Loading...
HomeMy WebLinkAboutNC0066516_Pretreatment Audit_20211228DocuSign Envelope ID: 9CCO9DD7-254D-454C-B16B-2DC32D3CD620 ROY COOPER. Governor ELIZABETH S. BISER Secretary S. DANIEL SMITH Director Mr. Michael Wagner Public Utilities Director Town of Fuquay-Varina 401 Old Honeycutt Rd. Fuquay-Varina, NC 27526 NORTH CAROLINA Environmental Quality December 28, 2021 Subject: Pretreatment Audit Town of Fuquay-Varina, Terrible Creek WWTP NPDES Permit No. NC0066516 Wake County Dear Mr. Wagner: On September 28, 2021, Cheng Zhang of the Raleigh Regional Office conducted an audit of Town of Fuquay-Varina's pretreatment program. The assistance given by Mr. Chris Grimes, the Public Utilities Operations Manager, and Mr. Adam Stephenson, the Wastewater Treatment Plant Supervisor, was greatly appreciated. The inspection report is attached. Findings during the inspection were as follows: 1. The Town has one Significant Industrial User (SIU), which is also a Categorical Industrial User (CIU). It was noted that the SIU was not in Significant Non -Compliance (SNC) during the two most recent semi-annual periods. 2. The pretreatment inspection file review included John Deere Turf Care (Permit No. 0003). The files needed for review were available for inspection, contained all the required elements. In the first half of 2021, the SIU did not have any limit violations, but was late in submitting monitoring report for the first quarter, and did not submit TTO certification for the period. The POTW failed to identify these reporting violations. The POTW needs to take enforcement as required by the Enforcement Response Plan. 3. A review of the files containing the pretreatment program elements was conducted. All files were available, up to date, and well organized. Headworks Analysis update was submitted on August 31, 2020, and is in review by the Division. 4. Long Term Monitoring Plan (LTMP) will resume one year before the next due date for Headworks Analysis update. NOR�D_E �aearbnenl al Environmental 9uallly North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office 13800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 DocuSign Envelope ID: 9CCO9DD7-254D-454C-B16B-2DC32D3CD620 5. As part of the audit, the inspector watched Mr. Stephenson conduct an inspection of the lone SIU, John Deere Turf Care. The inspection was very thorough. Please respond in writing within 30 days of receipt of this letter regarding Item 3. If you have any questions or comments, please call Cheng Zhang at (919) 791-4200 (or email: Cheng. zhang@ncdenr. gov). Sincerely, DocuSigned by: bssittAAA-ssa. f. (ft tAlt (, B2916E6AB32144F... Vanessa E. Manuel, Assistant Regional Supervisor Water Quality Regional Operations Section Raleigh Regional Office Division of Water Resources Attachments: PT Audit Form Cc: Central Files w/attachment (Laserfiche) Raleigh Regional Office w/attachment Chris Grimes, Town of Fuquay-Varina (electronic copy only) 1:11 NORTH CAROLINA Ilea.�vm or enwmmnmenteiau.rm\ North Carolina Department of Environmental Quality I Division of Water Resources Raleigh Regional Office r 3800 Barrett Drive I Raleigh, North Carolina 27609 919.791.4200 DocuSign Envelope ID: 9CCO9DD7-254D-454C-B16B-2DC32D3CD620 NORTH CAROLINA DIVISION OF WATER RESOURCES PRETREATMENT AUDIT REPORT Water Resources ENVIRONMENTAL QUALITY Background Information [Complete prior to audit; review Program Info Database Sheet(s)] 1. Control Authority (POTW) Name: Town of Fuquay-Varina 2. Control Authority Representative(s): Chris Grimes; Adam Stephenson 3. Title(s): Public Utilities Operations Manager; Wastewater Treatment Plant Supervisor 4. Address of POTW: Mailing 1415 Holland Road City Fuquay-Varina Phone Number 919-753-1013 Fax Number Zip Code 27526 E-Mail cgrimes(i/fuquay-varina.org 5. Audit Date 09/28/2021 6. Last Inspection Date: 05/24/2019 Inspection Type: ® PCI ❑ Audit 7. Has Program Completed All Requirements from the Previous Inspection and Program Info Sheet(s) ? ❑ Yes ❑ No If No, Explain. 8. In the last year has the POTW experienced any NPDES or Sludge Permit compliance problems? ® Yes ❑ No If Yes, Explain. Ammonia, 2-2021; TP, 6-2020. 3-2020; 9. Is POTW under an Order That Includes Pretreatment Conditions? ❑ Yes ® No Order Type and Number: Are Milestone Dates Being Met? ❑ Yes ❑ No ® NA Parameters Covered Under Order ICIS Coding Main Program Permit Number INICI0I0I6 16 15 11 16 I 10. Current Number of Sivnificant Industrial Users (SIUs)? 11. Number of SIUs with No IUP, or with an Expired IUP? MM/DD/YY 09 28 21 1 0 12. Number of SIUs Not Inspected by POTW in Last Calendar Year? 0 13. Number of SIUs Not Sampled by POTW in Last Calendar Year? 0 14. Number of SIUs in SNC for Limits Violations During Either of Last 2 Semi -Annual Periods? 0 15. Number of SIUs in SNC for Reporting During Either of Last 2 Semi -Annual Periods? 0 16. Number of SIUs in SNC with Pretreatment Schedule? 0 17. Number of SIUs on Schedules? 0 18. Current Number of Categorical Industrial Users (CIUs)? 19. Number of CIUs in SNC? 1 0 NC DWR Pretreatment Audit Form Revised: December 2016 Page 1 DocuSign Envelope ID: 9CCO9DD7-254D-454C-B16B-2DC32D3CD620 20. PRETREATMENT PROGRAM ELEMENTS REVIEW- Review POTW files, verify POTW has copy of each Program Element in their File, complete with all supporting documents and PERCS Approval Letter, and dates consistent with Program Info: Program Element Last Submittal Date In file? Last Approval Date In file Date Next Due, If Applicable Headworks Analysis (HWA) 8/31/2020 ❑ Yes ❑ No 5/1/2014 ❑ Yes ❑ No 5/1/2020 Industrial Waste Survey (IWS) 12/14/2016 ❑ Yes ❑ No 3/6/2017 ❑ Yes ❑ No 11/1/2021 Sewer Use Ordinance (SUO) 1/29/2014 ❑ Yes ❑ No 5/9/2014 ❑ Yes ❑ No Enforcement Response Plan (ERP) 6/10/2020 ❑ Yes ❑ No 9/2/2020 ❑ Yes ❑ No Long Term Monitoring Plan (LTMP) 1/28/2019 ❑ Yes ❑ No 3/6/2019 ❑ Yes ❑ No Legal Authority (Sewer Use Ordinance-SUO) 21. Do you have any towns and/or areas from which you receive wastewater which are not in your annexed jurisdiction? ❑ Yes ® No If yes, Please list these towns and/or areas. 22. If yes to #21, Do you have current Interjurisdictional Agreements (IJAs) or other Contracts? ❑ Yes ❑ No ® NA A copy, if not already submitted, should be sent to Division. 23. If yes to #21, Have you had any trouble working with these towns or districts? ❑ Yes ❑ No ® NA If yes, Explain. 24. Date of Last SUO Adoption by Local Council 3/4/2013 25. Have you had any problems interpreting or enforcing any part of the SUO? ❑ Yes ® No If yes, Explain. Enforcement (Enforcement Response Plan-ERP) 26. Did you send a copy of the ERP to your industries? ❑ Yes ❑ No If no, POTW must send copy within 30 days. 27. Have you had any problems interpreting or enforcing any part of the ERP (i.e. any adjudication, improper enforcement, etc? ❑ Yes ® No If yes, Explain. 28. List Industries under a Schedule or Order and Type of Schedule or Order None Resources 29. Please Rate the Followine: S=Satisfactory M=Marginal U=Unsatisfacto Rating Explanation, if Unsatisfactory Personnel Available for Maintaining POTW's Pretreatment Program a S ❑M ❑U Access to POTW Vehicles for Sampling, Inspections, and Emergencies CS ❑M ❑U Access to Operable Sampling Equipment 0 S ❑M ❑U Availability of Funds if Needed for Additional Sampling and/or Analysis 0 S ❑M ❑U Reference Materials ►1S ❑M ❑U Staff Training (i.e. Annual and Regional Workshops, Etc.) 0 S ❑M ❑U Computer Equipment (Hardware and Software) 0 S ❑M ❑U NC DWR Pretreatment Audit Form Revised: December 2016 Page 2 DocuSign Envelope ID: 9CCO9DD7-254D-454C-B16B-2DC32D3CD620 30. Does the POTW have an adequate data management system to run the pretreatment program? ® Yes ❑ No Explain Yes or No. Microsoft Excel 31. How does the POTW recover the cost of the Pretreatment Program from their industries? Explain. Industrial water/sewer rate Public Perception/ Participation 32. Are there any local issues affecting the pretreatment program (e.g.. odor, plant closing, new or proposed plants)? ❑ Yes ® No If yes, Explain. 33. Has any one from the public ever requested to review pretreatment program files? ❑ Yes ® No If yes, Explain procedure. If no, how would the request be addressed? Need to make an appointment with Utilities Director 34. Has any industry ever requested that certain information remain confidential from the public? ® Yes ❑ No If yes, Explain procedure for determining whether information qualified for confidential status, as well as procedure for keeping files confidential from public. If no how would the request be addressed? Proprietary information and trade secrets are considered confidential and kept in a locked file. 35. In addition to annual inspection, does the POTW periodically meet with industries to discuss pretreatment? ® Yes ❑ No 36. Is the public notified about changes in the SUO or Local Limits? ® Yes ❑ No 37. Were all industries in SNC published in the last notice? ❑ Yes ❑ No ® NA Permitting (Industrial Waste Survey-IWS) 38. How does the POTW become aware of new or changed Users? From the Town's water billing department, IWS forms are completed for new users 39. Once the POTW becomes aware of new or changed Users, how does the POTW determine which industries have the reasonable potential to adversely impact the WWTP and therefore require a new permit or a permit revision? (Who is an SIU?) Review IWS to determine if the user is a SIU or CIU. 40. Does the POTW receive waste from any groundwater remediation projects (petroleum, CERCLA) or landfill leachate? ▪ Yes No If Yes, How many are there? Please list each site and how it is permitted, if applicable. 41. Does the POTW accept waste by (mark if applicable) ❑ Truck ❑Dedicated Pipe ® NA 42. If the POTW accepts trucked waste, what controls are placed on this waste? (example. designated point, samples drawn, manifests required) 43. How does the POTW allocate its loading to industries? Mark all that apply ❑ Uniform Limits ® Historical Industry Need ❑ By Surcharge ® Categorical Limits ❑ Other Explain Other: 44. Review POTW's copies of current allocation tables for each WWTP. Are there any over allocations? ❑ Yes ® No If yes, what parameters are over allocated? 45. If yes to #44, What is being done to address the over allocations? (short-term IUPs, HWA to be revised, pollutant study, etc.) 46. Does the POTW keep pollutant loading in reserve for future growth / safety? ❑ Yes ® No If yes, what percentage of each parameter % POTW has plenty capacity 47. Has the POTW experienced any difficulty in allocation? (for example: adjudication by an industry) ❑ Yes ® No If yes, Explain. 48. How does the POTW decide on which pollutants to limit in the permits? Monitor for? (for example: were only those pollutants listed on the application limited; categorical parameters; NPDES Pollutants of Concern) Categorical parameters, NPDES POCs, POCs based on activity being performed by Industry NC DWR Pretreatment Audit Form Revised: December 2016 Page 3 DocuSign Envelope ID: 9CCO9DD7-254D-454C-B16B-2DC32D3CD620 49. How does the POTW decide what the monitoring frequency should be for the various pollutants in industry permits? Explain. Have chosen a frequency greater than the minimum required. Permit Compliance 50. Does the POTW currently have or during the past year had any permits under adjudication? ❑ Yes ® No If yes, which industries? What was (will be) the outcome of the adjudication? Spreadsheet for limit violations, postmark dates for reporting violations. 51. Demonstrate how the POTW judges compliance. This should include compliance judgment on all violations of limits, reporting requirements, and permit conditions, as well as for SNC. 52. Does the POTW use the Division's model inspection form or equivalent? ® Yes ❑ No If no, does the POTW form include all Division data? ❑ Yes ❑ No 53. Were all SIUs evaluated for the need of a slug/spill control plan during their most recent inspections? ® Yes ❑ No If no, Explain. 54. What criteria are used to determine if a slug/spill control plan is needed? Chemical storage, floor drains 55. What criteria does the POTW use to determine if a submitted slug/spill control plan is adequate? EPA Guidance 56. How does the POTW decide where the sample point for an SIU should be located? Sampling of batch discharge at process only location 57. Has the POTW established a procedure to ensure that representative samples will be taken by the POTW or SIU each time? (example: correct location; proper programming of sampler; clean equipment; swirling the sample bucket uniformly) POTW: ® Yes ❑ No SIU: ® Yes ❑ No If yes, Explain. 58. Who performs sample analysis for the POTW for Metals Meritech Conventional Parameters Meritech Organics Meritech 59. Explain the Chain of Custody Procedure used for both in house and commercial lab samples. Both POTW and SIU follow Meritech's COC procedure. Long/Short Term Monitoring Plan (L/STMP) and Headworks Analysis (HWA) 60a. Is LTMP/STMP Monitoring Being Conducted at Appropriate Locations and Frequencies? ® YES ❑ NO 60b. Are Correct Detection Levels being used for all LTMP/STMP Monitoring? ® YES ❑ NO 60c. Is LTMP/STMP Data Maintained in Table or Equivalent? ❑ YES ® NO Is Table Adequate? ® NA 60d. All LTMP/STMP effluent data on Discharge Monitoring Report (DMR)? ® YES ❑ NO Division Inspector, verify yourself! 60e. If NO to any above, list violations 60f. Should any Pollutants of Concern be Eliminated from or Added to LTMP/STMP? ❑ YES ® NO If yes, which ones? Eliminated: Added: 61. Do you complete your own headworks analysis (HWA) ? ❑ Yes ® No If no, who completes your HWA? Hazen & Sawyer Phone (919)833--7152 62. Do you have plans to revise your HWA in the near future? ® Yes ❑ No If yes, what is the reason for the revision? (mark all that apply) ❑Increased average flow ❑NPDES limits change ❑More LTMP data available ❑Resolve over allocation ®5 year expiration ❑Other Explain. 63. In general, what is the most limiting criteria of your HWA? ❑Inhibition ® Pass Through ❑Sludge Quality 64. Do you see any way to increase your loading in the future (Example: obtaining more land for sludge disposal)? ❑ Yes ® No Explain. Final sludge will be used for composting. NC DWR Pretreatment Audit Form Revised: December 2016 Page 4 DocuSign Envelope ID: 9CCO9DD7-254D-454C-B16B-2DC32D3CD620 Summary 65. Do you plan any significant changes to the pretreatment program or changes to the WWTP that may affect pretreatment? NC DWR Pretreatment Audit Form Revised: December 2016 Page 5 DocuSign Envelope ID: 9CCO9DD7-254D-454C-B16B-2DC32D3CD620 INDUSTRIAL USER PERMIT (IUP) FILE REVIEW (3 IUP FILE REVIEWS AND 1 IU INSPECTION) 66. User Name 1. John Deere Turf Care 2. 3. 67. IUP Number 0003 68. Does File Contain Current Permit? 0 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 69. Permit Expiration Date 3/31/2024 70. Categorical Standard Applied (I.E. 40 CFR, Etc.) Or N/A 433 71. Does File Contain Permit Application Completed Within One Year Prior to Permit Issue Date? /1 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 72. Does File Contain Inspection Completed Within Last Calendar Year? /1 Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No 73. a. Does File Contain Slug/Spill Control Plan? b. If No, is One Needed? (See Inspection Form from POTW) a. ►Yes •No b. •Yes •No a. •Yes •No b. •Yes ■No a. •Yes •No b. •Yes •No Certification, Does File Contain a Toxic (TOMP)? ❑Yes❑No❑N/A ❑ Yes ❑No❑N/A ❑Yes❑No❑N/A 74. For 40 CFR 413 and 433 TTO Organic Management Plan 75. a. Does File Contain Original Permit Review Letter from Division? b. All Issues Resolved? a. ►Yes •No b.❑Yes❑No❑N/A a. •Yes •No b.❑Yes❑No❑N/A a. •Yes •No b.❑Yes❑No❑N/A 76. During Most Recent Semi -Annual Period, Did POTW Complete its Sampling as Required by IUP, including Flow? ❑ Yes /1 No ❑ Yes ❑ No ❑ Yes ❑ No 77. Does File Contain POTW Sampling Chain -Of -Custody Forms? ❑Yes❑NoON/A ❑ Yes ❑ No ❑ Yes ❑ No 78. During Most Recent Semi -Annual Period, Did SIU Complete its Sampling as Required by IUP, including Flow? ®Yes❑No❑N/A ❑ Yes ❑No❑N/A ❑Yes❑No❑N/A 79. During Most Recent Semi -Annual Period, Did SIU submit all reports on time? ❑Yes®No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 80a. For categorical IUs with Combined Wastestream Formula (CWF), does file include process/dilution flows as Required by IUP? ❑Yes❑NoON/A ❑ Yes ❑No❑N/A ❑Yes❑No❑N/A 80b. For categorical IUs with Production based limits, does file include production rates and/or flows as Required by IUP? ❑Yes❑NoON/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 81. During Most Recent Semi -Annual Period, Did POTW Identify All Limits Non -Compliance from Both POTW and SIU Sampling? ❑Yes❑NoON/A ❑ Yes ❑ No ❑ Yes ❑ No 82. During Most Recent Semi -Annual Period, Did POTW Identify All Reporting Non -Compliance from SIU Sampling? ❑Yes®No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 83. a. Was POTW Notified by SIU (Within 24 Hours) of All Self- Monitoring Violations? b. Did Industry Resample and submit results to POTW within 30 Days? c. If applicable, did POTW resample and obtain results within 30 days of becoming aware of SIU limit violations in the POTW's sampling of SIU? a.❑Yes❑No®N/A b.❑Yes❑No®N/A c.❑Yes❑No®N/A a.❑Yes❑No❑N/A b.❑Yes ❑No❑N/A c.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A c.❑Yes❑No❑N/A 84. During Most Recent Semi -Annual Period, Was SIU in SNC? ❑ Yes 1 No ❑ Yes ❑ No ❑ Yes ❑ No 85. During Most Recent Semi -Annual Period, Was Enforcement Taken as Specified in POTW's ERP (NOVs, Penalties, timing, etc.)? ❑Yes®No❑N/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 86. Does File Contain Penalty Assessment Notices? ❑Yes❑No ON/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 87. Does File Contain Proof Of Penalty Collection? ❑Yes❑NoON/A ❑Yes❑No❑N/A ❑Yes❑No❑N/A 88. a. Does File Contain Any Current Enforcement Orders? b. Is SIU in Compliance with Order? a.❑Yes❑No®N/A b.❑Yes❑No®N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A a.❑Yes❑No❑N/A b.❑Yes❑No❑N/A 89. Did POTW Representative Have Difficulty in Obtaining Any Requested Information For You? ❑ Yes A No ❑ Yes ❑ No ❑ Yes ❑ No FILE REVIEW COMMENTS: 79 — The SIU did not submit flow reports for months in which samples were not taken; report for 1 St quarter of 2021 was submitted late; the SIU did not submit TTO certification for the 1 St semi-annual period of 2021. 82 — The POTW failed to identify these reporting violations NC DWR Pretreatment Audit Form Revised: December 2016 Page 6 DocuSign Envelope ID: 9CCO9DD7-254D-454C-B16B-2DC32D3CD620 NC DWR Pretreatment Audit Form Revised: December 2016 Page 7 DocuSign Envelope ID: 9CCO9DD7-254D-454C-B16B-2DC32D3CD620 INDUSTRY INSPECTION ICIS CODING: Main Program Permit Number MM/DD/YY INICIO 10 16 1 6 1 5 11 1 6 I 109 128 121 I 1. Industry Inspected: John Deere Turf Care 2. Industry Address: 6507 NC-55, Fuquay-Varina, NC 27526 3. Type of Industry/Product: Metal finisher/Turf care equipment 4. Industry Contact: Daniel Budreau Title: Environmental Engineer Phone: 765-655-3133 Fax: 5. Does the POTW Use the Division Model Inspection Form or Equivalent? ® Yes ❑ No 6. Did the POTW Contact Conduct the Following Parts of the Industrial Inspection Thoroughly? Comments: A. Initial Interview ® Yes ❑ No B. Plant Tour ® Yes ❑ No C. Pretreatment Tour ® Yes ❑ No D. Sampling Review ® Yes ❑ No E. Exit Interview ® Yes ❑ No Industrial Inspection Comments: POTW representative conducted a thorough inspection. Audit SUMMARY AND COMMENTS: Audit Comments: POTW failed to identify reporting violations Requirements: POTW needs to require SIU to submit flow reports for months when samples are not taken; and TTO certification every six months. POTW needs to take enforcement action for the reporting violations. Recommendations: NOD: ❑ Yes ® No NOV: ❑ Yes ® No QNCR: ❑ Yes ® No POTW Rating: Satisfactory ❑ Marginal ® Unsatisfactory ❑ Audit COMPLETED BY: Cheng Zhang, Raleigh Regional Office DATE: 9/28/2021 NC DWR Pretreatment Audit Form Revised: December 2016 Page 8