HomeMy WebLinkAboutB-4484 barge request
Carpenter,Kristi
From:Ward, Garcy
Sent:Monday, January 10, 2022 11:24 AM
To:Johnson, Jay B
Cc:Steffens, Thomas A SAW; Lane, Stephen
Subject:B-4484 barge request
Jay,
I’ve reviewed your modification request dated 12/15/21 to allow for the temporary placement of barges to aid in the
construction of the temporary work bridge at the overflow bridge site. This will not require a modification of 401 Water
Quality Certification No. WQC004214 dated March 24, 2020. Adherence to Condition No. 18 is required along with all
other conditions of the original certification and any subsequent modifications:
18. All bridge construction shall be performed from the existing bridge, temporary work bridges, temporary causeways, or
floating or sunken barges. If work conditions require barges, they shall be floated into position and then sunk. The barges
shall not be sunk and then dragged into position. Under no circumstances should barges be dragged along the bottom of the
surface water. \[15A NCAC 02H .0506(b)(3)\]
Let me know if you have any questions.
Garcy Ward
Environmental Specialist
Division of Water Resources
252-948-3917
1