HomeMy WebLinkAbout20220060 Ver 1_Pre-Filing Meeting Information_20220110Contact Name*
Contact Email Address*
Project Owner*
Project Name*
Project County*
Owner Address:
Is this a transportation project?*
Deborah Shirley
dshirley@sandec.com
Comet Development, LLC (Attn: Seth Coker)
Comet Raleigh Apartments
Wake
Street Address
P.O. Box 116
Address Line 2
City
Colfax
Postal / Zip Code
27235
Yes No
Type(s) of approval sought from the DWR:
401 Water Quality Certification - 401 Water Quality Certification -
Regular Express
Individual Permit Modification
Shoreline Stabilization
Does this project have an existing project ID#?*
Yes No
State / Province / Region
NC
Country
USA
Do you know the name of the staff member you would like to request a meeting with?
Colleen Cohn
Please give a brief project description below and include location information.*
The Comet Raleigh Apartments project is a proposed multi -family
residential development located at 8705 Louisburg Road in Wake
Forest, NC. The project is proposed the construction of a residential
development including but not limited to roadway infrastructure,
residential lots, SCMs, utilities and amenities/club house. Specifically,
there are two proposed road crossings that impact streams and
buffers. Existing conditions onsite consists primarily of forested land
with a single family house located in the southwestern portion of the
property. General land use in the vicinity of the project consists of
forested land with single family homes. Louisburg Road bounds the
property to the south. Forestville Road is located west of the property.
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401
Certification Rule.
1 understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
1 also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting
location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you
can submit an application.
Signature*
.SSG? —
Submittal Date 10/20/2021