Loading...
HomeMy WebLinkAboutNCC204770_NOT Closeout Documents_20220107A V OilN9E0 t 838 Erosion and Sediment Control Site Inspection Report Report Generated: 04-05-21 11:33am Project Name: Chick-fil-a Jurisdiction: Henderson County Inspected: Entire Project Site NPDES Number: 202000038 Permittee: Jason Dillard Whbass Inspector: Deb Johnston jdillard@whbass.com Inspection Completed: 04-05-2021 11:28 am Report Completed: 04-05-2021 11:28 am Inspection weather: Temperature: 64 degrees, Clear Inspection Type: Monthly Current Activity: Pavement Install;Finish Grading; Seed ing/Stabilization;Site Build Current Site Status: ompliance 1) Do conditions prevent inspection at this time? No 2) Does this site qualify for stormwater phase 2 post construction runoff? No 3) Are plans, inspection logs and permits on -site and available for review, Yes as required? 4) Are construction entrances installed and maintained, as required? Yes 5) Are roads and ROW's free of evidence of sediment? Yes 6) Are perimeter erosion and sediment controls installed and maintained, Yes as required? 7) Are culvert, inlet and catch basin protections installed and maintained, Yes as required? 8) Are sediment basins or sediment traps installed and maintained as Yes required and functioning correctly? 9) Is site free of evidence of erosion? Yes 10) Are trash, debris, concrete waste and solid wastes managed, as Yes required? 11) Are fuels and chemicals stored, managed and contained, as required? Yes Chick-fil-a inspected on 04-05-21 11:28am Inspection Report Page 1 of 6 33855 A 1 4 EpUN9E01838 Erosion and Sediment Control Site Inspection Report Report Generated: 04-05-21 11:33am 12) Are vehicle and equipment fueling, cleaning and maintenance areas Yes free of eveidence of spills leaks, or any other deliterious material? 13) Are all inactive slopes and disturbed areas stabilized, as required? Yes 14) Have BMPs kept sediment and pollutants out of surface waters? Yes 15) Are stockpiles and spoils managed, protected and stabilized, as Yes required? Are dewatering measures in use, as required? 16) Yes 17) Does the site comply with dust control best management practices? Yes 18) Are discharge points and receiving waters free of evidence of sediment Yes deposits? Do all BMPs provided operate as designed? 19) Yes Are discharge points and receiving waters free of evidence of pollution 20) Yes (e.g. oil sheen, floating or suspended solids, etc.)? General Notes & Observations 21) None recorded 22) Is withholding of permits recommended as a result of this inspection? No Photo 1 - 4/05/2021 11:33am Chick-fil-a inspected on 04-05-21 11:28am Inspection Report Page 2 of 6 33855 SIN CCUNTy RENDER Erosion and Sediment Control Site Inspection Report rt Generated: 04-05-21 11:33am Photo 2 - 4/05/2021 11:33am Photo 3 - 4/05/2021 11:33am Chick-fil-a inspected on 04-05-21 11:28am Inspection Report Page 3 of 6 33855 /NDmo� N// m .,.. Erosion and Sediment Control Site Inspection Report 4Generated: OJ&y 9a3m Photo 4-4O5/2O11£33 m Photo s-4O5/2O11£33 m Chickfi- inspected on 0 - 5211£ 28 m Inspection Report Page 4 of G 33855 A" EpUN9E01838 Erosion and Sediment Control Site Inspection Report rt Generated: 04-05-21 11:33am Photo 6 - 4/05/2021 11:33am Photo 7 - 4/05/2021 11:33am 23) Are all temporary measures removed and has the site reached permanent stability? In Deb Johnston, PE PE #027411 Yes Chick-fil-a inspected on 04-05-21 11:28am Inspection Report Page 5 of 6 33855 SIN CCUNTy RENDER Erosion and Sediment Control Site Inspection Report rt Generated: 04-05-21 11:33am Site Tech - Assistant Engineer Henderson County Site Development (828) 694-6521 djohnston@hendersoncountync.gov Chick-fil-a inspected on 04-05-21 11:28am Inspection Report Page 6 of 6 33855