Loading...
HomeMy WebLinkAboutGW1-2021-00491_Well Construction - GW1_20211222 WELL CONSTRUCTION RECORD(GW-1) For Internal Use Only: 1.Well Contractor Information: Hugo Rivas ,. �Y Well Contractor Name FROM TO DESCRIPTION ft. ft. 3159 ft. ft. NC Well Contractor Certification Number Mcpherson Well Drilling FROM TO DIAMETER THICKNESS MATERIAL 0 ft 170 ft- 2 in. sch40 1pvc Company Name r ��N1iRt�'€iH�it/dR=-`Tl3�TCi.'�nfhe�ni9lF.Iossesl-I 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County,State, Variance,etc.) ft. ft. in. 3.Well Use(check well use): yyy fit. y( ft. in. �Vl(�1Ctk f..yj roiF fug?:£ ��. Water Supply Well: FROM TO DIAMETER`SLOT SIZE THICKNESS MATERIAL ❑Agricultural ❑Municipal/Pubhc 170 ft. 180 ft- 2 in. 8 sch40 pvc ❑Geothermal(Heating/Cooling Supply) InResidential Water Supply(single) ft 170 rt in. ❑Industrial/Commercial ❑Residential Water Supply(shared) F z ❑Irri ation ❑Wells>100,000 GPD FROM TO `MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: 0 ft. 3 ft. cement pour ❑Monitoring ❑Recovery 3 ft. 100 ft- bentonite tremmie Injection Well: ❑Aquifer Recharge ❑Groundwater Remediation ❑Aquifer Storage and Recovery ❑Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD ^ ❑Aquifer Test ❑StormwaterDrainage 100 ft' 180 rt• gravel 1#1 pour ❑Experimental Technology ❑Subsidence Control ❑Geothermal(Closed Loop) ❑Tracer 20 RII1tiT >e 'z4dtlitlonal="shuts g)cess8 1 ,' ❑Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION(color,Hardness,soil/rock type,grain size,etc.) 0 ft. 100 ft. clay ,. . : 4.Date Well(s)Completed: 1 0/26/21 Well ID# 100 ft- 135 ft- sand 5a.Well Location: 135 tt• 150 tt• clay / Catherin Pierce 150 ft• 151 ft• limestone 021 Facility/Owner Name Facility ID#(ifapplicable) 151 ft' 180 ft- sand 56 Henry Jones Dr Whiteville NC 28472 Physical Address,City,and Zip ft. ft. Columbus �� County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one]at/long is sufficient) 22.Certi Ication ••J!/ 7 N W 6.Is(are)the well(s): I_IPermanent or ❑Temporary Signa ure ofCerti ied Well ntractor Date By signing this form,I hereby certii ,that the well(s)was(were)constructed in accordance with 7.Is this a repair to an existing well: ❑Yes or [!]No 15A NCAC 02C.0100 or ISA NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out known well construction information and explain the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on the back oJ'this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well construction info construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 180 (ft.) Submit this GW-1 within 30 days of well completion per the following: For multiple wells list all depths ijdierent(example-3@200'and 2@I00') 25 24a. For All Wells: Original form to Division of Water Resources (DWR), Iff Static water level below top of casing: (ft.) Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 water level is above casing,use"+" 11.Borehole diameter•' 6 (in.) 24b.For Injection Wells: Copy to.DWR,Underground Injection Control(IUC) Program, 1636 MSC,Raleigh,NC 27699-1636 12.Well construction method: Rotary 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed FOR WATER SUPPLY WELLS ONLY: ^ 24d.For Water Wells producing over 100,000 GPD: Copy to DWR,CCPCUA (gP ) Method of test: ~13a.Yield m 20 I r Permit Program,1611 MSC,Raleigh,NC 27699-1611 13b.Disinfection type: Granular Amount: 1/8 Form GW-I North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6-2018