Loading...
HomeMy WebLinkAboutB-4484 barge request Carpenter,Kristi From:Ward, Garcy Sent:Monday, January 10, 2022 11:24 AM To:Johnson, Jay B Cc:Steffens, Thomas A SAW; Lane, Stephen Subject:B-4484 barge request Jay, I’ve reviewed your modification request dated 12/15/21 to allow for the temporary placement of barges to aid in the construction of the temporary work bridge at the overflow bridge site. This will not require a modification of 401 Water Quality Certification No. WQC004214 dated March 24, 2020. Adherence to Condition No. 18 is required along with all other conditions of the original certification and any subsequent modifications: 18. All bridge construction shall be performed from the existing bridge, temporary work bridges, temporary causeways, or floating or sunken barges. If work conditions require barges, they shall be floated into position and then sunk. The barges shall not be sunk and then dragged into position. Under no circumstances should barges be dragged along the bottom of the surface water. \[15A NCAC 02H .0506(b)(3)\] Let me know if you have any questions. Garcy Ward Environmental Specialist Division of Water Resources 252-948-3917 1