HomeMy WebLinkAboutNCC202783_NOT Closeout Documents_20220111North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336)
776-9800
County: Surry Project: Hayes Solar, LLC
Person financially responsible: NARENCO Development, LLC - Andrew A
Giraldo
Address: 227 Southside Dr., Suite B, Charlotte, NC 28217,
1. Project Location: W Atkins St, Dobson
Pictures: Yes - Digital
2. Weather and soil conditions: Sunny, Workable Soils
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes
5. Violations:
River basin: Yadkin-PeeDee
Project #: SURRY-2020-019
Initial inspection: No
If no, check violations below:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: January 07, 2022
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities (NCGO 1) must be requested by the permittee via a Notice of
Termination (NOT). The NOT is available at:
https:Hedoes.deq.ne.gov/Fonns/NCGOI-Termination. Please note that this correspondence
must be uploaded as part of completing the NOT process.
Ensure that any remaining temporary erosion and sediment control devices such as perimeter
silt fencing and outlet protection devices are removed from the site.
Reported by: Tyler Pearson Others present:
Date of inspection: January 06, 2021 Time arriving on site: 1:00 PM Time leaving site: 1:45 PM
cc:
Yes