Loading...
HomeMy WebLinkAbout20220066 Ver 1_401 Application_20220112Staff Review Does this application have all the attachments needed to accept it into the review process?* Yes No ID# * 20220066 Version* 1 Is this project a public transportation project?* Yes • No Reviewer List: * Sue Homewood:eads\slhomewood Select Reviewing Office: * Wilmington Regional Office - (910) 796-7215 Submittal Type:* 401 Application Does this project require a request for payment to be sent?* Yes No How much is owed?* $240.00 $570.00 Project Submittal Form Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Project Type: * For the Record Only (Courtesy Copy) New Project Modification/New Project with Existing ID More Information Response Other Agency Comments Pre -Application Submittal Re-Issuance\Renewal Request Stream or Buffer Appeal Project Contact Information Name: Heather LaGamba Who is submitting the information? Email Address: hlagamba@pilotenviro.com Project Information Project Name: Raven Ridge Subdivision Is this a public transportation project? Yes No Is the project located within a NC DCM Area of Environmental Concern (AEC)? Yes No Unknown County (ies) Davidson Please upload all files that need to be submited. Click the upload button or drag and drop files here to attach document Pilot Project 7220_Raven Ridge 9.55MB Subdivision_PCN_1.12.2022.pdf Only pdf or kmz files are accepted. Describe the attachments or comments: PCN for 401 WQC Sign and Submit By checking the box and signing box below, I certify that: • I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief. • I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the online form. Signature: Submittal Date: Is filled in automatically. Preliminary ORM Data Entry Fields for New Actions ACTION ID 9: SAW- 2021-02152 Prepare file folder ❑ 1. Project Name [PCN Form A2a]: Arnold Rd Begin Date (Date Received): 1.12.2022 Assign Action ID Number in ORM ❑ 2. Work Type: ❑✓ Private ❑Institutional ❑Government ❑ Commercial 3. Project Description / Purpose [PCN Form B3d and B3e]: The site contains wooded land and fields. The site is proposed for residential development. 4. Property Owner / Applicant [PCN Form A3 or A4]: Piedmont Triad Land Developers, LLC 5. Agent / Consultant [PNC Form A5 — or ORM Consultant ID Number]: Michael Brame/Pilot Environmental, Inc. 6. Related Action ID Number(s) [PCN Form B5b]: 7. Project Location —Coordinates, Street Address, and/or Location Description [PCN Form Blb]: Arnold Road 35.861761 °/-80.261464° 8. Project Location —Tax Parcel ID [PCN Form Bla]: 6727-04-50-9353 & 6727-04-62-2050 (portion of) 9. Project Location — County [PCN Form A2b]: Davidson 10. Project Location — Nearest Municipality or Town [PCN Form A2c]: Lexington 11. Project Information —Nearest Waterbody [PCN Form 132a]: Swearing Creek 12. Watershed / 8-Digit Hydrologic Unit Code [PCN Form 132c]: Swearing Creek/03040103 Authorization: Section 10 ❑ Section 404 ✓❑ Regulatory Action Type: ❑ Standard Permit ✓ Nationwide Permit 9 Regional General Permit 9 Jurisdictional Determination Request Section 10 and 404 ❑ ❑ Pre -Application Request ::]Unauthorized Activity ❑ Compliance ❑ No Permit Required Revised 20150602 Environmental Services Proposal Pilot Proposal 7220 September 3, 2021 AGENT AUTHORIZATION This form authorizes Pilot to act as our agent in stream/wetland matters including U.S. Army Corps of Engineers and North Carolina Division of Water Resources field verification and permitting. Property Address: v "/Ac"" A.s' LGxMxi 7'a�-' /`L-- Z724f — Owner Information: A,2 di-fae; ,,�,a L.�, �� Dc•h;�aA��,S, LG� Address: n /i0d,r3-A?j`r' Telephone Number: 336 '770 -.j'as Fax Number: A E-mail Address: G� r �6�rm,`l• car — JURISDICTIONAL DETERMINATION REQUEST D. PROPERTY ACCESS CERTIFICATION By signing below, I authorize representatives of the Wilmington District, U.S. Army Corps of Engineers (Corps) to enter upon the property herein described for the purpose of conducting on - site investigations, if necessary, and issuing a jurisdictional determination pursuant to Section 404 of the Clean Water Act and/or Section 10 of the Rivers and Harbors Act of 1899. I, the undersigned, am either a duly authorized owner of record of the property identified herein, or acting as the duly authorized agent of the owner of record of the property. X)4wo Print Name Capacity: �_­6wner —Authorized Agent Date Signature M avidson County GIS nJ f L J ")�I.,"11�1 & ING 7 Parcel Number: 1132700000003A Land Units: 49.84 AC Pin Id : 6727-04-50-9353 Deed Book: 2411 Pg: 1398 PIEDMONT TRIAD LAND DEV LLC Owner : PO BOX 819 Deed Date: 06/05/2020 SOUTHMONT NC 27351 Property Address: FORREST DR Account Number: 9242088 Township: 11 Exempt Code: Building Value: $0 Other Building Value: $0 Land Value: $231,260 Market Value: $231,260 Assessed Value: $231,260 Deferred Value: $0 Legal Description : L3A BK2411-1398 Additional Attributes ire Service Districts q.Miles ame ownships q. Miles fame my Zoning Districts oil Types ISL Name oil Name Sl Municipal Boundary No Features Found 1 inch = 640 feet 0 11.6 WEST LEXINGTON FD 56.57 LEXINGTON The information contained on this map does not replace information that may be obtained by consulting the official source of the information. In no event shall Davidson County, NC or the consultants of Davidson County, NC be liable for any damages, direct or consequential, from the use of the information contained on this map. avidson County GIS F- 7 LA Parcel Number: 1132100000005 Land Units: 28.03 AC Pin Id : 6727-04-62-2050 Deed Book: 2413 Pg: 1105 PIEDMONT TRIAD LAND DEV LLC Owner : PO BOX 819 Deed Date: 06/17/2020 SOUTHMONT NC 27351 Property Address: ARNOLD RD Account Number: 9242088 Township: 11 Exempt Code: Building Value: $0 Other Building Value: $0 Land Value: $195,090 Market Value: $195,090 Assessed Value: $195,090 Deferred Value: $0 Legal Description: PB76-18 L5 ARNOLD RD BK2413-1105 Additional Attributes ire Service Districts lq.Miles lame ownships lq. Miles lame :ounty Zoning Districts oil Types ISL Name oil Name Sl Municipal Boundary No Features Found 1 inch = 320 feet 0 11.6 WEST LEXINGTON FD 56.57 LEXINGTON The information contained on this map does not replace information that may be obtained by consulting the official source of the information. In no event shall Davidson County, NC or the consultants of Davidson County, NC be liable for any damages, direct or consequential, from the use of the information contained on this map. nA� NORTH CAROLINA Environmental Quality Water Resources Office Use Only Corps Action ID no. SAW-2021-02152 Date received: 1/12/2022 DWR project no. Click enter.] Date received: 1/12/2022 Site Coordinates: Latitude (DD.DDDDDD): 35.861293' Longitude (DD.DDDDDD): 80.261524' Form Version 1.5, September 2020 Pre -Construction Notification (PCN) Form (Ver. 1.5, September 2020) For Nationwide Permits and Regional General Permits and corresponding Water Quality Certifications Please note: fields marked with a red asterisk are required. The form is not considered complete until all mandatory questions are answered. The online help file may be found at this link: https:Hedocs.deg.nc.gov/WaterResources/0/edocl6247041PCN%2OHelp%2OFile%202018-1-30.pdf The help document may be found at this link: http://www.saw. usace.army. mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/Pre- construction-Notification/ Before submitting this form, please ensure you have submitted the Pre -Filing Meeting Request Form as DWR will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used to satisfy 40 C.F.R. Section 121.4(a) which states "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency." In accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5), all certification requests must include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Attach documentation of Pre -Filing Meeting Request to this Application. Date of Pre -filing Meeting Request (MM/DD/YYYY) : 9/29/2021 DWR ID # Click to enter. Version 1 (If applicable) A. Processing Information County (counties) where project is located: Davidson Additional (if needed). Is this a public transportation project? (Publicly funded municipal, state, or federal road, rail, ❑ Yes ❑x No or airport project) Is this a NCDOT project? ❑ Yes ❑x No If yes, NCDOT TIP or state project number: Click to enter. If yes, NCDOT WBS number: Click to enter. ❑x Section 404 Permit (wetlands, streams, waters, Clean Water Act) la. Type(s) of approval sought from the Corps: ❑ Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) Pagel of 21 PCN Form - Version 1.5, September 2020 ❑x Nationwide Permit (NWP) 1 b. Permit type(s)? ❑ Regional General Permit (RGP) ❑ Standard (IP) This form may be used to initiate the standard/ individual permit process with the USACE. Please contact your Corps representative concerning submittals for standard permits. All required items can be included as separate attachments and submitted with this form. 1 c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑x No NWP number(s): NWP 14 & 18 RGP number(s): Click to enter. 1 d. Type(s) of approval sought from the DWR (check all that apply): ❑x 401 Water Quality Certification — Regular ❑ 401 Water Quality Certification— Express ❑ Non-404 Jurisdictional General Permit ❑ Riparian Buffer Authorization ❑ Individual 401 Water Quality Certification 1e. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: * ❑ Yes ❑x No For the record only for Corps Permit: * ❑ Yes ❑x No 1f. Is this an after -the -fact permit/certification application? ❑ Yes ❑x No 1 g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? ❑ Yes ❑x No If yes, attach the acceptance letter from mitigation bank or in -lieu fee program. 1 h. Is the project located in any of NC's twenty coastal counties? ❑ Yes ❑x No 1 i. Is the project located within an NC DCM Area of Environmental Concern (AEC)? ❑ Yes ❑x No ❑ Unknown 1j. Is the project located in a designated trout watershed? ❑ Yes ❑x No If yes, you must attach a copy of the approval letter from the appropriate Wildlife Resource Commission Office. Trout information may be found at this link: http://www.saw.usace.army.mil/Missions/Regulatory-Permit- Program/Agency-Coordination/Trout.aspx Page 2 of 21 PCN Form - Version 1.5, September 2020 B. Applicant Information 1 a. Who is the primary contact? Brad Coe 1 b. Primary Contact Email: coefor@gmail.com 1 c. Primary Contact Phone: (###)###-#### (336) 970-7935 1 d. Who is applying for the permit/certification? (check all that apply) ® Owner ❑ Applicant (other than owner) 1 e. Is there an agent/consultant for this project? ® Yes ❑ No 2. Landowner Information 2a. Name(s) on Recorded Deed: Piedmont Triad Land Dev, LLC 2b. Deed Book and Page No.: 2411/1398 2c. Responsible Party (for corporations): Brad Coe 2d. Address Street Address: PO Box 819 Address line 2: slick to 'M ILIM . City: Southmont State/ Province/ Region: North Carolina Postal/ Zip Code: 27351 Country: U.S. 2e. Telephone Number: * (###)###-#### (336) 970-7935 2f. Fax Number: (###)###-#### Click to eniei. 2g. Email Address: * coefor@gmail.com 3. Applicant Information (if different from owner) 3a. Name: Click to enter. 3b. Business Name (if applicable): Click to enter. 3c. Address: Street Address: Click to enter. Address line 2: Click to enter. City: Click to enter. State/ Province/ Region: Click to enter. Postal/ Zip Code: Click to enter. Country Click to enter. 3d. Telephone Number: * (###)###-#### Click to enter. 3e Fax Number: (###)###-#### Click to enter. Page 3 of 21 PCN Form - Version 1.5, September 2020 3f. Email Address: Click to enter. 4. Agent/ Consultant (if applicable) 4a. Name: * Michael T. Brame 4b. Business Name: Pilot Environmental, Inc. 4c. Address: * Street Address: 743 Park Lawn Court Address line 2: Click to enter. City: Kernersville State/ Province/ Region: NC Postal/ Zip Code: 27284 Country: U.S. 4d. Telephone Number: (###)###-#### (336) 708-4620 4e Fax Number: (###)###-#### Click to enter. 4f. Email Address: * mbrame@pilotenviro.com Agent Authorization Letter: Attach a completed/signed agent authorization form or letter. A sample form may be found at this link: https://www.saw. usace.army. mil/Missions/Regulatory-Permit-Program/Permits/2017-Nationwide-Permits/Pre- construction-Notification/ Page 4 of 21 PCN Form - Version 1.5, September 2020 C. Project Information and Prior Project History 1. Project Information 1 a. Name of project: Raven Ridge Subdvision 1 b. Subdivision name (if appropriate): Raven Ridge 1 c. Nearest municipality/town: * Lexington, NC 2. Project Identification 2a. Property identification number (tax PIN or parcel ID): 6727-04-62-2050 & 6727-04-50-9353 2b. Property size (in acres): 57 2c. Project Address: Street Address: Arnold Street Address line 2: Click to enter. City: Lexington State/ Province/ Region: NC Postal/ Zip Code: 27295 Country: U.S. 2d. Site coordinates in decimal degrees (using 4-6 digits after the decimal point): * Latitude (DD.DDDDDD): 35.861293' Longitude (-DD.DDDDDD):-80.261524' 3. Surface Waters 3a. Name of nearest body of water to proposed project: Swearing Creek 3b. Water Resources Classification of nearest receiving Class C water: The Surface Water Classification map may be found at this link: https://ncdenr.maps.arcqis.com/apps/webappviewer/index.html?id=6e125ad7628f494694e259c80dd64265 Yadkin-PeeDee 3c. In what river basin(s) is your project located? Choose additional (if needed) 3d. Please provide the 12-digit HUC in which the project is 030401030104 located: The Find Your HUC map may be found at this link: https://ncdenr.maps.arcgis.com/apps/Publiclnformation/index.html?appid=ad3a85aOc6d644aOb97cdO69db238ac3 Page 5 of 21 PCN Form - Version 1.5, September 2020 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The site contains wooded land and fields. A utility easement crosses the northern portion of the site. The majority of the wooded land has been cleared and low-lying dense vegetation with intermingled saplings have reestablished. The fields are vegetated with fescue and weed species. The site is located in a residential area of Lexington. 4b. Have Corps permits or DWR certifications been obtained for this ❑ Yes ❑X No ❑ Unknown project (including all prior phases) in the past? 4c. If yes, please give the DWR Certification number and/or Corps SAW-2021-02152 Action ID (ex. SAW-0000-00000): jClick to enter.] Attach any pertinent project history documentation 4d. Attach an 8'h x 11" excerpt from the most recent version of the USGS topographic map indicating the location of the project site. 4e. Attach an 8'h x 11" excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. 4f. List the total estimated acreage of all existing wetlands on the 2.05 acres property: 4g. List the total estimated linear feet of all existing streams (intermittent 2,290 linear feet and perennial) on the property: 4g1. List the total estimated acreage of all existing open waters on the 0 acres property: 4h. Explain the purpose of the proposed project: The purpose of the proposed project is to construct a 72 lot single family residential subdivision. 4i. Describe the overall project in detail, including the type of equipment to be used: The overall project includes the construction of a 72 lot single family residential subdivision. In order to facilitate the proposed development and access the site, it is necessary to cross a stream and fill a portion of a wetland. To facilitate the development of the site, clearing and grading the site is necessary. Graders, haulers, excavators and other heavy equipment will be used during grading and construction of the site. 4j. Attach project drawings/site diagrams/depictions of impact areas for the proposed project. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or in ® Yes ❑ No ❑ Unknown proposed impact areas? Comments: The site was delineated by Pilot Environmental on September 24, 2020. The site was verified by Ms. Jean Gibby via desktop review and a PJD was issued on 10.5.2021 (SAW 2021-02152). Name (if known): David Brame/Michael Brame 5b. If 5a is yes, who delineated the jurisdictional Agency/Consultant Company: Pilot Environmental areas? Other: lick to entei 5c. If the Corps made a jurisdictional determination, ❑X Preliminary ❑ Approved ❑ Emailed Concurrence what type of determination was made? ❑ Not Verified ❑ Unknown Corps AID number (ex. SAW-0000-00000): SAW — 2021-02152 Page 6 of 21 PCN Form - Version 1.5, September 2020 5d. List the dates of the Corps jurisdictional determination or State determination if a determination was made by either agency. USACE issued a PJD on 10.5.2021. 5d1. Attach jurisdictional determinations. Page 7 of 21 PCN Form - Version 1.5, September 2020 6. Future Project Plans 6a. Is this a phased project? ® Yes ❑ No 6b. If yes, explain. This is Phase II of a two phased project. Phase I was constructed without impacts to streams or wetlands. Are any other NWP(s), regional general permit(s), or individual permit(s) used, or intended to be used, to authorize any part of the proposed project or related activity? This includes other separate and distant crossings for linear projects that require Department of the Army authorization but don't require pre -construction notification. No other permits are intended to be used. Page 8 of 21 PCN Form - Version 1.5, September 2020 D. Proposed Impacts Inventory Impacts Summary 0 Wetlands 1 a. Where are the impacts associated with your project ❑ Buffers (check all that apply): ❑ Pond Construction 0 Streams - tributaries ❑ Open Waters 2. Wetland Impacts If there are wetland impacts proposed on the site, complete this table for each wetland area impacted. 2a. 2a1. 2b. 2c. 2d. 2e. 2f. 2g. Site # Impact Impact Wetland Name Wetland Type Forested Jurisdiction Impact Area Reason/Type Duration ? Type* (ac) W1 Fill (Incl. Permanent Unnamed (WB 1-15) Bottomland Yes Both 0.099 Riprap) Hardwood Forest W2 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter W3 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter W4 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter W5 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter W6 Choose one Temp/ Click to enter Choose one Y/N Choose one Click to Perm enter 2g1. Total temporary wetland impacts Click to enter. ac 2g2. Total permanent wetland impacts 0.099 ac 2g3. Total wetland impacts 0.099 ac 2h. Comments: In order to develop lots 22 and 23, it is necessary to fill 0.099 acres of wetland. Page 9 of 21 PCN Form - Version 1.5, September 2020 3. Stream Impacts If there are perennial or intermittent stream/ tributary impacts (including temporary impacts) proposed on the site, complete this table for all stream/ tributary sites impacted. ** All Perennial or Intermittent streams must be verified by DWR or delegated local government Site # 3a. Impact Reason/ Type 3b. Impact Duration 3d. Stream Name 3e. Stream Type 3f. Jurisdiction Type 3g. Stream Width (avg ft) 3h. Impact length (linear ft) S1 Crossing/ Culvert Permanent Unnamed Perennial Both 6.22 126/80/20 S2 ;hoose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S3 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S4 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S5 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S6 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S7 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S8 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S9 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S10 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S11 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S12 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S13 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S14 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter S15 Choose one Temp/ Perm Click to enter Per/Int Choose one Click to enter Click to enter 3i1. Total jurisdictional ditch impact: Click to enter. linear ft 3i2. Total permanent stream impacts: 206 linear ft 36. Total temporary stream impacts: 20 linear ft 3i4. Total stream and ditch impacts: 226 linear ft 3j. Comments: 126 linear feet (784.08 square feet or 0.018 acres) of stream channel will be permanently impacted with a culvert and associated fill. 80 linear feet (497.60 square feet or 0.0114 acres) of stream channel will be permanently impacted with rip rap that is to be keyed in. 20 linear feet (124.40 square feet or 0.0029 acres) of stream channel will be temporarily impacted by a coffer dam and associated pump around. The total permanent stream impacts (excluding keyed -in rip rap) is to 126 linear feet (0.018 acres) of stream impact. It is below the mitigation threshold. Therefore, mitigation should not be required and is not proposed. Page 10 of 21 PCN Form - Version 1.5, September 2020 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S., individually list all open water impacts in the table below. 4a. 4b. 4c. 4d. 4e. 4e1. 4f. Site # Impact Reason/ Impact Waterbody Name Waterbody Jurisdiction Impact area (ac)' Type Duration Type* Type 01 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 02 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 03 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 04 Choose one Temp/ Click to enter. Choose one Choose one Click to enter. Perm 4g. Total temporary open water impacts Click to enter. ac 4g. Total permanent open water impacts Click to enter. ac 4g. Total open water impacts Click to enter. ac 4h. Comments: Open water impacts are not proposed. 5. Pond or Lake Construction If pond or lake construction is proposed, complete the table below. (*This does NOT include ofFline stormwater management ponds.) 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or Wetland Impacts (ac) Stream Impacts (ft) Upland # purpose of pond Impacts (ac) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one Click to Click tL Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. P2 Choose one Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5f. Total Click to Click to Click to Click to Click to Click to Click to enter. enter. enter. enter. enter. enter. enter. 5g. Comments: Pond or lake construction is not proposed. 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no.: Click to enter. 5i. Expected pond surface area (acres): Click to enter. 5j. Size of pond watershed (acres): Click to enter. 5k. Method of construction: Click to enter. Page 11 of 21 PCN Form - Version 1.5, September 2020 6. Buffer Impacts (DWR requirement) If project will impact a protected riparian buffer, then complete the chart below. Individually list all buffer impacts. 6a. Project is in which protected basin(s)? (Check all that apply.) ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Jordan ❑ Goose Creek ❑ Randleman ❑ Other: Click to enter. Site #* 6b. Impact Type* 6c. Impact Duration* 6d. Stream Name* 6e. Buffer Mitigation Required?* 6f. Zone 1 Impact* (sq ft) 6g. Zone 2 Impact* (sq ft) B1 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B2 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B3 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B4 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B5 Choose one Temp/ Perm Click to enter. Y/N Click to enter. Click to enter. B6 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B7 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B8 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B9 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. B10 Choose one Temp/ Perm Click to enter. Y/N Click to enter Click to enter. 6h. Total temporary impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6h. Total permanent impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6h. Total combined buffer impacts: Zone 1: Click to enter. sq ft Zone 2: Click to enter. sq ft 6i. Comments: Please attach supporting documentation (impact maps, plan sheets, etc.) for the proposed project. Page 12 of 21 PCN Form - Version 1.5, September 2020 E. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts through project design: The applicant has designed the proposed development to avoid impacts to other streams and wetlands. A headwall and endwall are designed to minimize impacts to the stream. Rip rap is being keyed in to the existing bed to maintain the current stream bed. The slopes associated with lots 22 and 23 have been designed at a 2:1 to avoid additional wetland impacts. The remaining roads, lots and utilities have been designed to avoid additional impacts to jurisdictional areas. 1 b. Specifically describe measures taken to avoid or minimize proposed impacts through construction techniques: The clearing limits will be surveyed, staked and silt fencing and clearing limit fencing will be used. Coffer dams will be used to minimize sediment discharge during construction activities. Disturbed areas will be seeded and mulched to limit sediment from entering downgradient waters. Slope matting will be used on steep slopes. 2. Compensatory Mitigation for Impacts to Waters of the U.S., Waters of the State, or Riparian Buffers 2a. If compensatory mitigation is required, by whom is it required? ❑ DWR ❑ Corps (check all that apply) 2b. If yes, which mitigation option(s) will be used for this ❑ Mitigation Bank project? (check all that apply) ❑ In Lieu Fee Program ❑ Permittee Responsible Mitigation 3. Complete if using a Mitigation Bank (Must satisfy NC General Statute143-214.11 (d1).) 3a. Name of mitigation bank: Click to enter. 3b. Credits purchased/requested: Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Type: Choose one Quantity Click to enter. Attach receipt and/or approval letter. 3c. Comments: Click to enter. 4. Complete if Using an In Lieu Fee Program 4a. Attach approval letter from in lieu fee program. 4b. Stream mitigation requested: Click to enter. linear feet 4c. If using stream mitigation, what is the stream temperature: Choose one NC Stream Temperature Classification Maps can be found under the Mitigation Concepts tab on the Wilmington District's RIBITS website: (Please use the filter and select Wilmington district) https://ribits.usace.army.mil/ribits apex/f?p=107:27:2734709611497::NO: RP: P27 BUTTON KEY:O 4d. Buffer mitigation requested (DWR only): Click to enter. square feet 4e. Riparian wetland mitigation requested: Click to enter. acres 4f. Non -riparian wetland mitigation requested: Click to enter. acres Page 13 of 21 PCN Form - Version 1.5, September 2020 4g. Coastal (tidal) wetland mitigation requested: Click to enter. acres 4h. Comments: Click LU eniei. 5. Complete if Providing a Permittee Responsible Mitigation Plan 5a. If proposing a permittee responsible mitigation plan, provide a description of the proposed mitigation plan, including the amount of mitigation proposed. Click to enter. 5b. Attach mitigation plan/documentation. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — DWR requirement 6a. Will the project result in an impact within a protected riparian buffer ❑ Yes ❑x No that requires buffer mitigation? If yes, please complete this entire section — please contact DWR for more information. 6b. If yes, identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required in the table below. 6c. 6d. 6e. Zone Reason for impact Total impact (square Multiplier Required mitigation feet) (square feet) Zone 1 Click to enter. Click to enter. :,hoose one :,lick to enter. Zone 2 Slick to enter. Click to enter. :,hoose one Click to enter. 6f. Total buffer mitigation required Click to enter. 6g. If buffer mitigation is required, is payment to a mitigation bank or ❑ Yes ❑ No NC Division of Mitigation Services proposed? 6h. If yes, attach the acceptance letter from the mitigation bank or NC Division of Mitigation Services. 6i. Comments: Buffer mitigation is not required or proposed. Page 14 of 21 PCN Form - Version 1.5, September 2020 F. Stormwater Management and Diffuse Flow Plan (DWR requirement) 1. Diffuse Flow Plan 1 a. Does the project include or is it adjacent to protected riparian buffers ❑ Yes ❑x No identified within one of the NC Riparian Buffer Protection Rules? 1 b. All buffer impacts and high ground impacts require diffuse flow or other forms of stormwater treatment. If the project is subject to a state implemented riparian buffer protection program, include a plan that fully documents how diffuse flow will be maintained. All Stormwater Control Measures (SCM) must be designed in accordance with the NC Stormwater Design Manual (https://deg.nc.gov/about/divisions/energv-mineral-land-resources/energv-mineral-land-permit- guidance/stormwater-bmp-manual). Associated supplement forms and other documentation must be provided. ❑ Level Spreader What Type of SCM are you ❑ Vegetated Conveyance (lower seasonal high water table- SHWT) providing? ❑ Wetland Swale (higher SHWT) (Check all that apply) ❑ Other SCM that removes minimum 30% nitrogen ❑ Proposed project will not create concentrated stormwater flow through the buffer For a list of options to meet the diffuse flow requirements, click here: Attach diffuse flow documentation. 2. Stormwater Management Plan 2a. Is this an NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? El Yes ❑x No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? ❑x Yes ❑ No To look up low density requirements, click here: http://reports.oah.state.nc.us/ncac/title%2015a%20-%20environmental%20guality/chapter%2002%20- %20environmental%20management/subchapter%20h/15a%20ncac%2002h%20.1003.pdf 2c. IS the project over an acre? ❑x Yes ❑ No 2d. Does this project have a stormwater management plan (SMP) reviewed and approved under a state stormwater program or state- ❑ Yes ❑x No approved local government stormwater program? Note: Projects that have vested rights, exemptions, or grandfathering from state or locally implemented stormwater programs or projects that satisfy state or locally -implemented stormwater programs through use of community in -lieu programs should answer "no" to this question. 2e. Which of the following stormwater management program(s) apply? ❑x Local Government (Check all that apply) ❑ State If you have local government approval, please include the SMP on their overall impact map. Page 15 of 21 PCN Form - Version 1.5, September 2020 ❑ Phase II ❑ USMP Local Government Stormwater Programs ❑ NSW ❑ Water Supply Please identify which local government stormwater program you are using. Davidson County Planning ❑ Phase II ❑ HQW or ORW State Stormwater Programs ❑ Coastal Counties ❑ Other Comments: A stormwater management permit is not required by Davidson County Planning. Additionally, there is no curb and gutter to concentrate stormwater flow. Grass lined swales are being left adjacent to the roads. Page 16 of 21 PCN Form - Version 1.5, September 2020 G. Supplementary Information 1. Environmental Documentation 1 a. Does the project involve an expenditure of public (federal/state/local) ❑ Yes ❑x No funds or the use of public (federal/state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental ❑ Yes ❑ No Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the ❑ Yes ❑ No NEPA or SEPA final approval letter.) Comments: A NEPA or SEPA is not required. 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DR Surface Water or Wetland Standards or Riparian Buffer Rules El Yes ❑x No W (15A NCAC 2B .0200)? 2b. If you answered "yes" to the above question, provide an explanation of the violation(s): Click to enter. 3. Cumulative Impacts (DWR Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in additional development, which could impact nearby ❑ Yes ❑x No downstream water quality? 3b. If you answered "no", provide a short narrative description: Additional development as a result of the proposed development is not anticipated. 3c. If yes, attach a qualitative or quantitative cumulative impact analysis (.pdo in accordance with the most recent DWR policy. 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project? 1 ❑ Yes ❑x No ❑ N/A 4b. If yes, describe in detail the treatment methods and dispositions (non -discharge or discharge) of wastewater generated from the proposed project. If the wastewater will be treated at a treatment plant, list the capacity available at that plant. Sewage will be discharged into on -site septic systems. Additional impacts associated with the on -site septic systems are not anticipated or proposed. Page 17 of 21 PCN Form - Version 1.5, September 2020 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected ® Yes ❑ No species or habitat? (IPAC weblink: https://www.fws.gov/ipac/ Ifws.govl) 5b. Have you checked with the USFWS concerning Endangered Species ❑ Yes ❑x No Act impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. :,hoose one 5d. Is another federal agency involved? ❑ Yes ❑x No ❑ Unknown If yes, which federal agency? Click to enter. 5e. Is this a DOT project located within Divisions 1-8? ❑ Yes ❑x No 5f. Will you cut any trees in order to conduct the work in waters of the U.S.? ®Yes ElNo 5g. Does this project involve bridge maintenance or removal? * ❑ Yes ❑x No Link to NLEB SLOPES document: http://saw-reg.usace. army. mil/NLEB/1-30-17-signed NLEB- SLOPES&apps.pdf 5h. Does this project involve the construction/ installation of a wind turbine(s)? ❑ Yes ❑x No If yes, please show the location of the wind turbine(s) on the permit drawings/ project plans (attach .pdo 5i. Does this project involve blasting and /or other percussive activities that will be conducted by machines, such as jackhammers, ❑ Yes ❑x No mechanized pile drivers, etc.? If yes, please provide details to include type of percussive activity, purpose, duration, and specific location of this activity on the property (attach .pdo 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? US Department of the Interior — Fish and Wildlife Service Official Species List from IPaC 3 listed species are identified on the IPaC report (attached). Schweinitz's sunflower and Northern Long-eared bat are listed as federally protected species. Suitable habitat for Schweinitz's sunflower was observed on the site. The majority of the habitat is marginal and consists of a densely vegetated clear cut. Pilot visited the site on September 24, 2021. We did not observe Schweinitz's sunflower at the site during our site visit. Wooded areas on the site could afford suitable summer roosting habitat for northern long-eared bats. Approximately 90% of the site consists of a recent clear-cut that is not habitat for the bat. Large trees remain along the creeks on the site. With the exception of the stream crossing and associated clearing, there are no plans to remove additional mature trees from the site. Similar habitat was observed on nearby properties. Based on a review of the June _1_2016_NLEB —HUC12 NLEB shapefiles obtained from the Raleigh Ecological Services Field Office website, the 12 digit HUC with the nearest confirmed hibernation and/or maternity sites is located more than 90 miles from the site. Therefore, tree clearing outside of the pup season (June 1 to July 31) is not likely to adversely affect the NLEB. If tree clearing activities cannot be conducted outside of the pup season, then the applicant will rely on the final 4(d) rule and any take will be considered exempt from the ESA. Attach consultation documentation. Page 18 of 21 PCN Form - Version 1.5, September 2020 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat? ❑ Yes ❑x No Are there submerged aquatic vegetation (SAV) around the project vicinity? El Yes ❑x No El Unknown Will this project affect submerged aquatic vegetation? ❑ Yes ❑x No ❑ Unknown Explain: Dlick to enter. 6b. What data source(s) did you use to determine whether your site would impact Essential Fish Habitat? Essential Fish Habitat Mapper— NOAA Fisheries Page 19 of 21 PCN Form - Version 1.5, September 2020 7. Historic or Prehistoric Cultural Resources (Corps Requirement) Link to the State Historic Preservation Office Historic Properties Map (does not include archaeological data): hftp://qis.ncdcr.gov/hpoweb/ 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status (e.g., National Historic Trust designation or ❑ Yes Z No properties significant in North Carolina history and archaeology)? 7b. What data source(s) did you use to determine whether your site would impact historic or archeological resources? NC Historic Preservation Office's HPOWEB 2.0. Historic properties were not identified on the site or on nearby properties. A "survey only" property is located approximately 2,000 feet northeast of the site. A historic farm is located approximately 2,300 feet east of the site. The historic farm is separated from the site by roads, wooded land and residences. A copy of the SHPO Map is included as an attachment. 7c. Attach historic or prehistoric documentation. 8. Flood Zone Designation (Corps Requirement) Link to the FEMA Floodplain Maps: https://msc.fema.gov/portal/search 8a. Will this project occur in a FEMA-designated 100-year floodplain? * Z Yes ❑ No 8b. If yes, explain how the project meets FEMA requirements. Per NCDOT specifications, the inverts will be buried 1 foot for aquatic passage, 2:1 slopes are being used to minimize impacts, permanent soil reinforcement matting is being installed for long-term stability to the slopes, the culvert has been sized for the 25-year storm per NCDOT requirements. A culvert approval has been obtained from the NCDOT. 8c. What source(s) did you use to make the floodplain determination? National Flood Hazard Layer froom FEMA Web Map Service — Drawing 4 (Attached) Page 20 of 21 PCN Form - Version 1.5, September 2020 H. Miscellaneous Comments: The applicant is applying for a NWP 14 for the proposed road crossing and a NWP 18 for the wetland fill. Thank - you for your assistance. Attach pertinent documentation or attachments not previously requested I. Signature * ❑x By checking the box and signing below, I, as the project proponent, certify to the following: • The project proponent hereby certifies that all information contained herein is true, accurate, and complete, to the best of my knowledge and belief; • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time; • The project proponent hereby agrees that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby agrees to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • The project proponent hereby understands that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • As the project proponent, I intend to electronically sign and submit the PCN/online form. Full Name: Michael T. Brame =i eabvMibaea,ame Michael M9baea,ame,°=pi� Signature: email=mbmmeppil°tennm.<°m, Brame d1e. . 1 /12/2022 Page 21 of 21 PCN Form - Version 1.5, September 2020 O ¢ O �o cngdda. w o��YOWy o�o�,J�moz �p �pCC q1 �_Op ��0m�oUz U6ps Z�c2 c8p� w ram.. H q 4t3Q�� V 0 �CTJ�[nUOtwif ��mcc La o Z w C42 C, z < Cc C) LU LU LL, it g uj = mE o�. �� ILL O C) LO C:) CD co I,— C:) LO 7;-" tl;+2 C) + J C le LLJ � 11 r c3i Ed to cl co CD 14* cy) gi as, O � uj �J I I I i I 1 i I i � I II 1 II f rl [r: I I rr !� I I � } �t1r'/I � N m •� r � / r Z u � J I I / r _— [ (✓ / ! / / / ! ! J ' i t V I V I J CJ ao W /J, i J • / I CC I -;//! - __ Y /I II j "� ?�• J` �� 1 r Y I i` IAtr/ J ;J r '� W 'I � � � I � i / � J Jr / '� � �ti r` l r ,r � y J� r' i r �• tC i o ,� _ .� r / r r � I I � / I I __•/ I a r rr' � r I / it �I- 4� � r _ J I \} 11 1 + I { { r � I CV CL uj EL o � UJ NJ = L. tdf 1i� o G � � w Z Q H aui R. I I. I J t • ( I 'l I I I 1 f\ I \ I pti, �I I I I I , } t 1111{I l V 111 � l I I r � I I I, I I 1 }I I I l I i ^ �n . • . • �l �y^ w I i i i I i t II I 1 1} 1�`111} I}�1 1 i �, i� II f • • . . � � � m r `I I 1� I -1 I / l .1V , ' VVII1 I1 11 V l 1) II 1 II I I1VV}IVV �I I h . • . . • � 1 . • • • li ' • ,%`' c J � cL z � � rl r .r I i I V I�1111`� 1 .} r •• No II I + � I ! 4 i. � r . • • z l l ( { l CC C:) z F-- Fo Lo tR F—ZU C:) C:) z 0 F, �j z 0 CD V5 F. C-3 fE > 000 T- 0 rr cn cc Z. C.D F- co m LLJ u LLJ C) ML T 5 LU uj O .z 0 > uj Z z 0 7 _ C- CL czLU Z3 a z N rr <c 2 cS z 19 W CL S zo F. EL LU rnV �s��a Ri R LL C3 z I 8 Sz �411 'NIN Z uj 0- Rl CD co CD oog ch LU U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2021-02152County: DavidsonU.S.G.S. Quad: NC -Lexington West NOTIFICATION OF JURISDICTIONAL DETERMINATION Reque stor: Pilot Environmental, Inc. —Arnold Road Michael Brame Address: Post Office Box 128 Kernersvile, NC 27285 Telephone Number: (336) 310-4527 E-mail: mbramckpilotenviro.com Size (acres) —78 Nearest Town Lexington Nearest Waterway Swearing Creek River Basin Upper Pee Dee USGS HUC 03040103 Coordinates Latitude:35.861761 Longitude:-80.261464 Location description: —78 acres located on the south side of Arnold Road, east George S Coble Memo rialHighway(US 52/I- 285),westof O1dUS 52 (NC Highway 8). northwest of Lexington,NC. PINs6727-04-50-9353 and6727-04-62-2 Indicate Which of the Following Apply: A. Preliminary Determination ® There appearto be waters, including wetlands on the above -de scribed project area/property, that maybe subject to Section404 of the Clean WaterAct (CWA)(33 USC § 1344) and/or Section 10 ofthe Rivers and Harbors Act (RHA) (33 USC § 403). The waters, including wetlands have been delineated, andthe delineation has been verified by the Corpsto be sufficiently accurate and reliable. The approximate boundaries of these waters are shown on the enclosed delineation mapdated DATE. Therefore, this preliminary jurisdiction determination maybe used in the permit evaluation process, including determining compensatory mitigation. For purposes of computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decisionmade on thebasis of a preliminary JD will treat allwaters and wetlands that would be affected in any way by the permitted activity on the site as if they are jurisdictionalwa ters o f the U.S. This preliminary determination is not an appealable action under the Regulatory Program Administrative AppealProce ss (Reference 33 CFR Part3 31). However, you may request an approved JD, which is an appealable action, by contacting the Corps districtfor further instruction. ❑ There appearto be waters, including wetlands on the above -de scribed project area/property, that maybe subject to Section404 of the Clean WaterAct (CWA)(33 USC § 1344) and/or Section 10 ofthe Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters, including wetlands have notbeen properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process. Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA jurisdiction over a llof the waters, including wetlands atthe project area, which is not sufficiently accurate and reliable to support an enforceable permit decision. We recommend that you have the waters, including wetlands on your project area/property delineated. As the Corps may not be able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conducta delineation that can be verified by the Corps. B. Approved Determination ❑ There are Navigable Waters of the United States within the a bove-de scribed project area/property subject to the permit requirements of Section 10 of the Rivers andHarbors Act (RHA) (33 USC § 403) and Section 404 ofthe Clean WaterAct (CWA)(33USC§ 1344). Unless there is a change in law or our published regulations, this determination maybe relied upon for a period not to exceed five years from the date of this notification. ❑ There are waters, including wetlandson the above -described project area/property subject to the permit requirements of Section 404 of the Clean WaterAct (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination maybe relied upon for a period not to exceed five years from the date ofthis notification. ❑ We recommend you have the waters, including wetlands on your project area/property delineated. As the Corps may notbe able to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultantto conduct a delineation that can be verifiedby the Corps. ❑ The waters, including wetlands on yourprojectarea/property have been delineated andthe delineationhas been verified by the Corps. The approximate boundaries of these waters are shown on the enclosed delineation map dated DATE. We strongly SAW-2021-02152 suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of allareas subjectto CWAjurisdiction on your property which, provided there is no change in the law or our published regulations, maybe relied upon fora period not to exceed five years. ❑ The waters, including wetlands have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official identified below onDATE. Unless there is a change in the law or our published regulations, this determination maybe relied upon for a period not to exceed five years from the date ofthis notification. ❑ There are no waters of the U.S., to include wetlands, pre sent on the above -de scribed project area/property which are subject to the permit requirements of Section404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination maybe relied upon for a period notto exceed five years from the date ofthis notification. ❑ The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Morehead City, NC, at (252) 808-2808 to determine their requirements. Placement of dredged or fill materialwithin waters of the US, in cludin g wetlands, without a Department ofthe Army permit may constitute a violation of Section301 of the Clean WaterAct (33 USC § 1311). Placement of dredged or fill material, construction or placement of structures, or work within navigable waters ofthe United States without a Department of the Army permit may constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or403). If you have any questions rega rdin g this determination and/or the Corps regulatory program, please contact Jean B. Gibby at (919) 554-4884, Ext.24 or Jean.B.Gibby&usace.army.mil. C. Basis For Determination: Basis For Determination: See the preliminary jurisdictional determination form dated 10/05/2021. D. Remarks: E. Attention USDA Program Participants This delineation/determinationhas been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the particular site identified in this request. The delineation/determination may notbe valid for the wetland conservation provisions of the Food Security Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work. F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B. above) If you object to this determination, you may request an administrative appealunder Corps regulations at 33 CFR Part 33 1. Enclosed you will find a Notification of Appeal Process (NAP) fact sheet and Request for Appeal (RFA) form. Ifyourequest to appealthis determination you must submit a completed RFA form to the following address: US Army Corps of Engineers South Atlantic Division Attn: Mr. Philip A. Shannin Administrative Appeal Review Officer 60 Forsyth StreetSW,FloorM9 Atlanta, Georgia 3 0303-8803 AND PH I L I P.A. SHANNIN&USACE.ARMY.MIL In order for an RFAto be accepted by the Corps, the Corps must determine that it is complete, thatit meets the criteria for appeal under 33 CFR part 331.5, andthat it has been received by the Division Office within 60 days of the date of the NAP. Should you decide to submit an RFA form, it must be received at the above address by Not applicable. * * It is not necessary to submit anRFAform to the Division Office if you do notobject to the determination in this correspondence.** Corps Regulatory Official: Date of JD:10/05/2021 ExI 4ationDateofJD:Not applicable SAW-2021-02152 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete our Customer Satisfaction Survey, located online at https://regulatory.ops.usace.anny.mil/customer-service-survey/. Copy Furnished: SAW-2021-02152 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Property Owner: Piedmont Triad Land Developers, LLC David Coe Address: Post Office Box 27357 So uthmo nt. NC 27351 Telephone Number: (336)970-7935 E-mail: coeforkgmaiLcom NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND REQUEST FOR APPEAL Applicant: Pilot Environmental, Inc.— ArnoldRoad, File Number:SAW-2021-02152 Date:10/05/2021 Michael Brame Attached is: See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A PROFFERED PERMIT (Standard Permit or Letter of permission) B PERMITDENIAL C APPROVED JURISDICTIONAL DETERMINATION D PRELIMINARY JURISDICTIONAL DETERMINATION E TION I - The following identifies yourrights and options regarding an administrative appealof the above decision. r itionalinformation may be found at orhttp://www.usace.army.miUMissions/CivilWorks/RegulatoryPro aamandPermits.aspx e Corps regulations at 33 CFR Part 331. A: INITIAL PROFFERED PERMIT: You may accept or object to the permit. • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and yourwork is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appealthe permit, including its terms and conditions, and approved jurisdictionaldeterminations associated with the permit. • OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request that the permit be modified accordingly. You must complete Section II of this form and return the form to the district engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will forfeit yourright to appealthe permit in the future. Upon receipt of your letter, the district engineer will evaluate your objections and may: (a)modify the permit to address allof your concerns, (b) modify the permit to address some of your objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in Section B below. B: PROFFERED PERMIT: You may accept or appealthe permit • ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final authorization. If you received a Letter of Permission (LOP), you may accept the LOP and yourwork is authorized. Your signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all rights to appealthe permit, including its terms and conditions, and approved jurisdictionaldeterminations associated with the permit. • APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein, you may appealthe declined permit underthe Corps of Engineers Administrative AppealProcess by completing Section II of this form and sendingthe form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. C: PERMIT DENIAL: You may appealthe denial of a permit underthe Corps of Engineers Administrative AppealProcess by completing Section II of this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days of the date of this notice. D: APPROVED JURISDICTIONAL DETERMINATION: You may acceptor appeal the approved JD or provide new information. • ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appealthe approved JD. • APPEAL: If you disagree with the approved JD, you may appealthe approved JD under the Corps of Engineers Administrative AppealProcess by completing Section II of this form and sending the form to the district engineer. This form must be received by the division engineer within 60 days of the date of this notice. E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which maybe appealed), by contactingthe Corps district for further instruction. Also you may provide newinformation for further consideration by the Corps to reevaluate the JD. SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT REASONS FORAPPEAL OROBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or objections are addressed in the administrative record.) ADDITIONAL INFORMATION: The appealis limited to a review of the administrative record, the Corps memorandum forthe record of the appealconference or meeting, and any supplemental information that the review officer has determined is needed to clarify the administrative record. Neither the appellant northe Corps may add new information or analyses to the record. However, you may provide additionalinformation to clarify the location of information that is already in the administrative record. POINT OF CONTACT FOR QUESTIONS OR INFORMATION: If you have questions regarding this decision and/orthe If you only have questions regarding the appealprocess you may appealprocess you may contact: also contact: District Engineer, Wilmington Regulatory Division MR. PHILIP A. SHANNIN Attn: Jean B. Gibby ADMINISTRATIVE APPEAL REVIEW OFFICER Raleigh Regulatory Office CESAD-PDS-O U.S Army Corps of Engineers 60 FORSYTH STREET SOUTHWEST, FLOOR M9 3331 Heritage Trade Drive, Suite 105 ATLANTA, GEORGIA 303 03-8803 Wake Fo rest, No rth Carolina 27587 PHONE: (404) 562-5136; FAX (404) 562-5138 EMAIL: PHILIP.A.SHANNINna,USACE.ARMY.MIL RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government consultants,to conduct investigations of the project site during the course of the appealprocess. You will be provided a 15-day notice of any site investigation, and will have the opportunity to participate m all site investi ations. Date: Telephone number: Signature of appellant or agent. For appeals on Initial Proffered Permits send this form to: District Engineer, Wilmington Regulatory Division, Attn: Jean B. Gibby, 69 Darlington Avenue, Wilmington, North Carolina28403 For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to: Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Philip Shannin, Administrative Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 1 OM15, Atlanta, Georgia 30303-8801 Phone: (404) 562-5137 PRELIMINARY JURISDICTIONAL DETERMINATION (PJD) FORM BACKGROUND INFORMATION A. REPORT COMPLETION DATE FOR PJD: 10.4.21 B. NAME AND ADDRESS OF PERSON REQUESTING PJD: Michael Brame, Pilot Environmental, Inc. Post Office Box 128, Kernersville, North Carolina 27285 C. DISTRICT OFFICE, FILE NAME, AND NUMBER: Wilmington, Arnold Road, SAW 2021- D. PROJECT LOCATION(S) AND BACKGROUND INFORMATION: The site is located south of Arnold Road in Lexington, NC. The site contains wooded land. The site is proposed for residential development. (USE THE TABLE BELOW TO DOCUMENT MULTIPLE AQUATIC RESOURCES AND/OR AQUATIC RESOURCES AT DIFFERENT SITES) State: North Carolina County/parish/borough: Davidson County City: Lexington Center coordinates of site (lat/long in degree decimal format): Lat.: 35.861761' Long.:-80.261464' Universal Transverse Mercator: WGS 84 Name of nearest waterbody: Swearing Creek E. REVIEW PERFORMED FOR SITE EVALUATION (CHECK ALL THAT APPLY): ❑x Office (Desk) Determination. Date: 5 Oct 2021 ❑ Field Determination. Date(s): TABLE OF AQUATIC RESOURCES INREVIEW AREA WHICH "MAY BE" SUBJECT TO REGULATORY JURISDICTION. Site Number Latitude (decimal degrees) Longitude (decimal degrees) Estimated amount of aquatic resources in review area (acreage and linear feet, if applicable Type of aquatic resources (i.e., wetland vs. non- wetland waters) Geographic authority to which the aquatic resource "may be" subject (i.e., Section 404 or Section 10/404) WA 1-4 35.8657370 -80.2603070 0.008 acres Wetland 404 SA 35.8655310 -80.2592520 3 75 linear feet Non -wetland 404 SB 35.8659260 -80.2595970 4 15 linear feet Non -wetland 404 WB 1-15 35.8586960 -80.2610110 2.042 acres Wetland 404 SC 35.8585830 -80.2604050 1, 17 5 linear feet Non -wetland 404 SD 35.8583450 -80.2630060 3 2 5 linear feet Non -wetland 404 1) The Corps of Engineers believes that there may be jurisdictional aquatic resources in the review area, and the requestor of this PJD is hereby advised of his or her option to request and obtain an approved JD (AJD) for that review area based on an informed decision after having discussed the various types of JDs and their characteristics and circumstances when they may be appropriate. 2) In any circumstance where a permit applicant obtains an individual permit, or a Nationwide General Permit (NWP) or other general permit verification requiring "pre- construction notification" (PCN), or requests verification for a non -reporting NWP or other general permit, and the permit applicant has not requested an AJD for the activity, the permit applicant is hereby made aware that: (1) the permit applicant has elected to seek a permit authorization based on a PJD, which does not make an official determination of jurisdictional aquatic resources; (2) the applicant has the option to request an AJD before accepting the terms and conditions of the permit authorization, and that basing a permit authorization on an AJD could possibly result in less compensatory mitigation being required or different special conditions; (3) the applicant has the right to request an individual permit rather than accepting the terms and conditions of the NWP or other general permit authorization; (4) the applicant can accept a permit authorization and thereby agree to comply with all the terms and conditions of that permit, including whatever mitigation requirements the Corps has determined to be necessary; (5) undertaking any activity in reliance upon the subject permit authorization without requesting an AJD constitutes the applicant's acceptance of the use of the PJD; (6) accepting a permit authorization (e.g., signing a proffered individual permit) or undertaking any activity in reliance on any form of Corps permit authorization based on a PJD constitutes agreement that all aquatic resources in the review area affected in any way by that activity will be treated as jurisdictional, and waives any challenge to such jurisdiction in any administrative orjudicial compliance or enforcement action, or in any administrative appeal or in any Federal court; and (7) whether the applicant elects to use either an AJD or a PJD, the JD will be processed as soon as practicable. Further, an AJD, a proffered individual permit (and all terms and conditions contained therein), or individual permit denial can be administratively appealed pursuant to 33 C.F.R. Part 331. If, during an administrative appeal, it becomes appropriate to make an official determination whether geographic jurisdiction exists over aquatic resources in the review area, or to provide an official delineation of jurisdictional aquatic resources in the review area, the Corps will provide an AJD to accomplish that result, as soon as is practicable. This PJD finds that there "may be" waters of the U.S. and/or that there "may be" navigable waters of the U.S. on the subject review area, and identifies all aquatic features in the review area that could be affected by the proposed activity, based on the following information: SUPPORTING DATA. Data reviewed for PJD (check all that apply) Checked items should be included in subject file. Appropriately reference sources below where indicated for all checked items: ❑ Maps, plans, plots or plat submitted by or on behalf of the PJD requestor: Map: ® Data sheets prepared/submitted by or on behalf of the PJD requestor. [ROffice concurs with data sheets/delineation report. ❑ Office does not concurwith data sheets/delineation report. Rationale: ❑ Data sheets prepared by the Corps: ❑ Corps navigable waters' study: ❑ U.S. Geological Survey Hydrologic Atlas: ❑ USGS NHD data. ❑ USGS 8 and 12 digit HUC maps. ® U.S. Geological Survey map(s). Cite scale & quad name: Drawing 1 ® Natural Resources Conservation Service Soil Survey. Citation: Drawings 2 & 2A ® National wetlands inventory map(s). Cite name: Drawing 3 ❑ State/local wetland inventory map(s): ® FENIA/FIRM maps: Drawing 4 ❑ 100-year Floodplain Elevation is: (National Geodetic Vertical Datum of 1929) ® Photographs: ®Aerial (Name & Date): Drawing 5 or ❑Other (Name & Date): ❑ Previous determination(s). File no. and date of response letter: ❑ Other information (please specify): IMPORTANT NOTE: The information recorded on this form has not necessarily been verified by the Corus and should not be relied uuon for later jurisdictional determinations. 5 Oct 21 ignature and 4tc ofiXegulatory staff member completing PJD October 4, 2021 Signature and date of person requesting PJD (REQUIRED, unless obtaining the signature is impracticable)' ' Districts may establish timeframes for requester to return signed PJD forms. If the requester does not respond within the established time frame, the district may presume concurrence and no additional follow up is necessary prior to finalizing an action. Apr WA 1-4 0.008 Ac. err SA 375 LF 011111111�'l Legend sc �{ 1,175 LF, ` Site Boundary Perennial Stream Wetland ® Common Space (Not Delineated) THE LOCATIONS OF FEATURES SHOWN ON THIS MAP ARE PRELIMINARY. THEY HAVE • Data Point NOT BEEN VERIFIED BY THE USACE AND/OR THE NCDEQ-DWR. THIS MAP INCLUDES GPS LOCATIONS OF DELINEATED FEATURES. Drawing 5 Wetland Map Aerial Imagery from ESRI " Arnold Road and Pilot GPS Data - Approximate 78-Acre Tract ' Lexington, Davidson Count NC Scale.l 500 g y, Date:9.27.21 PLOT ENVIRONMENTAL,"` Pilot Project7220 Contact Name* Contact Email Address* Project Owner* Project Name* Project County* Owner Address: Is this a transportation project?* Heather LaGamba hlagamba@pilotenviro.com Piedmont Triad Land Developers, LLC Arnold Rd Davidson Street Address PO BOX 819 Address Line 2 City Southmont Postal / Zip Code 27351 Yes No Type(s) of approval sought from the DWR: 401 Water Quality Certification - 401 Water Quality Certification - Regular Express Individual Permit Modification Shoreline Stabilization Does this project have an existing project ID#?* Yes No State / Province / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Sue Homewood Please give a brief project description below and include location information.* The applicant does not request a meeting. The applicant may submit a request for 401 WQC. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature* Submittal Date 9/29/2021 k!' Vf Jy �' �+ I 4� ■ {—--- _ter._ r 3i5 f + ' � w~ � * � � � •tip' � ��*� i # LEGEND - i - Site Boundary i` Abb Drawing 1 USGS Topographic Map USGSTopographic Map � -�` r Arnold Road Welcome, Midway, Lexington West `- -- Approximate 78-Acre Tract and Lexington East, NC Quadrangles F1��_��' ' Lexington, Davidson County, NC Scale: 1"=2,000' FIL0T ENVIK0NMENTAL,INC Pilot Project7220 6 Drawing 2 USDA Web Soil Survey of Davidson County, NC �'I-O�■ Scale: 1"-500P PILOT E N V I R 0 N M E N 7 A L. I NC Web Soil Map Arnold Road Approximate 78-Acre Tract Lexington, Davidson County, NC Pilot Project 7220 D _—VENIF— D, ~c do cca000�) CCID '} I CrF3 "a --WEfW--- j II m C CO i *PaE LEGEND Site Boundary Drawing 2A 'r Published Soil Map USDA Soil Survey _ Arnold Road of Davidson County, NC -� — Approximate 78-Acre Tract Published 1994, Sheet 5 PIL131Lexington, Davidson County, NC Scale: 1"=500' PILOT ENVIR0NMEN7AL.INC Pilot Project7220 -6 r 3u Drawing 3 NWI Map USFWS NWI Arnold Road Approximate 78-Acre Tract Wetlands Mapper Lexington, Davidson County, NC Scale: 1" = 500' PILOT ENVI RO N M ENTAL,INC Pilot Project 7220 IL I my ��m � Py.mym .. % P ga LEGEND 16 Site Boundary 0 1 % Annual Chance Flood Hazard OR egul@toiy Floodw@y 77d Sped al Floodxay Area of Undet ermined Flood Hazard 0.2%Annual Chance Flood Hazard Future Conditions 1 %Annual Chance Flood Hazard ► Area with R educed Risk Due to Levee U V WA 1-a 0.008 Ac. 57 Ac. 4. SD 325 LF w . 4 1 4mr 1* Legend sc - 1,175 LF Site Boundary Perennial Stream - Wetland ® Common Space (Not Delineated) THE LOCATIONS OF FEATURES SHOWN ON THIS MAP ARE PRELIMINARY. THEY HAVE 0 Data Point NOT BEEN VERIFIED BY THE USACE AND/OR THE NCDEQ-DWR. THIS MAP INCLUDES GPS LOCATIONS OF DELINEATED FEATURES. Drawing 5 Wetland Map Aerial Imagery from ESRI Arnold Road and Pilot GPS Data - - Approximate 78-Acre Tract Lexington, Davidson County, NC Scale: 1" = 500' pI��Q1' Date:9.27.21 . PILOT ENVIR0NMENTAL,INC Pilot Project7220 41 N mNe Fefenaudi� x .>W B2D x — n 0 n -•79ek7 le dccx5639MMM257d5iW7 1-41 United States Department of the Interior FISH AND WILDLIFE SERVICE Asheville Ecological Services Field Office 160 Zillicoa Street Asheville, NC 28801-1082 Phone: (828) 258-3939 Fax: (828) 258-5330 http://www.fws.p,ov/nc-es/es/coupiyfr.html In Reply Refer To: Consultation Code: 04EN1000-2022-SLI-0057 Event Code: 04EN1000-2022-E-00152 Project Name: Raven Ridge Subdivision October 27, 2021 Subject: List of threatened and endangered species that may occur in your proposed project location or may be affected by your proposed project To Whom It May Concern: The attached species list identifies threatened, endangered, proposed and candidate species, as well as proposed and final designated critical habitat, that may occur within the boundary of your proposed project and/or may be affected by your proposed project. Although not required by section 7, many agencies request species lists to start the informal consultation process and begin their fulfillment of the requirements under section 7(c) of the Endangered Species Act (Act) of 1973, as amended (16 U.S.C. 1531 et seq.). This list, along with other helpful resources, is also available on the U.S. Fish and Wildlife Service (Service) —Asheville Field Office's (AFO) website: https://www.fws.gov/raleigh/species/ cntylist/nc counties.html. The AFO website list includes "species of concern" — species that could potentially be placed on the federal list of threatened and endangered species in the future. Also available are: Design and Construction Recommendations https://www.fws.gov/asheville/htmis/project review/Recommendations.html Optimal Survey Times for Federally Listed Plants https://www.fws.gov/nc-es/plant/plant survey.html Northern long-eared bat Guidance https://www.fws.gov/asheville/htmis/project review/NLEB in WNC.html Predictive Habitat Model for Aquatic Species https://www.fws.gov/asheville/htmls/Maxent/Maxent.html New information based on updated surveys, changes in the abundance and distribution of species, changed habitat conditions, or other factors could require modifications of these lists. 10/27/2021 Event Code: 04EN1000-2022-E-00152 Please note that under 50 CFR 402.12(e) of the regulations implementing section 7 of the Act, the accuracy of the species lists should be verified after 90 days. This verification can be completed formally or informally as desired. The Service recommends that verification be completed by visiting the ECOS-IPaC website or the AFO website (the AFO website dates each county list with the day of the most recent update/change) at regular intervals during project planning and implementation for updates to species lists and information. An updated list may be requested through the ECOS-IPaC system by completing the same process used to receive the enclosed list or by going to the AFO website. The purpose of the Act is to provide a means whereby threatened and endangered species and the ecosystems upon which they depend may be conserved. Under sections 7(a)(1) and 7(a)(2) of the Act and its implementing regulations (50 CFR 402 et seq.), Federal agencies are required to utilize their authorities to carry out programs for the conservation of threatened and endangered species and to determine whether projects may affect threatened and endangered species and/or designated critical habitat. A Biological Assessment is required for construction projects (or other undertakings having similar physical impacts) that are major Federal actions significantly affecting the quality of the human environment as defined in the National Environmental Policy Act (42 U.S.C. 4332(2) (c)). For projects other than major construction activities, the Service suggests that a Biological Evaluation similar to a Biological Assessment be prepared to determine whether the project may affect listed or proposed species and/or designated or proposed critical habitat. Recommended contents of a Biological Assessment are described at 50 CFR 402.12 and on our office's website at https://www.fws.gov/asheville/htmis/project review/assessment guidance.html. If a Federal agency (or their non-federal representative) determines, based on the Biological Assessment or Biological Evaluation, that listed species and/or designated critical habitat may be affected by the proposed project, the agency is required to consult with the Service pursuant to 50 CFR 402. In addition, the Service recommends that candidate species, proposed species, and proposed critical habitat be addressed within the consultation. More information on the regulations and procedures for section 7 consultation, including the role of permit or license applicants, can be found in the "Endangered Species Consultation Handbook" at: http:// www.fws.gov/endangered/esa-library/pdf/TOC-GLOS.PDF. Though the bald eagle is no longer protected under the Endangered Species Act, please be aware that bald and golden eagles are protected under the Bald and Golden Eagle Protection Act (16 U.S.C. 668 et seq.), and projects affecting these species may require additional consultation (see https://www.fws.gov/southeast/our-services/permits/eagles/). Wind energy projects should follow the wind energy guidelines (http://www.fws.gov/windenerg_y/) for minimizing impacts to migratory birds (including bald and golden eagles) and bats. Guidance for minimizing impacts to migratory birds for projects including communications towers (e.g., cellular, digital television, radio, and emergency broadcast) can be found at: http:// www. fws. gov/migratorybirds/CurrentBirdlssues/Hazards/towers/towers.htm; http://www.towerkill.com; andhttp://www.fws.gov/migratoDbirds/CurrentBirdlssues/Hazards/ towers/comtow.html. 10/27/2021 Event Code: 04EN1000-2022-E-00152 3 We appreciate your concern for threatened and endangered species. The Service encourages Federal agencies to include conservation of threatened and endangered species into their project planning to further the purposes of the Act. Please include the Consultation Tracking Number in the header of this letter with any request for consultation or correspondence about your project that you submit to our office. Attachment(s): • Official Species List • Migratory Birds • Wetlands 10/27/2021 Event Code: 04EN1000-2022-E-00152 Official Species List This list is provided pursuant to Section 7 of the Endangered Species Act, and fulfills the requirement for Federal agencies to "request of the Secretary of the Interior information whether any species which is listed or proposed to be listed may be present in the area of a proposed action". This species list is provided by: Asheville Ecological Services Field Office 160 Zillicoa Street Asheville, NC 28801-1082 (828) 258-3939 10/27/2021 Event Code: 04EN1000-2022-E-00152 2 Project Summary Consultation Code: 04EN1000-2022-SLI-0057 Event Code: Some(04EN1000-2022-E-00152) Project Name: Raven Ridge Subdivision Project Type: DEVELOPMENT Project Description: The site is proposed for development with a single family residential subdivision. Project Location: Approximate location of the project can be viewed in Google Maps: https: www.google.com/maps/(a-)35.8623731,-80.26172570748966,14z Counties: Davidson County, North Carolina 10/27/2021 Event Code: 04EN1000-2022-E-00152 3 Endangered Species Act Species There is a total of 3 threatened, endangered, or candidate species on this species list. Species on this list should be considered in an effects analysis for your project and could include species that exist in another geographic area. For example, certain fish may appear on the species list because a project could affect downstream species. IPaC does not display listed species or critical habitats under the sole jurisdiction of NOAA Fisheriesi, as USFWS does not have the authority to speak on behalf of NOAA and the Department of Commerce. See the "Critical habitats" section below for those critical habitats that lie wholly or partially within your project area under this office's jurisdiction. Please contact the designated FWS office if you have questions. 1. NOAA Fisheries, also known as the National Marine Fisheries Service (NMFS), is an office of the National Oceanic and Atmospheric Administration within the Department of Commerce. Mammals NAME STATUS Northern Long-eared Bat Myotis septentrionalis Threatened No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/9045 Insects NAME STATUS Monarch Butterfly Danaus plexippus Candidate No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/9743 Flowering Plants NAME STATUS Schweinitz's Sunflower Helianthus schweinitzii Endangered No critical habitat has been designated for this species. Species profile: https:Hecos.fws.gov/ecp/species/3849 Critical habitats THERE ARE NO CRITICAL HABITATS WITHIN YOUR PROJECT AREA UNDER THIS OFFICE'S JURISDICTION. 10/27/2021 Event Code: 04EN1000-2022-E-00152 Migratory Birds Certain birds are protected under the Migratory Bird Treaty Act! and the Bald and Golden Eagle Protection Act2. Any person or organization who plans or conducts activities that may result in impacts to migratory birds, eagles, and their habitats should follow appropriate regulations and consider implementing appropriate conservation measures, as described below. 1. The Migratory Birds Treat. Act of 1918. 2. The Bald and Golden Eagle Protection Act of 1940. 3. 50 C.F.R. Sec. 10.12 and 16 U.S.C. Sec. 668(a) The birds listed below are birds of particular concern either because they occur on the USFWS Birds of Conservation Concern (BCC) list or warrant special attention in your project location. To learn more about the levels of concern for birds on your list and how this list is generated, see the FAQ below. This is not a list of every bird you may find in this location, nor a guarantee that every bird on this list will be found in your project area. To see exact locations of where birders and the general public have sighted birds in and around your project area, visit the E-bird data mapping tool (Tip: enter your location, desired date range and a species on your list). For projects that occur off the Atlantic Coast, additional maps and models detailing the relative occurrence and abundance of bird species on your list are available. Links to additional information about Atlantic Coast birds, and other important information about your migratory bird list, including how to properly interpret and use your migratory bird report, can be found below. For guidance on when to schedule activities or implement avoidance and minimization measures to reduce impacts to migratory birds on your list, click on the PROBABILITY OF PRESENCE SUMMARY at the top of your list to see when these birds are most likely to be present and breeding in your project area. NAME BREEDING SEASON Red-headed Woodpecker Melanerpes erythrocephalus Breeds May 10 to Sep 10 This is a Bird of Conservation Concern (BCC) throughout its range in the continental USA and Alaska. Probability Of Presence Summary The graphs below provide our best understanding of when birds of concern are most likely to be present in your project area. This information can be used to tailor and schedule your project activities to avoid or minimize impacts to birds. Please make sure you read and understand the FAQ "Proper Interpretation and Use of Your Migratory Bird Report" before using or attempting to interpret this report. Probability of Presence (■) 10/27/2021 Event Code: 04EN1000-2022-E-00152 Each green bar represents the bird's relative probability of presence in the 10km grid cell(s) your project overlaps during a particular week of the year. (A year is represented as 12 4-week months.) A taller bar indicates a higher probability of species presence. The survey effort (see below) can be used to establish a level of confidence in the presence score. One can have higher confidence in the presence score if the corresponding survey effort is also high. How is the probability of presence score calculated? The calculation is done in three steps: 1. The probability of presence for each week is calculated as the number of survey events in the week where the species was detected divided by the total number of survey events for that week. For example, if in week 12 there were 20 survey events and the Spotted Towhee was found in 5 of them, the probability of presence of the Spotted Towhee in week 12 is 0.25. 2. To properly present the pattern of presence across the year, the relative probability of presence is calculated. This is the probability of presence divided by the maximum probability of presence across all weeks. For example, imagine the probability of presence in week 20 for the Spotted Towhee is 0.05, and that the probability of presence at week 12 (0.25) is the maximum of any week of the year. The relative probability of presence on week 12 is 0.25/0.25 = 1; at week 20 it is 0.05/0.25 = 0.2. 3. The relative probability of presence calculated in the previous step undergoes a statistical conversion so that all possible values fall between 0 and 10, inclusive. This is the probability of presence score. Breeding Season( ) Yellow bars denote a very liberal estimate of the time -frame inside which the bird breeds across its entire range. If there are no yellow bars shown for a bird, it does not breed in your project area. Survey Effort (1) Vertical black lines superimposed on probability of presence bars indicate the number of surveys performed for that species in the 10km grid cell(s) your project area overlaps. The number of surveys is expressed as a range, for example, 33 to 64 surveys. No Data (—) A week is marked as having no data if there were no survey events for that week. Survey Timeframe Surveys from only the last 10 years are used in order to ensure delivery of currently relevant information. The exception to this is areas off the Atlantic coast, where bird returns are based on all years of available data, since data in these areas is currently much more sparse. ■ probability of presence breeding season I survey effort — no data SPECIES JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC 10/27/2021 Event Code: 04EN1000-2022-E-00152 3 Red-headed Woodpecker ---- --+— — — — — — — — — — — — — — — — — — — — — — — — — ---- BCC Rangewide (CON) Additional information can be found using the following links: • Birds of Conservation Concern http://www.fws.gov/birds/management/managed-species/ birds-of-conservation-concern.php • Measures for avoiding and minimizing impacts to birds http://www.fws.gov/birds/ management/project-assessment-tools-and-guidance/ conservation-measures.php • Nationwide conservation measures for birds http://www.fws.gov/migrato . b� irds/pdf/ management/nationwidestandardconservationmeasures. pdf Migratory Birds FAQ Tell me more about conservation measures I can implement to avoid or minimize impacts to migratory birds. Nationwide Conservation Measures describes measures that can help avoid and minimize impacts to all birds at any location year round. Implementation of these measures is particularly important when birds are most likely to occur in the project area. When birds may be breeding in the area, identifying the locations of any active nests and avoiding their destruction is a very helpful impact minimization measure. To see when birds are most likely to occur and be breeding in your project area, view the Probability of Presence Summary. Additional measures or permits may be advisable depending on the type of activity you are conducting and the type of infrastructure or bird species present on your project site. What does IPaC use to generate the migratory birds potentially occurring in my specified location? The Migratory Bird Resource List is comprised of USFWS Birds of Conservation Concern (BCQ and other species that may warrant special attention in your project location. The migratory bird list generated for your project is derived from data provided by the Avian Knowledge Network (AKN). The AKN data is based on a growing collection of survey, banding-, and citizen science datasets and is queried and filtered to return a list of those birds reported as occurring in the 10km grid cell(s) which your project intersects, and that have been identified as warranting special attention because they are a BCC species in that area, an eagle (Eagle Act requirements may apply), or a species that has a particular vulnerability to offshore activities or development. Again, the Migratory Bird Resource list includes only a subset of birds that may occur in your project area. It is not representative of all birds that may occur in your project area. To get a list of all birds potentially present in your project area, please visit the AKN Phenology Tool. What does IPaC use to generate the probability of presence graphs for the migratory birds potentially occurring in my specified location? 10/27/2021 Event Code: 04EN1000-2022-E-00152 The probability of presence graphs associated with your migratory bird list are based on data provided by the Avian Knowledge Network (AKN). This data is derived from a growing collection of survey, banding, and citizen science datasets . Probability of presence data is continuously being updated as new and better information becomes available. To learn more about how the probability of presence graphs are produced and how to interpret them, go the Probability of Presence Summary and then click on the "Tell me about these graphs" link. How do I know if a bird is breeding, wintering, migrating or present year-round in my project area? To see what part of a particular bird's range your project area falls within (i.e. breeding, wintering, migrating or year-round), you may refer to the following resources: The Cornell Lab of Ornithology All About Birds Bird Guide, or (if you are unsuccessful in locating the bird of interest there), the Cornell Lab of Ornithology Neotropical Birds guide. If a bird on your migratory bird species list has a breeding season associated with it, if that bird does occur in your project area, there may be nests present at some point within the timeframe specified. If "Breeds elsewhere" is indicated, then the bird likely does not breed in your project area. What are the levels of concern for migratory birds? Migratory birds delivered through IPaC fall into the following distinct categories of concern: 1. "BCC Rangewide" birds are Birds of Conservation Concern (BCC) that are of concern throughout their range anywhere within the USA (including Hawaii, the Pacific Islands, Puerto Rico, and the Virgin Islands); 2. "BCC - BCR" birds are BCCs that are of concern only in particular Bird Conservation Regions (BCRs) in the continental USA; and 3. "Non -BCC - Vulnerable" birds are not BCC species in your project area, but appear on your list either because of the Eagle Act requirements (for eagles) or (for non -eagles) potential susceptibilities in offshore areas from certain types of development or activities (e.g. offshore energy development or longline fishing). Although it is important to try to avoid and minimize impacts to all birds, efforts should be made, in particular, to avoid and minimize impacts to the birds on this list, especially eagles and BCC species of rangewide concern. For more information on conservation measures you can implement to help avoid and minimize migratory bird impacts and requirements for eagles, please see the FAQs for these topics. Details about birds that are potentially affected by offshore projects For additional details about the relative occurrence and abundance of both individual bird species and groups of bird species within your project area off the Atlantic Coast, please visit the Northeast Ocean Data Portal. The Portal also offers data and information about other taxa besides birds that may be helpful to you in your project review. Alternately, you may download the bird model results files underlying the portal maps through the NOAA NCCOS Integrative Statistical Modeling and Predictive Mapping of Marine Bird Distributions and Abundance on the Atlantic Outer Continental Shelf project webpage. 10/27/2021 Event Code: 04EN1000-2022-E-00152 5 Bird tracking data can also provide additional details about occurrence and habitat use throughout the year, including migration. Models relying on survey data may not include this information. For additional information on marine bird tracking data, see the Diving Bird Study and the nanotag studies or contact Caleb Spiegel or Pam Lorin. What if I have eagles on my list? If your project has the potential to disturb or kill eagles, you may need to obtain a permit to avoid violating the Eagle Act should such impacts occur. Proper Interpretation and Use of Your Migratory Bird Report The migratory bird list generated is not a list of all birds in your project area, only a subset of birds of priority concern. To learn more about how your list is generated, and see options for identifying what other birds may be in your project area, please see the FAQ "What does IPaC use to generate the migratory birds potentially occurring in my specified location". Please be aware this report provides the "probability of presence" of birds within the 10 km grid cell(s) that overlap your project; not your exact project footprint. On the graphs provided, please also look carefully at the survey effort (indicated by the black vertical bar) and for the existence of the "no data" indicator (a red horizontal bar). A high survey effort is the key component. If the survey effort is high, then the probability of presence score can be viewed as more dependable. In contrast, a low survey effort bar or no data bar means a lack of data and, therefore, a lack of certainty about presence of the species. This list is not perfect; it is simply a starting point for identifying what birds of concern have the potential to be in your project area, when they might be there, and if they might be breeding (which means nests might be present). The list helps you know what to look for to confirm presence, and helps guide you in knowing when to implement conservation measures to avoid or minimize potential impacts from your project activities, should presence be confirmed. To learn more about conservation measures, visit the FAQ "Tell me about conservation measures I can implement to avoid or minimize impacts to migratory birds" at the bottom of your migratory bird trust resources page. 10/27/2021 Event Code: 04EN1000-2022-E-00152 Wetlands Impacts to NWI wetlands and other aquatic habitats may be subject to regulation under Section 404 of the Clean Water Act, or other State/Federal statutes. For more information please contact the Regulatory Program of the local U.S. Army Corps of Engineers District. Please note that the NWI data being shown may be out of date. We are currently working to update our NWI data set. We recommend you verify these results with a site visit to determine the actual extent of wetlands on site. RIVERINE • R5UBH