HomeMy WebLinkAbout20210021 Ver 2_DWR Comment Summary_CoorII_20220113Summary of Comments on Draft BPDP
Coorll_DWRedits.pdf
Page: 2
Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 1:08:48 PM
DWR ID# is 2021-0021v2
Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 1:10:43 PM
Based on the information provided in 3.0, add a credit release schedule to the BPDPjust for this bank where Task 1 includes the assignment to
a long term steward up front.
Number: 2 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 1:11:01 PM
who has the Provider chosen for the steward?
Number: 3 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 12:46:56 PM
DWR recommends the Provider commit to performing soil testing to determine how best to prepare the soil for planting and success. Will soil
testing be performed? Why or Why not.
Number:4 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 12:47:25 PM
DWR recommends the Provider prep the soil for planting using methods such as ripping when possible.
Page: 10
QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 12:49:52 PM
diffused flow will not be required for ditches B & C unless there is a roadside ditch feeding into these ditches which i cannot see. Adjust credits,
text, figures etc accordingly.
Number: 2 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 12:48:31 PM
Commit to ensuring that stem species will be well mixed before planting to promote site wide diversity of planted species
r Number: 3 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 12:51:17 PM
what is the anticipated spacing of planted stems?
Page: 11
QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 12:58:12 PM
add language consistent with the UMBI where it indicates the provider has to notify DWR of within 30 days of site completion. This will be
required for Task 2.
Page: 12
QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 1:03:08 PM
It is recommended that you create a section 6.3 titled "Easement Boundary". Clarify that easement boundaries will include placards identifying
the contact information for the easement holder. Tell me what the Provider intends to do to mark the boundary. Clarify that the boundaries will
be marked prior to the Task 2 site visit by DWR.
Page: 15
r Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 1:04:15 PM
change Buffer Mitigation Service Area to Nutrient Offset Service Area
Page: 20
.Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 1:07:39 PM
if there is no road side ditch feeing into B and/or C, then remove diffused flow deductions from B and C. The CE is includes basically all of the
ditch, and since there is very little ditch above the CE boundary, I won't require diffused flow deductions here.
r—Number: 2 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 1:05:40 PM
Add "Riparian" Restoration
Page: 21
QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 1:07:56 PM
add "riparian" restoration
Page: 22
4Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/13/2022 1:17:42 PM
Include more recent photos