Loading...
HomeMy WebLinkAbout20201589 Ver 1_B-5845_Section 106 Requirements_20210913_202201121 David Petty From:Stacy Oberhausen Sent:Monday, September 13, 2021 1:29 PM To:Wyatt, Jeffrey L Cc:Jimmy Terry Subject:B-5845 Happy Monday Jeff!    Last week I met with Loretta Barren (FHWA) and Renee Gledhill‐Earley (NCDCR) to discuss Section 106 requirements  for B‐5845. From the two meetings the following applies to B‐5845:   FHWA stated no Federal monies, no 4(f)   NCDCR stated no requirements with state funded projects   NCDCR stated that if a federal permit is required then proof that an archaeological survey is not required or  there are no archaeological impacts associated with the proposed project construction    Regarding the LWCF award received for Moss Lake Park … I have not identified a person with the Town who is  familiar with LWCF or the process. Our research  indicates that the $159K was likely used for the development of the  westside, Moss Lake Park II, during 1979 – 1984. Moss Lake Park II does not border SR 2033 so we should be outside  of the APE for Section 6(f).    Thanks, Stacy  Stacy B. Oberhausen, PE, CPM  TGS Engineers 706 Hillsborough Street ‐ Suite 200 │ Raleigh, NC 27603  soberhausen@tgsengineers.com    I am working from home; email is preferred and usually the quickest response.