Loading...
HomeMy WebLinkAboutNCC217036_ESC Approval Submitted_20220111ITT . .... lilfANVR M.t XORTN CAR&Mv DIr9 c[or Eriirervr{?ttetr,dl Q a Th December 15, 2021. LETTER OF APPROVAL Caviness & Cates Building and Development Company Christopher Cates, Vice. President 639 Executive Place, Suite 400 Fayetteville, NC 28305 RE: Project Name: Brookwood SID Phase 2. (Lo.ts# 30 -.34, 38s 39,44 46 53) Acres Approved: 6.17 Project ID: MOORE-2022-025 County: Moore, City: McNeill Address. ' Enfield Drive River Basin:. Cape Fear : Stream Classifid0o.n: Other Submitted by.Johnny. Tew Date Received by. LQS: December 13, 2021 Plan Type:. Residential Dear Mr. Cates: This office has reviewed. the subject erosion and sedimentation control plan. We fnd the plan to be acceptable and herebyissue this Letter of Approval. The enclosed Certificate of Approval must be posted at. the job site, This plan. shall expire three (3) years following the. date of approval, if no [and disturbing. activity has been undertaken, as is, required by Title 15A NCAC 4B 10129. As of April 1, 2019, all new construction) activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate. of Coverage (COC) under the. NCGO10000 Construction, Stormwater General Permit.' . This form MUST be-subrriitted and COC issued prior to the commencement of any land disturbing activity on the above -named project: The NOI form may be. accessed. atgle .nc. ov11VC.G01- Please direct questions about the NOI form. to Annette Lucas at Anriette.lucas ncdenr. ov or Paul Clark at Paul.clark(a ncdenr.gov. After you . submit a complete and correct NOI Form, a COC will be'emailed to you within three bi�sintess days. Initially, DEMLR will not charge a fee for coverage under the NCGO 1 permit. However, on or after June 1, 201.9, a $j 00 fee will be charged annually: This fee is to be seatto: the DEMLR Storinwater Central Office staff in Raleigh. - . *7.� twlar�h.�axnlirvaTJeparkrrzettt,af�mmv�conment�aiC�u�itYg(DivfgonafEnexgy;mineral -and iarid't8esaurm r 1 aye�te fie ltwar a1000,0 1 2 C SC t; Sultc 734 I .F ye t �t [I ,PIY,r Ca ali�ra .d Q �' ur�umnrxmkui?RMNNv,n,aLtc" .. -- 91f�4f��'�O() - Title 15A NCAC. 4413 .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO 1 permit and the .COC, once it is received. 3. Records of inspections made during the previous 30 days. Also, this letter gives the notice required by G.S. 113A-61..1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural, resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North- Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply„to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based. in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. This permit allows for a land -disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. Any addition in impervious surface, over that already noted on the approved plan, would also require a revised plan to verify the . appropriateness of the erosion control measures and the stormwater retention measures. (GS 1 i 3A-54.1(b)). In addition, it would be Helpful if you'notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, C. %X . &A&,, Chris Baker Assistant Regional Engineer DEMLR - Fayetteville Regional Office Enclosures: Certificate of Approval cc: ' Glen Tew, P. E., ELLS Global, Inc. — electronic. copy Debra Ensminger, Moore County Inspections Office — electronic copy Fayetteville Regional Office