Loading...
HomeMy WebLinkAboutSW4211201_Supplement-EZ Form_20220113SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name 2 Project Area ac 3 Coastal Wetland Area ac The Grove Subdivision Road 67.15 0 0 4 Surface Water Area ac 5 Is this Droiect High or Low Density? Low 6 Does this protect use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of ve etated setbacks provided feet N/A 8 Will the vegetated setback remain vegetated? N/A 9 If BUA is proposed in the setback, does it meet NCAC 02H.1003 4 c-d ? N/A 10 1 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting RWH 18 Green Roof 19 Level Spreader -Filter Strip LS-FS 20 Disconnected Impervious Surface DIS 21 Treatment Swale 0 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Ba filter IFilterra 26 FORMS LOADED NER CERTIFICATION Name and Title: Organization: Street address: City, State, Zip: Phone number(s): Email: John F. Oglesby, PE CSD Engineering 115 E. Third Street Wendell, NC 27591 (919) 624-0997 Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Seal Signature of Designer Date DRAINAGE AREAS 1 Is this a high density project? No 2 If so, number of drainage areas/SCMs 0 3 Does this oroiect have low densit areas? Yes 4 If so number of low 4-ify drainage areas 1 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site LD 1 4 Type of SCM 5 Total drainage area (sq ft 67.15 6 Onsite drainage area (sq ft 67.15 7 Offsite drainage area (sq ft 8 Total BUA in project (sq ft 72000 sf 9permitting) New BUA on subdivided lots (subject to s ft 48000 sf 10 New BUA not on subdivided lots (subject to permitting) (sf) 24000 sf 11 Offsite BUA (sq ft 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft 1000 sf - Sidewalk (sq ft - Roof (sq ft 4000 sf - Roadway s ft - Future (sq ft 3000 sf - Other, please specify in the comment box below (sq ft 13 New infiltrating permeable pavement on subdivided lots (sq ft 14 New infiltrating permeable pavement not on subdivided lots (sq ft 15permitting) Existing BUA that will remain (not subject to s ft 16 lExistina BUA that is already permitted (sq ft 17 Existing BUA that will be removed (sq ft 18 Percent BUA 3% 19 Design storm inches 20 Design volume of SCM cu ft 21 Calculation method for design volume ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): There are no SCM's proposed; roadside channels will convey stormwater and provide some treatment; rock check dams will likely be installed to control velocity; future BUA is for potential horse stables, out buildings, etc. LOW DENSITY DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 021-1.1003 1 Is project below density thresholds set forth in the applicable stormwater rule? Yes 2 Does project maximize dispersed flow and minimize channelization of flow? Yes 3 Has the use of piping been minimized per .1003(2)(c)? Yes 4 Side slopes of the vegetated conveyances (H:V) sf 5 Maximum velocity in the vegetated conveyances during the 10-year storm? 2 6 Are curb outlet swales proposed? No 7 Maximum longitudinal slope of curb outlet swale(s) (% ) 8 Bottom width of curb outlet swale(s) (feet) 9 Maximum side slope of curb outlet swale(s) (H:V) 10 Minimum length of curb outlet swale(s) (feet) 11 Are treatment swales used instead of curb outlet swales? 12 Is stormwater released at the edge of the setback as dispersed flow? N/A 13 Have stormwater outlets been designed to prevent downslope erosion? Yes 14 Are variations to rule .1003 proposed? No ADDITIONAL INFORMATION 15 JPlease use this space to provide any additional information about this low density project: Roadside channels are not intended to meet MDC for grassed swales; however, some treatment expected. Channel analysis was done by estimating discharge with Rational formula with same paramters for all anlysis; C=0.6, I10=6.83 in/hr (5-min TOC) times the drainage areas. Roughness for Class D vegetation was computed in channel analysis worksheet based on FH WA HEC No. 15 "Design of Roadside Channels with Flexible Lining"