HomeMy WebLinkAboutNCC220284_ESC Approval Submitted_20220114ROY COOPER
Governor
ELIZABETH S. BISER
Secretary
BRIAN WRENN
Director
Duke Energy Carolinas, LLC
ATTN: Ms. Jaclyn Whiteman
P.O. Box 1003
Charlotte, NC 28202
NORTH CAROLINA
Environmental Quality
December 30, 2021
LETTER OF APPROVAL
RE: Project Name: WOODFIN SOLAR FACILITY
Acres Approved: 19.6
Project ID: BUNCO-2022-005
County: Buncombe
City: Asheville
Address: 2700 Riverside Dr.
River Basin: French Broad
Stream Classification: French Broad River - Class B
Submitted By: Hammer Land Engineering - Mr. Mike Sousa, P.E.
Date Received by LQS: December 29, 2021
Plan Type: Express - Utility/Solar
Dear Ms. Whiteman,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this letter of Approval. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under
the NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the $100 annual permit fee.
After the fee is received, you will receive the COC via email. You MUST obtain the COC prior
to commencement of any land disturbing activity. The eNOI form may be accessed at
deq.nc.gov/NCGO1. Please direct questions about the eNOI form to Paul Clark at
Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
c:�D North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
...,,EQ> Asheville Reglonal Office 1 2040 U.S. Highway 70 I Swannanoa, North Carolina 28778
pp+mmnn��ma+�� �� 828.296.4500
Letter of Approval
Attn: Ms. Jaclyn Whiteman
Date: December 30, 2021
Page 2 of 3
Title 15A NCAC 48.0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If, following
the commencement of this project, it is determined that the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land -disturbing activity. This approval does not
supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. This permit allows for a land -
disturbance, as called for on the application plan, not to exceed the approved acres.
Exceeding the acreage will be a violation of this permit and would require a revised plan
and additional application fee. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you
notify this office of the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely, I
Fred Walker, P.E.
Express Engineer
Division of Energy, Mineral, and Land Resources
Letter of Approval
Attn: Ms. Jaclyn Whiteman
Date: December 30, 2021
Page 3 of 3
ec: Mr. Mike Sousa, P.E. (msousa@hammerengineering.com)
Ms. Shawna Riddle - NCDEQ LQS (shawna.riddle@ncdenr.goov)
Mr. Landon Davidson, P.G. - NCDEQ DWR (landon.davidson@ncdenr.gov)
Mr. Andrew Moore, P.G. - NCDEQ DWR (andrew.w.moore.,@ncdenr.gov)
cc: Regional Office file