HomeMy WebLinkAboutNCC205624_NOT Closeout Documents_20220111C� Greenville
'q' NORT}-1 CAROLiNA
ENGINEERING
Engineering Department-Sedimentation/Erosion Control Program
January 10, 2022
Letter of Final Insneetion
Pitt County ABC Board
Memorial Drive ABC Store
2307 S. Memorial Drive
Greenville, NC 27834
Re: Project Name: Pitt County ABC Board
Project Number: ESCP-2020-0050
County: Pitt
Disturbed Acreage: 1.08
Responsible Party: Pitt County ABC Board
Dear Mr. Sullivan,
This office has completed its final site inspection of the referenced project. We find the site
stable and in compliance with the approved Sedimentation and Erosion Control Plan.
Upon issuance of this letter, the referenced Sedimentation and Erosion Control Plan has been
closed for this project and you will need to terminate your NCGO1 permit.
Please do not hesitate to call if you have any questions.
Respectfully,
Victor C. Long
Engineering Assistant Ili
Engineering Department
City of Greenville, NC
vlonR@ereenvillenc.sov
www.greenvillencgov
252-329-4888
City of Greenville
Engineering Department
Land Development Division
252-329-4467
SOIL EROSION AND SEDIMENTATION CONTROL INSPECTION REPORT
Report No.
21.01.1001
Date Inspected:
7/30/21
Project Name:
ABC Store Memorial Drive
Location:
2307 S Memorial Dr
Weather Conditions:
Sunny
Soil Conditions:
Dr
Contact For Erosion Issues:
B an Fa undus
Contractor:
WIMCO
Financially Responsible Part : I
Pitt County ABC Board
PROJECT AND SITE CONDITIONS
Yes
Is Site In Compliance with the Ordinance
Yes
Are Erosion Control Measures Properly Maintained
No
Is Site Currently Under Notice of Violation
No
Has Off Site Sedimentation Occurred
Yes
Have Previous Violations Been Corrected
No
I Were Pictures Taken
TYPE OF VIOLATION
❑
No Approved Plan, City Code 9-8-5(a)
❑
Inadequate Buffer Zone, City Code 9-8-7 1 a
❑
Failure to Follow Approved Plan, City Code 9-8-170)
❑
Graded slopes and fills too steep, City Code 9-8-7(2)
❑
Revised Plan Required, City Code 9-8-20 b (9)
❑
Unprotected exposed slopes, City Code 9-8-7(2)
❑
Failure to Provide Adequate Ground Cover, City Code 9-8-
7 2 , 3
El8-
Failure to maintain erosion control measures, City Code 9-13
❑
Insufficient measures to retain sediment on site, City Code
9-8-24 b
Other: (describe)
Click here to enter text.
❑
Failure to take all reasonable measures, City Code 9-8-5(b)
DESCRIPTION OF SITE CONDITIONS:
Site is stable and has been completed according to plan specifications. Eligible for Notice of Termination.
PREVENTATIVE ACTIONS TO CONSIDER:
CORRECTIVE ACTIONS REQUIRED:
DEADLINE FOR COMPLETION OF CORRECTIVE ACTIONS: NIA
Copies to:
❑ On Site Supervisor (Signature)
® Contractor
® Financially Responsible Party
® Engineer
Report By: Tyler Averett PH: 252-329-4828 Date: 1/10/2022