Loading...
HomeMy WebLinkAbout20220060 Ver 1_Pre-Filing Meeting Information_20220110Contact Name* Contact Email Address* Project Owner* Project Name* Project County* Owner Address: Is this a transportation project?* Deborah Shirley dshirley@sandec.com Comet Development, LLC (Attn: Seth Coker) Comet Raleigh Apartments Wake Street Address P.O. Box 116 Address Line 2 City Colfax Postal / Zip Code 27235 Yes No Type(s) of approval sought from the DWR: 401 Water Quality Certification - 401 Water Quality Certification - Regular Express Individual Permit Modification Shoreline Stabilization Does this project have an existing project ID#?* Yes No State / Province / Region NC Country USA Do you know the name of the staff member you would like to request a meeting with? Colleen Cohn Please give a brief project description below and include location information.* The Comet Raleigh Apartments project is a proposed multi -family residential development located at 8705 Louisburg Road in Wake Forest, NC. The project is proposed the construction of a residential development including but not limited to roadway infrastructure, residential lots, SCMs, utilities and amenities/club house. Specifically, there are two proposed road crossings that impact streams and buffers. Existing conditions onsite consists primarily of forested land with a single family house located in the southwestern portion of the property. General land use in the vicinity of the project consists of forested land with single family homes. Louisburg Road bounds the property to the south. Forestville Road is located west of the property. By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. 1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. 1 also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature* .SSG? — Submittal Date 10/20/2021