and a
wastewaterflowdiagram was provided during the inspection.
Laboratory Records were reviewed for November -March 2017 and appeared to be in order. Microb ac
Laboratories performs the analyses for all the required NPDES parameters.
The permit was onsite and expires May 31,2018. The facility was instructed to continue with the
present permit until the new permit is sent.
Page# 2