HomeMy WebLinkAboutSite Inspection 1.10.22 Br 29 WhiteoakWetland Inspection Report
Inspection Type:
Reason for Inspection:
Inspection Date:
Site Owner Name:
Latitude:
County:
Project Name:
Project Num:
Location:
SW Plan Location:
20190178
NCDOT - Replace Bridge 29 on SR 1475
Macon
NCDOT - Replace Bridge 29 on SR 1475
NC DOT Division 14 - Sylva
1/10/2022
Routine
Site Inspection (DOT)
Version: 1 Status:Issued
Project Type:Replace bridge with bridge
Region:Asheville
Longitude:-83° 36' 55''+35° 13' 16''
Inspection Contact Person:Title:Phone:
On-Site Representative(s):
Secondary Inspector(s):
Primary Inspector:Phone:Robert K Mitchell
Facility Compliance Status:Compliant Not Compliant
Question Areas:
Program Areas:401 (includes isolated/non-404)
Permit (401 WQC)
Site inspection was conducted by Kevin Mitchell with the Asheville Regional Office on January 10, 2022. Crew was not
on site. The following are items that need attention:
- Station L 13+30 LT - Groundcover needed beyond silt fence. All disturbed areas within the 25 foot trout buffer need
ground cover.
- NPDES records were not up to date/available during the time of the inpsection. Rain gauge read ~ 1.6 inches.
Inspections are required within 24 hours of a 1 inch rainfall event.
Inspection Summary:
page:1
Inspection Date:
Site Number:
Inspection Type:
Owner:
Reason for Visit:
20190178
1/10/2022
Blazer, Keith
Site Inspection (DOT)Routine
Permit (401 WQC)Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit?
Are the culverts and/or filled areas installed properly?
Is the site compliant with additional conditions of the 401 WQC or non 404 permit?
Comment:
page:2