Loading...
HomeMy WebLinkAbout20060961 Ver 1_Emails_2007072340/wade Subject: 40/wade From: "Todd Preuninger" <TPreuninger@withersravenel.com> Date: Mon, 23 Jul 2007 15:52:03 -0400 To: "Annette Lucas" <annette.lucas@ncmail.net> Hey annette, one more question -got the attached on -hold letter for 40/wade it basically asks for 2 items -soils specs and depth for our bio-retention. we provided across-section and soil details in the right hand corner on sheet 6 - I'm not sure what else we need to do and 2) it asks for our woody component for the exetended detention wetlands - i can't recall ever doing trees or shrubs in a constructed wetland, bio-retention -yes, but wetlands? the table our letter references refers to the bio-retention design -not extended detention wetlands. my question is this - do we need to do anything else for DWQ, since i think all of the requested info. is in our permit package for item 1, and i think maybe item 2 is a mistake? and when do you think we might be able to expect an approval letter? OK, so that was two questions. thanks, todd ~~~ t~ec~a~r~~;F.~ W/ITIHE~~ .~`~~ i'~'A-VENEL ±:z ~~Saca:ei r J*ice~ ~ -<r!, t~c~rr ~ arofina z~~z;a ii I't~ C' i~ ] ~j 1 7 i`i i ,, Lf ~t f''3 . 'Content-Description: on-holdletter.pdf '~; on-holdletter.pdf'' Content-Type: application/octet-stream '' 'Content-Encoding: base64 1 of 1 7/26/2007 12:22 PM