HomeMy WebLinkAbout20130802 Ver 1_General Correspondence_20140205D w �.� 13 -ogaa FRAC -OUT REPORT Feature K -3 (UT to New Hope Creek) Frac -Out Report PSNC Durham Pipeline Project Orange County, North Carolina February 05, 2014 Name and company of person reporting frac -out: Ben Smith (Piedmont Utility Group, LLC Foreman) — Contractor for'PSNC. Cell phone,number is (704) 473 - 4125. Responsible party: Piedmont Utility Group, LLC from Shelby, NC. Owner — Ryan Ware Telephone (704) 473 -4840. Contractor performing HDD: Piedmont Utility Group, LLC Date and time of frac -out: Tuesday, February 412014 at 12:33 pm. How'was frac -out detected: Ben Smith (Piedinont-Utility, Group, LLC - Foreman) noticed drilling mud,at the'toe of slope and the�cul'vert extending,.undeineath Mt: Sinai Road was completely inundated. Location of the frac -out: Feature K =3, UT to New Hope Creek at Station 293+00. See attached map. Type of material: Bentonite clay and water slurry — standard HDD drilling mud. Description of frac -out and efforts to protect sensitive areas: The drilling operation was stopped immediately upon noticing the4rilling mud at the toe of slope. The source ofthe drilling mud release turned out to be'through a seam in the concrete reinforced culvert that extends,underneath Mt. ,Sinai. Tom Perez (S &ME Environmental Inspector) was contacted immediately, and secondary containment,measures as shown,in the attached pictures were installed to limit the migration of drilling,mud downstream and to prevent any more from entering the stream. A back -hoe was used to dig a containment pit as shown in Picture 1, and a pump was then installed in the containment pit in order to recapture and recirculate'the drilling'mud- back`into the operation. Walter Cole (S &ME Project Manager) reported incident to Chem Smith of the North Carolina Department of Water Resources at 2:00 pm on Tuesday, February 4, 2014. Walter Cole and Tom Perez performed an inspection together on February 5, 2014, assessing the containment measures and documenting conditions. Estimated size of frac =out (quantity and area): A fine layer of drilling,mud impacted the stream for approximately 150 feet. The containment pit measured approximately 4 feet X 4 feet X 4 feet. Due to the quick action of the contractor and S &ME, INC. /3201 Spring Forest Road / Raleigh, NC 27616 by 919.872.2660 IF 919.876.3958 / www.smeinc.com Wing mud "entered the, stream and due , to,the environmentali very nspedtpr, velittle Ari secondary containment measures,-there was ,no visible flow entering New Hope: Creek, froffiXeattireK.J afth6 lime of M�- spectibif. Proposed additional HDD activities: Thvdosigpedleligth of the HDD is approximately I'000 feetand,thdiniflaID110t hole,,'•wasfcojppldte. -TlfeTracrout,occurrqd duringIthd 115'mch,reaming,opprafion. There•wilf be Imorexeams,after,the B ihch,ream is completed ompleted before pipe, pull back-,, and WArilLbb3, to 4 weeksbef6re,,the entire HDD. is complete, Proposed final, cleanup method: Omconlpletion,df 'HD.P activities, Pie&fibnt 'Utility"Group,, LLO will remove,any,drilling, mud, aq& turbid water withi , n, pri mary, and secondary containment areas,. ,The mfid°intCyfeqi&e,remoVAl'by hand or vacuum truck. Upon,completioA,bf cl0an-up, activities,,sazid'bagsjh-ay bakes, gift, fende, sections, and' other 'Contadmnent,materials,will,,al'so'be=rernoved. Party-'respons! b lie for'clean up: PiedmofttjUtilityGroupj1tLt, General comments: IvAppearg that the drilling,mdhas beewconthindd within the containment. it and 'the entire volume of mud coming from culvertis, being recycled back into theArillffig operation. The,,contractor stopped dtilling-operation, acted, in good faith - - .to� contain the drilling hatid, and immediately notified enviid nmentaIftfonifeits,. "The, 'contractor and' inspectors, should remain alert for rain ,events and should take actions •necessary, to contain ,drill,.miid/tiiibidwater 4n ;impadted,area. Efforts focldaii up -the :impacted should start as,soon asprapticalfolloi0hg bore completion.' -Attachment: Fra:d.707ut,Rep6rt�SitdPh6tbgi,-aphg I-S. Frac-oat.Locdti6n Map., W-7 4V., AT. TV . . . . e.- 7 . . . . . . . 41;t W-7 4V., :11101mel 111 W94 0 =r'l : 0 1 J:AA =1:101: OP M 9711M Um- 1W A IR AT. . . . . e.- 7 . . . . . . . :11101mel 111 W94 0 =r'l : 0 1 J:AA =1:101: OP M 9711M Um- 1W A IR V 1;. At j it � 4�1- ce.c 6i tro, �KA o,7 • 4 a 11c �a 5-,