Loading...
HomeMy WebLinkAbout20061001 Ver 1_Year 5 Monitoring Report_20140121FINAL ANNUAL MONITORING REPORT GOLDSBORO HOUSING AUTHORITY STREAM RESTORATION WAYNE COUNTY, NORTH CAROLINA (EEP Project Number 145, Contract No. 09070009) Construction Completed October 2008 Monitoring Year 5 of 5 (2013) 06-160) +% 20414 wsuand3 r t f �AE- - .� r% a Branch Submitted to: North Carolina Department of Environment and Natural Resources Ecosystem Enhancement Program Raleigh, North Carolina RECEIVED December 2013 L)E C 2013 NC ECOSYSTEM ENHANCEMENT PROGRAM FINAL ANNUAL MONITORING REPORT GOLDSBORO HOUSING AUTHORITY STREAM RESTORATION WAYNE COUNTY, NORTH CAROLINA (EEP Project Number 145, Contract No. 09070009) Construction Completed October 2008 Monitoring Year 5 of 5 (2013) Submitted to: North Carolina Department of Enviroiunent and Natural Resources Ecosystem Enhancement Program Raleigh, North Carolina Prepared by: Axiom Environmental, Inc. 218 Snow Avenue Raleigh, North Carolina 27603 Design Firm: Dewberry & Davis 2301 Rexwoods Drive Raleigh, North Carolina 27607 r� Axiom Environmental, Inc. •'" December 2013 Table of Contents 1 0 EXECUTIVE SUMMARY /PROJECT ABSTRACT 2 0 METHODOLOGY 2 1 Vegetation Assessment 2 2 Stream Assessment 3 0 REFERENCES List of Figures Figure 1 Site Location Appendix A Figure 2 Monitoring Plan View Appendix B List of Tables Table 1 Site Restoration Structures and Objectives Appendix A Table 2 Project Activity and Reporting History Appendix A Table 3 Project Contacts Table Appendix A Table 4 Project Attribute Table Appendix A Table 5 Vegetation Plot Mitigation Success Summary Table Appendix C Table 6 Vegetation Metadata Table Appendix C Table 7 Total and Planted Stems by Plot and Species Appendix C Table 8 Verification of Bankfull Events Appendix E Appendices APPENDIX A PROJECT VICINITY MAP AND BACKGROUND TABLES Figure 1 Site Location Table 1 Site Restoration Structures and Objectives Table 2 Project Activity and Reporting History Table 3 Project Contacts Table Table 4 Project Attributes Table APPENDIX B VISUAL ASSESSMENT DATA Figure 2 Current Conditions Plan View Figure 3 Asset Map Vegetation Monitoring Plot Photos APPENDIX C VEGETATION ASSESSMENT DATA Table 5 Vegetation Plot Mitigation Success Summary Vegetation Monitoring Plot Photos CVS Summary Data Tables Table 6 Vegetation Metadata Table Table 7 Total and Planted Stems by Plot and Species APPENDIX D STREAM SURVEY DATA Cross - section Plots APPENDIX E HYDROLOGIC DATA Table 8 Verification of Bankfull Events APPENDIX F BMP ASSESSMENT DATA Fixed Photo Stations APPENDIX G SUPPLEMENTAL PLANTING Goldsboro Housing Authority (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina page i Appendices (continued) APPENDIX H ADDITIONAL SITE PHOTOGRAPHS Preconstruction Site Photographs Asbuilt Site Photographs APPENDIX I ADDITIONAL SITE MAPPING Soils Map from 2006 Restoration Plan Goldsboro Housing Authority (final) EEP Project Number 145 Wayne County, North Carolina Axiom Environmental, Inc Monitoring Year 5 of 5 (2013) December 2013 page it 1.0 EXECUTIVE SUMMARY/PROJECT ABSTRACT The Goldsboro Housing Authority Mitigation Site (Site) is located in the northeast quadrant of the intersection of NC -581 and US -13 within the West Haven Apartments complex owned by the Goldsboro Housing Authority (GHA) in central Wayne County As constructed the Site provides 799 stream mitigation units The Site is located in United States Geological Survey (USGS) Hydrologic Unit 03020201200020 (North Carolina Division of Water Quality Subbasin 03- 04 -05) of the Neuse River Basin The Site was identified to assist the North Carolina Ecosystem Enhancement Program in meeting mitigation goals Primary activities at the Site included stream enhancement (levels I and II), creation of a Best Management Practice (BMP) constructed wetland, and replanting riparian areas with native vegetation Project restoration efforts provided 799 Stream Mitigation Units and 1 Stormwater Wetland credit This report (compiled based on EEP's Procedural Guidance and Content Requirements for EEP Monitoring Reports Version 1 4 dated 11/7/11) summarizes data for year 5 (2013) monitoring The primary components of the restoration project included the following 1 In keeping with the Neuse River Basinwide Management Plan developed by the North Carolina Division of Water Quality ( NCDWQ), a mayor goal of the project is to reduce sediment and other water quality stressors, nitrogen in particular, to the receiving watershed This was achieved via the following measures a Restore channel dimension throughout the Site to include bank resloping, benching, and provision of reference appropriate width -depth ratios to reduce near bank stress and attendant erosion, and to move bedload towards equilibrium, thereby preventing future bank instability related to potential bed aggradation and /or degradation b Replace the existing highly managed grass with an appropriate vegetated buffer providing root mass that will stabilize project banks, treating both overland and groundwater inputs c Install a large stormwater wetland adjacent to Unnamed Tributary to Borden Field Ditch (UTBFD) designed to receive and provide off -line treatment for a portion of storm flow that meets or exceeds a 1 -inch storm event, which on average and over the long term is expected to occur several times per year This will provide a significant sediment and biogeochemical sink for the inputs from the UTBFD watershed The drainage area of the UTBFD is approximately 125 acres with approximately 50 acres of impervious surface The existing Nitrogen load to the UTBFD at the location of the stormwater wetland is approximately 1229 pounds per year with an estimated potential reduction of 498 pounds per year as a result of BMP stormwater treatment Calculations were provided in the design document and site plans permitted by NCDWQ It is anticipated that the stormwater wetland will receive flow during several storm events each year, as the typical 1 inch storm event and the one year design storm are expected to overtop the weir by 1 8 or 2 7 feet, respectively 2 Attenuate storm flows and excess hydrologic energies associated with this highly urban watershed via 1 a,b,c 3 Enhance the natural aesthetic of the project corridor 4 Increase local awareness of natural resources in an urban setting and the conditions necessary for their improvement /enhancement Based on interagency guidelines (USACE 2003), success criteria dictate that survival of woody species planted at mitigation sites should be at a minimum density of 320 stems per acre at the end of the third monitoring year Subsequently, 290 stems per acre must be surviving at the end of year 4 and 260 stems Goldsboro Housing Authority (final) Axiom Environmental, Inc Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina page 1 per acre at the end of year 5 Based on the number of stems counted, average densities were measured at 648 planted stems per acre (excluding livestakes) surviving in year 5 (2013) All three vegetation plots met success criteria based on planted stems, ranging from 404 to 1052 planted stems per acres, with 3 to 7 planted species noted per plot When considering all stems including natural recruits, stem densities ranged from 1255 to 2185 native woody stems per acre with 8 to 10 species noted per plot (13 species Site wide) Supplemental planting of the Site occurred on February 3, 2012 with 460 containerized trees as follows These trees appear to be vigorous with a high survival rate Areas planted are depicted on mapping in Appendix G Species Quantity Planted Scarlet Oak uercus coccmea 75 River Birch Betula m ra 116 Green Ash Fraxinus enns lvanica 111 Su arberr Celtis laevi ata 74 Shumard Oak uercus shumardu 84 One dense Japanese honeysuckle (Lonicei a japonica) population was identified on the outer rim of the stormwater BMP This area is identified on Figure 2 (Appendix B) Invasive species controls, consisting of two herbicide treatments, occurred during the summer of 2013 Treatments targeted Chinese privet (Ligustrum sinense), callery pear (Pyrus calleryana), and tree of heaven (Ailanthus altissima) throughout the area between Oak Street and Aster Court (see photo to right) Treatments included cutting and applying herbicide to stumps of larger woody stems, and foliar application of herbicide to smaller material Success criteria for Site streams, to assure that project goals are being achieved, will primarily be based on indicators and trends describing the stability of the channel and success of the riparian buffer In addition, a minimum of two bankfull events must be documented within the standard 5 year monitoring period In order for the monitoring to be considered complete, the bankfull events must occur in separate monitoring years Overall the reach has conserved the riffle cross - sectional area in the last few monitoring years and bank erosion is minimal to non - existent across the Site However, there are a few depositional areas, which seem to be the result of trash and debris deposited in the channel or washed in during storm events This was most notable in Cross - section 2 for Year 4 (2012) and Year 5 (2013), while Cross - section 3 indicated prior sediment deposition was mobilized in Year 5 (2013), these depositional areas were not accompanied by channel widening Cross - section 4 had to be reset in Year 4 (2012) and exhibits a later shift as a result, however, the cross - sectional area was conserved In addition, two bankfull events were documented to occur in Year 5 (2013) to date for a total of ten bankfull events during the monitoring period Two stream areas of concern were noted within the Site as outlined in the following table (Figure 2, Appendix B) Goldsboro Housing Authority (final) Axiom Environmental, Inc Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina page 2 Stream Areas of Concern Map Identifier Feature /Issue Probable Cause Area of Concern 1 A gradation at an upstream bend Sediment deposition from culvert outlet Area of Concern 2 Aggradation at a pool near veg plot 2 Sediment and trash deposition from the surrounding community In summary, the Site achieved success criteria for vegetation and stream attributes in the Fifth Monitoring Year (2013) Summary information and data related to the occurrence of items such as beaver or encroachment and statistics related to performance of various project and monitoring elements can be found in table and figures within this report's appendices Narrative background and supporting information formerly found in these reports can be found in the mitigation and restoration plan documents available on EEPs website All raw data supporting the tables and figures in the appendices is available from EEP upon request Goldsboro Housing Authority (final) Axiom Environmental, Inc Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina page 3 2.0 METHODOLOGY 2.1 Vegetation Assessment Following Site construction, three plots (20- meters by 5- meters) were established and monumented with metal rebar at all plot corners Plots were surveyed on September 17, 2013 for the year 5 (2013) monitoring season Sampling was conducted as outlined in the CVS -EEP Protocol for Recording Vegetation, Version 4 2 (Lee et al 2008) (http / /cvs bio unc edu /methods htm), results are included in Appendix C The taxonomic standard for vegetation used for this document was Flora of the Carolinas, Virginia, Georgia, and Surrounding Areas (Weakley 2007) The locations of vegetation monitoring plots are depicted on Figure 2 in Appendix B 2.2 Stream Assessment Four permanent cross - sections were established after construction was completed Measurements of each cross - section include points at all breaks in slope including top of bank, bankfull, and thalweg Riffle cross - sections are classified using the Applied Fluvial Morphology (Rosgen 1996) stream classification system Cross - section plots and data are included in Appendix D, the locations of cross - sections are depicted on Figure 2 in Appendix B 3.0 REFERENCES Lee, Michael T, R K Peet, S D Roberts, and T R Wentworth 2008 CVS -EEP Protocol for Recording Vegetation, Version 4 0 (online) Available http / /cvs bio unc edu /methods htm Rosgen, D 1996 Applied River Morphology Wildland Hydrology (Publisher) Pagosa Springs, Colorado United States Army Corps of Engineers (USACE), United States Environmental Protection Agency (USEPA), North Carolina Wildlife Resources Commission (NCWRC), Natural Resources Conservation Service (NRCS), and North Carolina Division of Water Quality (NCDWQ) 2003 Stream Mitigation Guidelines State of North Carolina Weakley, Alan S 2007 Flora of the Carolinas, Virginia, Georgia, and Surrounding Areas (online) Available http Hwww herbarium unc edu /WeakleysFlora pdf [February 1, 2008] University of North Carolina Herbarium, North Carolina Botanical Garden, University of North Carolina, Chapel Hill, North Carolina Weather Underground 2012 Station at Goldsboro Airport, North Carolina (online) Available http Hwww wunderground com /cgi- bin / findweather /getForecast ?query =35 33916855,- 77 96055603 [August 23, 2012] Weather Underground Weather Underground 2013 Station KNCGOLDS7 in Goldsboro, North Carolina (online) Available http Hwww wundei, roLind com /weatheistati on /WX Dal I Hy istoi}_asp9lD= KNCGOLDS7 [October 2, 2013] Weather Underground Goldsboro Housing Authority (final) Axiom Environmental, Inc Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina page 3 APPENDIX A PROJECT VICINITY MAP AND BACKGROUND TABLES Figure 1 Site Location Table 1 Site Restoration Structures and Objectives Table 2 Project Activity and Reporting History Table 3 Project Contacts Table Table 4 Project Attributes Table Goldsboro Housing Authority (final) Axiom Environmental Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices 1 !1- ;, Directions to Site + f - From Goldsboro Bypass US 117 exit onto NC581 (W. Ash St.) �' n/ - Go east towards downtown Goldsboro �'?�'t!s�`5tt'lil ' - First left onto N. Alabama Ave. „i �z -. - Cross W. Oak St. and park at community center 35'23 23.49" N, Lang 78 00' 16.14" W ,.. (Lat �;! ' '- - i % r�,.�.-_•�'r Jj,' Q0.. •'�e°l,�` l r1�1 r — ) ti ' z i Law �7i Jj r i 1 l" r f r ��' IItiV .IN Q 1 ,• ' /+ wY • �` v+` st nr • ~�, 'i�^ ; tJ ; � ,y���•V 1_ p. �• ' �i�!ii. .�ti. I •�)C s+' lit Its 11 • JWI *'� ,'yam -� ' Vr US •�.�, � '� � � � ~ / 1 ' �.r �•F ,�'.i[t'- '�$,•r' ' `• :X ^ ,` �l i.+t„� 1 fr4•` ,.•� f. ,r `t . •� ' �' I �� •,r it •:�., 'ice „ c tti { • �, �.4 � 1 1 US 13 117 Alabama Ave. and +�w Bypass W Oak St. Intersection _ 14 . Y , '� - '•�` Sd�_ -. •' wry. 1. ., .S7 ♦ 'ti... "fJIpIMY Mile - 'Iq�t ..`'r ' �.. J .e rt�Ccw . • • is 0 875 1,750 3,500 5,250 7,000 - b;�� / fir:. S r ' �CJ55 ' ' �• A i Dw "• By: SITE LOCATION WGL FIGURE 20Erftrprise St. #7 -+ Raleigh. NC27607 GOLDSBORO HOUSING AUTHORITY - EEP #145 Date: June 2009 kS19)8411-- M39(fax) '� STREAM RESTORATION PROJECT Project: Wayne County, North Carolina 08 -001 Table 1. Site Restoration Structures and Objectives Goldsboro Housing Authority Stream/BMP Protect (EEP Protect Number 145) Project Restoration Stream 1 Footage Stationing BMP Mitigation BMP 1 5 Component or Level Approach or * Ratio Units Elements Comment Reach ID 133 25 Acreage "7" Y t. ,r ., >0 �` fin ;- i`S ` "1�N s i fl i5 t 5' .1� b tu+ s 6� .i r. A Npn rr a IR "` ''S��cr{�M�+k7� c 1 SW Totals 1558 3 +75 799 1 SW , UTBFD - Reachl^ EH P2 275 6 +50 2 0 138 Systemic change to dimension and planted buffer 8+25— Primarily stabilized via hardening with rip rap UTBFD - Reachl - P4 200 10 +25 0 0 0 above Oak Street due to need to protect adjacent housing UTBFD- Reach3^ EII P2/P3 275 10 +25 2 0 138 $1, Combination of P2/P3 Systemic dimensional 13 +00 enhancement with planted buffer Alignment change Systemic enhancement to UTBFD- Reach4 El P2 200 13 +00 1 5 133 dimension, modest enhancement to pattern and 15 +00 profile Obstacle avoidance and removal of pattern jeopardizing stability UTBFD- Reach5^ Ell P3 675 15+00- 21 +75 2 0 338 7 Systemic change to dimension and planted buffer d Alignment change Systemic enhancement to UTBFD-Reach6 Ell P2 133 21+75- 2 5 53 dimension, pattern and profile Obstacle avoidance 23 +08 �Nlll and removal of pattern jeopardizing stability Buffer is heavily constrained Large stormwater wetland intercepting storm flow BMP - - 1 09 acre At SW from 123 acre UT 498 pound per year Nitrogen confluence reduction calculated in sealed, permitted Mitigation Plan *Stationing is from bottom to top, * *SW = Stormwater Wetland, ^Given that the change to the channel dimension was systemic a buffer was installed and the Site included a large stormwater practice, a ration of 2 0 was assigned at baseline Com onent Summations Restoration Level Stream 1 Ratio Mitigation Units BMP Enhancement I 200 1 5 133tk� Enhancement II 1225 20 613 ; a° Enhancement II 133 25 53 "7" Y t. ,r ., >0 �` fin ;- i`S ` "1�N s i fl i5 t 5' .1� b tu+ s 6� .i r. A Npn rr a IR "` ''S��cr{�M�+k7� c 1 SW Totals 1558 799 1 SW Goldsboro Housing Authority (final) Axiom Environmental, Inc Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices Table 2. Project Activity and Reporting History Goldsboro Housing Authori StreamBMP Project EEP Project Number 145 Activity or Report Data Collection Completion Actual Completion or Delivery Restoration Plan -- June 2006 Construction Completion NA October 2008 BMP Planting NA November 2008 Streams ideBuffer Planting NA November 2008 Mitigation Plan / Asbuilt Year 0 Monitoring Baseline) October 2008 July 2009 Year 1 Annual Monitoring September 2009 October 2009 Year 2 Annual Monitoring September 2010 October 2010 Year 3 Annual Monitoring Au ust 2011 November 2011 Supplemental Planting (460 Plants) NA February 2012 Year 4 Annual Monitoring August 2012 October 2012 Invasive Species Management (Two Applications) NA Summer 2013 Year 5 Annual Monitoring September 2013 October 2013 Table 3. Project Contacts Table Goldsboro Housing Authority Stream/BM? Project (EEP Protect Number 145) Designer Dewberry & Davis, Inc 2301 Rexwoods Drive Raleigh, North Carolina 27607 Sheila Reeves (919) 8819939 Construction Contractor Appalachian Environmental Services 1165 W Main St Sylva, North Carolina 28779 Mickey Henson (828 ) 5861973 Planting Contractor Habitat Assessment and Restoration Program, Inc 9305D Monroe Rd Charlotte, North Carolina 28270 Alan Peoples (704) 9750881 Year 1 -5 (2009 -2013) Monitoring Axiom Environmental, Inc Performer 218 Snow Avenue Raleigh, NC 27603 Grant Lewis 919 215 -1693 Goldsboro Housing Authority (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices Table 4. Project Attribute Table Goldshoro Housing Authoritv Stream/BMP Protect (EEP Project Number 145) Project County Wayne County, North Carolina Physiographic Region Coastal Plain Ecoregion Southeastern Floodplams and Low Terraces River Bast n Neuse USGS 14digit HUC 03020201200020 NCDWQ Subbasm 030405 Within EEP Watershed Plan? No WRC Class Warm % of project easement fenced —45% Beaver activity observed during the design phase? No Drainage Area UTBFD at outfall 0 40 square miles UT at confluence with UTBFD 0 17 square miles Restored/Enhanced stream lengths (linear feet) 1558 Perennial or Intermittent Perennial Watershed type Developed Watershed distribution 40% Commercial 38% Residential 14% Industrial 10% Open Space Watershed impervious cover — 35 percent Stream Order UTBFD First and Second UT to UTBFD First Rosgen Classification of Asbuilt E5 /C5type Dominant Soil Types Norfolk, Johns, Lumbee, Wickham Reference Site ID UT to Little River (REF I) and unspecified stream in Moores Crossroads, NC (REF2) NCDWQ Classification Not classified, drains to Borden Field Ditch (275723, C,NSW) 303d listed9 No Upstream of a 303d listed segment? No Reasons for 303d listing or stressor Not Applicable Total acreage of easement -- 4 7 acres Total planted acreage as part of the restoration — 4 7 acres Rosgen classification of preexisting F5 /G5 Rosgen classification of asbuilt C5/E5 Valley type VIII Valley sloe 2646% Cowardm classification R3UB2 Trout waters designation No Species of concern, endangered, etc 7 No Goldsboro Housing Authority (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices APPENDIX B VISUAL ASSESSMENT DATA Figure 2 Current Conditions Plan View Figure 3 Asset Map Vegetation Monitoring Plot Photos Goldsboro Housing Authority (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices Monitoring Equipment Information Cross Section Northing Easting Notes XS 1 598743.3099 2296921.4503 left bank end pt XS 2 598750.7886 598996.6937 599006.2822 2296891.2973 2297021.8018 2296989.D7D6 right bank end pt left bank end pt right bank and pt Plot 3 XS 3 599223.8011 2297142.9717 left bank end pt 599241.4973 1 2297109.5917 right bank end pt VeeHatinn Pint lunrthi— o—i- Datum is provided in NAD 83 feet 0 100 200 400 600 Feet Area of Concem 1: Aggradation Area of Concem 2: Aggradation r r-~l I Cosystel I i Legend Easement Streams Pedestrian Bridges Cross Sections CVS Plots Stormwater Basin Japanese Honeysuckle Population Areas of Concern Crest Gauge own. By: FIGURE CURRENT CONDITIONS PLAN VIEW CLF /KRJ 218 Snow Avenue GOLDSBORO HOUSING AUTHORITY - EEP #145 Date: Ral eigh, NC 27603 Raleigh, (919) 215-1693 STREAM RESTORATION PROJECT Oct. 2013 Wayne County, North Carolina Project: 12- 004.08 Plot 1 1 598312.8536 1 2296142.2940 1 Ori in Point plot 2 598601.1500 2296831.1770 Origin Point Plot 3 599109.8848 2297032.3424 Origin Point Datum is provided in NAD 83 feet 0 100 200 400 600 Feet Area of Concem 1: Aggradation Area of Concem 2: Aggradation r r-~l I Cosystel I i Legend Easement Streams Pedestrian Bridges Cross Sections CVS Plots Stormwater Basin Japanese Honeysuckle Population Areas of Concern Crest Gauge own. By: FIGURE CURRENT CONDITIONS PLAN VIEW CLF /KRJ 218 Snow Avenue GOLDSBORO HOUSING AUTHORITY - EEP #145 Date: Ral eigh, NC 27603 Raleigh, (919) 215-1693 STREAM RESTORATION PROJECT Oct. 2013 Wayne County, North Carolina Project: 12- 004.08 T.bi, 1. Sit� W�urficnt Strucatum add Objectives (;.M,,b— Housing Atdhodt� Mre.-IBNIP P-Jett (EEP "-t Nmb,, 145) "'ol", Frota BMIP corupon R�A-Atoa - 11rd Appro-b or Rai. Co. rut R--h ID Acr.g� Unit. LTTBFD-Rewhi En M 275 3.75 - 6.30 2.0 13A Sy-ooc h.%, 1. di,.,,,.,im aod planuxi buff� 1,25 - Pro—ly.'tabd'� I i, 1-1clong 'Kh rip 'p U'rBFD-R—h2 P4 200 0A S.. d.� fo.�.=d to prouxt 4-1 IYTBFD-R--IL3 En F�A'3 275 1:425 - 1.41 119 syWou'do-1 3�01) th pla-1 bUffcr A 11 13401 d.=.—r, —d- oh--,�, lo p�u— d IIMFD R—h4 B 21K] 15+110 1 5 133 pmW —.1 fpat- icupoWizingstability t1rBFD-R—h5 ER P-1 675 7 2.0 3-M s'-'ri, �h.�g� to don.si- and pi..WA hrfif�' .1+75 Alill.1-1 11.ru. sy—n. -h—r-9 KT- 21+75 - di—ird.n. pauct. and profit, Ob�W. _ d- EfI P, 133 UrBFD-R—h6 23+09 rid .,—,J of pan... jeop.diria. -1olity. Balk, i0-,i1--oArA BMP sw fro.. 12 1 1 A&Z' "'m Summations (o RtAmadote Level .1.. 1117 Ratio "floodon ullibi Enhancewnt 1 200 1.5 1 133 Enhancement 11 1225 2.0 613 Enhancewnt H 133 2-5 1 53 1558 749 S a 46 77 %Pl% r x, W., Z W Legend A Easement Boundary 71 BIVIP ".4 ",UTBFD-Reachl 11W -Reach2 UTBFD 1111111 d1W0UTBFD-Reach3 UTBFD-Reach4 UTBFD-Reach5 FIT 0 100 200 400 600 UTBFD-Reach6 Feet ASSET MAP Dwn. By: KRJ FIGURE 218 Snow Avenue 5 Date: GOLDSBORO HOUSING AUTHORITY - EEP #14 Dec 2012 Raleigh. NC 27603 (919) 215-1693 STREAM RESTORATION PROJECT Project: 3 Wayne County, North Carolina 12-004.08 A— EI-I.—M. W'.. I I -- -- I —i Goldsboro Housing Authority Year 5 (2013) Annual Monitoring Vegetation Plot Photos (taken September 17, 2013) Goldsboro Housing Authority (final) EEP Project Number 145 Wayne County, North Carolina Axions Environmental, Inc. Monitoring Year 5 of 5 (2013) December 2013 Appendices APPENDIX C VEGETATION ASSESSMENT DATA Table 5 Vegetation Plot Mitigation Success Summary CVS Summary Data Tables Table 6 Vegetation Metadata Table Table 7 Total and Planted Stems by Plot and Species Goldsboro Housing Authority (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne Count}, North Carolina Appendices Table 5. Vegetation Plot Mitigation Success Summary Table Goldsboro Housine Authoritv StreamBMP Protect (EEP Protect Number 145) Vegetation Plot ID Vegetation Survival Threshold Met? Tract Mean 1 Yes 100% 2 Yes 3 Yes Goldsboro Housing Authority (final) Axiom Environmental, Inc Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices Table 6. Vegetation Metadata Table Goldsboro Housing Authority StreamBMP Protect (EEP Protect Number 145) Report Prepared By Corn Faquin Date Prepared 9/26/2013 14 23 database name Axiom -EEP- 2013 -A -v2 3 1 -FINAL mdb database location S \CVS database \2013 computer name KEENAN -PC file size 43888640 DESCRIPTION OF WORKSHEETS IN THIS DOCUMENT ------------ Metadata Description of database file, the report worksheets, and a summary of project(s) and project data Prof, planted Each project is listed with its PLANTED stems per acre, for each year This excludes live stakes Proj, total stems Each project is listed with its TOTAL stems per acre, for each year This includes live stakes, all planted stems, and all natural /volunteer stems Plots List of plots surveyed with location and summary data (live stems, dead stems, missing, etc ) Vigor Frequency distribution of vigor classes for stems for all plots Vigor by Spp Frequency distribution of vigor classes listed by species Damage List of most frequent damage classes with number of occurrences and percent of total stems impacted by each Damage by Spp Damage values tallied by type for each species Damage by Plot Damage values tallied by type for each plot ALL Stems by Plot and spp A matrix of the count of PLANTED living stems of each species for each plot, dead and missing stems are excluded PROJECT SUMMARY------------------------------------- Project Code 145 project Name Goldsboro Housing Authority Description Stream Restoration River Basin Neuse length(ft) stream -to -edge width (ft) area (sq m) Required Plots (calculated) Sampled Plots 3 Goldsboro Housing Authority (final) EEP Project Number 145 Wayne County, North Carolina Axiom Environmental, Inc Monitoring Year 5 of 5 (2013) December 2013 Appendices Table 7. Total and Planted Stems by Plot and Species EEP Project Code 145. Project Name: Goldsboro Housing Authority Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% PnoLS = Planted excluding livestakes P -all = Planting including livestakes T = All planted and natural recruits including livestakes T includes natural recruits Current Plot Data (MY5 2013) Annual Means Scientific Name Common Name Species Type E145 -AXE -0001 E145 -AXE -0002 E145 -AXE -0003 MYS (2013) MY4 (2012) MY3 (2011) MY2 (2010) MYl (2009) MYO (2009) PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T PnoLS P -all T Acer rubrum red maple Tree 1 1 1 Baccharis halimifolia eastern baccharis Shrub 4 6 10 8 8 7 Betula nigra river birch Tree 22 22 22 1 1 1 1 1 1 24 24 24 25 25 25 22 22 35 22 22 45 14 14 32 16 16 16 Celtis laevigata sugarberry Tree 1 1 1 2 2 3 3 3 4 3 3 3 1 Fraxinus pennsylvanica green ash Tree 1 1 1 1 1 1 2 2 2 2 2 2 uniperus virginiana eastern redcedar Tree 5 1 6 1 3 Ligustrum sinense Chinese privet Exotic 1 1 Liquidambar styraciflua sweetgum Tree 6 14 9 29 18 30 9 24 9 Morelia cerifera wax myrtle shrub 1 1 1 1 1 1 1 1 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 4 4 4 Pinus taeda loblolly pine Tree 12 12 8 6 2 Platanus occidentalis American sycamore Tree 3 3 3 8 8 8 11 11 11 12 12 12 13 13 13 15 15 15 16 16 16 18 18 18 Prunus serotina black cherry Tree 2 18 4 24 13 50 29 62 Quercus oak Tree 1 Quercus coccinea scarlet oak Tree 1 1 1 1 1 1 Quercus phellos willow oak Tree 1 3 3 3 Quercus rubra northern red oak Tree 1 1 1 1 1 1 1 1 1 Salix willow Shrub or Tree 3 Salix nigra black willow Tree 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 5 Sambucus canadensis Common Elderberry Shrub 4 4 Stem count size (ares) size (ACRES) Species count Stems per ACRE 26 26 46 12 12 54 10 10 31 48 48 131 49 49 98 41 41 155 43 43 114 36 36 141 44 48 60 1 1 1 3 3 3 3 3 3 0.02 0.02 0.02 0.07 0.07 0.07 0.07 0.07 0.07 5 5 7 11 3 3 8 8 8 14 7 7 1L553.11 11 4 4 9 4 4 7 5 6 8 1052 1052 485.6 218 5 404.7 404.7 1255 647.5 647.5 1767 661 661 1322091 E553.11 580 580 1538 485.6 485.6 1902 593.5 647.5 809.4 Color for Density Exceeds requirements by 10% Exceeds requirements, but by less than 10% Fails to meet requirements, by less than 10% Fails to meet requirements by more than 10% PnoLS = Planted excluding livestakes P -all = Planting including livestakes T = All planted and natural recruits including livestakes T includes natural recruits APPENDIX D STREAM SURVEY DATA Cross - section Plots Goldsboro Housing Authority (final) Axiom EnWronmenta4 Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices River Basin: Neuse Watershed: Goldsboro Housing XS ID XS - 1. Riffle Drainage Area (sq mi : 0.2 Date: 2/22/2013 held Crew: Perkinson, Jemi an Station Elevation 0.0 76.7 3.2 76.4 7.4 75.7 9.9 75.6 11.5 75.4 12.9 75.1 13.7 74.3 15.0 74.0 15.8 73.8 16.6 73.7 18.1 74.1 19.8 74.5 21.3 74.9 23.4 75.4 25.8 75.7 28.2 76.1 31.2 76.5 SUMMARY DATA Banldull Elevation: 75.1 Banldull Cross - Sectional Area: 7.5 Bankfull Width: 9.3 Flood Prone Area Elevation: 76.5 Flood Prone Width: 25.0 Max Depth at Bankfull: 1.4 Mean Depth at Bankfull: 0.8 W / D Ratio: 11.5 Entrenchment Ratio: 2.7 Bank Height Ratio: 1.0 78 77 d 76 r 75 W 74 73 Stream Type I E/C Neuse River Basin, Goldsboro Housing, XS - 1, Riffle Bankfull - - - Flood Prone Area • MY- 002007 -MY- 012009 -+ - MY- 022010 --1K -• MY -03 2011 MY- 042012 MY -05 2013 ---------------------- - - ---------- - - - - -, 0 10 20 30 Station (feet) a / t t } •'i "s' x .5 w Y Stream Type E Neuse River Basin, Goldsboro Housing , XS - 2, Riffle 79 78 - - - Flood r 77 _ _ " Flood Prone Area ZZ • MY- 002007 7: O� - ________ -__ � 76 �-MY- 012009 �_�___________ � •-- -- ------ - -- �______..-- ----- W - �- MY -02 2010 r 75 -•- MY -03 2011 YR -04 2012 MY -05 2013 74 0 l0 20 30 Station (feet) River Basin: Neuse Watershed: • Goldsboro Housing XS ID XS - 2, Riffle Drainage Area s mi : 0.2 Date: 2/22/2013 Field Crew: Perkinson, Jernigan Station Elevation 0.0 77.9 4.8 77.8 6.8 77.4 8.3 77.1 9.5 a / t t } •'i "s' x .5 w Y Stream Type E Neuse River Basin, Goldsboro Housing , XS - 2, Riffle 79 78 - - - Flood r 77 _ _ " Flood Prone Area ZZ • MY- 002007 7: O� - ________ -__ � 76 �-MY- 012009 �_�___________ � •-- -- ------ - -- �______..-- ----- W - �- MY -02 2010 r 75 -•- MY -03 2011 YR -04 2012 MY -05 2013 74 0 l0 20 30 Station (feet) River Basin: Neuse Watershed: • Goldsboro Housing XS ID XS - 2, Riffle Drainage Area s mi : 0.2 Date: 2/22/2013 Field Crew: Perkinson, Jernigan Station Elevation 0.0 77.9 4.8 77.8 6.8 77.4 8.3 77.1 9.5 76.8 10.9 76.4 12.4 76.3 13.2 76.1 14.0 75.5 15.1 75.3 16.4 75.5 18.2 75.4 18.7 75.5 19.6 76.4 31.1 76.5 22.4 76.9 24.3 77.6 27.1 77.9 32.1 77.8 34.7 77.9 SUMMARY DATA Banldull Elevation: 76.1 Banldull Cross - Sectional Area: 3.4 Banldull Width: 6.0 Flood Prone Area Elevation: 76.8 Flood Prone Width: 13.0 Max Depth at Bankfull: 0.7 Mean Depth at Banldoll: 0.6 W / D Ratio: 10.6 Entrenchment Ratio: 2.2 Bank Height Ratio: 1.0 River Basin: Neuse Watershed: Goldsboro Housing XS ID XS - 3. Riffle Drainage Area (sq mi : 0.2 Date: 2/22/2013 Field Crew: Perkinson,Jernigan Station Elevation 9.9 77.3 14.8 77.5 17.3 77.3 19.9 77.2 21.6 77.2 22.9 77.0 24.9 77.1 25.7 76.9 26.2 76.7 26.9 76.2 27.8 76.1 28.7 75.9 29.5 75.9 29.6 76.0 30.1 76.2 30.8 76.8 31.8 77.0 33.6 77.1 36.2 77.5 39.8 77.6 44.2 77.9 48.2 78.0 • MY- 002007 �- MY- 012009 �j -- �--MY- 022010 -- MY -03 2011 76 SUMMARY DATA Bankfull Elevation: 77.0 Bankfull Cross - Sectional Area: 4.1 Bankfull Width: 6.6 Flood Prone Area Elevation: 78.1 Flood Prone Width: 50.0 Max Depth at Bankfull: 1.1 Mean Depth at Bankfoll: 0.6 W / D Ratio: 10.6 Entrenchment Ratio: 7.6 Bank Height Ratio: 1.0 T Stream Type C/E r A. , Neuse River Basin, Goldsboro Housing , XS - 3, Riffle 80 79 - - - - - -- Bankfull 78 - - - - Flood Prone Area ------ - - -- it m • MY- 002007 �- MY- 012009 �j -- �--MY- 022010 -- MY -03 2011 76 MY-042012 - - -. yw. _ MY -05 2013 • 75 0 10 20 30 40 50 Station (feet) River Basin: Neuse Watershed: Goldsboro Housing XS ID XS - 4, Riffle Drainage Area (sq mi : 0.2 Date: 2/22/2013 Field Crew. Perkinson,Jerni an Station Elevation -0.2 72.9 2.5 72.0 4.9 71.5 8.9 71.3 13.0 71.1 14.4 70.9 15.2 70.1 15.8 69.8 16.9 69.7 18.0 69.8 18.8 69.8 19.6 70.7 21.1 71.3 22.5 71.3 24.1 71.3 26.9 71.8 28.8 72.3 30.0 72.6 32.6 74.0 34.6 74.9 SUMMARY DATA Banldull Elevation: 70.8 BmUull Cross - Sectional Area: 4.3 BanUall Width: 5.5 Flood Prone Area Elevation: 71.9 Flood Prone Width: 23.0 Max Depth at Bankfull: 1.1 Mean Depth at Banldull: 0.8 W / D Ratio: 7.0 Entrenchment Ratio: 4.2 Bank Height Ratio: 1.0 Stream Type I CIE Neuse River Basin, Goldsboro Housing, XS - 4, Riffle Note: Cross Section Right Bank End Point Was Not Found During Year 4 and 5 Monitoring. 74 73 h ---- Bankfull 72 - - -- -- - -Flood Prone Area \\� • MY- 002007 MY -01 2009 71 - - -- w ---- --- -- ----------- MY- 022010 - - -- - 4H�r. -a- MY-03 2011 70 MY-042012 MY -05 2013 69 0 ]0 20 30 Station (feet) APPENDIX E HYDROLOGIC DATA Table 8 Venfication of Bankfull Events Goldsboro Housmg Authonty (final) Axiom Environmental, Inc. Momtonng Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carohna Appendices Table 8. Verification of Bankfull Events CnM oL.nMn U--;nn A.. +hnri+v C +rnum/RMP PrniPrf IFF.P Prnierf Numher 1451 Date of Data _ Date of Occurrence Method Photo (if Collection available July 11, 2009 Between May 5 -11, Total of 4 74 inches of ram reported to fall over 7 days -- 2009 Overbank resulting from a total of 4 47 inches* of rain November 12, 2009 November 12, 2009 reported to fall over 3 days as the result of Tropical Storm -- Ida Visual observations of overbank event including crest gauge, wrack lines, and wrack in saplings from a 1 95 -inch* rainfall February 9, 2010 February 5, 2010 event on February 5, 2009 that occurred after numerous 1 -2 rainfall events within the 3 weeks prior to that date that totaled 4 43 inches September 28, 2010 September 26 -27, Rainfall data totaling 3 99 inches over a period of two days -- 2010 Visual observations of overbank event including crest gauge, wrack lines, and wrack in saplings from a 2 58 -inch* rainfall 3 February 2, 2011 February 2, 2011 event on February 2, 2011 that occurred after a 1 89 -inch rainfall event the week before Visual observations of overbank event including crest gauge, wrack lines, and wrack in saplings from a 2 25 -inch* rainfall July 21, 2011 April 16, 2011 event on April 16, 2011 that occurred after a total of 2 25 -- inches of rain that fell the ten days before Visual observations of stream overbanking as a result from 4 August 31, 2011 August 25, 2011 6 12 -mch* rainfall from Hurricane Irene August 23, 2012 July 24, 2012 Total of 4 52 inches* of rain reported to fall over 5 days -- Total of 8 inches ** of rain reported to fall between June 22- October 2, 2013 June 26, 2013 Jul 2 2013 October 2, 2013 September 22, 2013 Total of 2 5 inches ** of rain reported to fall over 2 da s -- * Reported at the Goldsboro Airport (Weather Underground 2012) * *Reported in Goldsboro, NC Station KNCGOLDS7 (Weather Underground 2013) Goldsboro Housing Authority (final) Axiom Enwronmental, Inc- Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices Goldsboro Housing Authority (final) Axiom Enilronmental, Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices APPENDIX F BMP ASSESSMENT DATA Fixed Photo Stations Goldsboro Housing Authority (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices Goldsboro Housing Authority StreamBMP Project (EEP Project Number 145) Fixed - Station Photographs Taken September 17, 2013 B�u�PPhotoPoint1 B'���P Phato Point 2 a. A, w i Goldsboro Housing Authority (final) EEP Project Number 145 Wayne County, North Carolina Axiom Emironmental, Inc. BPP Monitoring Year 5 of 5 (2013) December 2013 Appendices a Goldsboro Housing Authority (final) EEP Project Number 145 Wayne County, North Carolina APPENDIX G SUPPLEMENTAL PLANTING Axiom Environmental, Inc Monitoring Year 5 of 5 (2013) December 2013 Appendices NOTES: Vehicle access to staging areas from West Oak Steet. Gator /4- wheeler access from staging area to project areaa and planting areas. Project area NOT fenced. Gator access to planting areas along edge of project area. Legend ® Site Entry Points Staging Area Site Access Planting_ Zones_ EAST Planting—EAST—easements JO J O 0 100 200 400 Feet �9- N Ak Supplemental Planting SITE ACCESS Goldsboro Housing - EEP #145 APPENDIX H ADDITIONAL SITE PHOTOGRAPHS Preconstruction Site Photographs AsbwIt Site Photographs Goldsboro Housing Authority (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices Preconstruction Site Photographs Z c' �7 t _ y ...r,,. _ 'r Goldsboro Housing Authority (final) Axiom Environmental, Inc. Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices Asbuilt Site Photographs r t Goldsboro Housing Authority (final) Axiom Environmental, Inc Monitoring Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices APPENDIX I ADDITIONAL SITE MAPPING Soils Map from 2006 Restoration Plan Goldsboro Housing Authority (final) Axiom Environmental, Inc. Momtonng Year 5 of 5 (2013) EEP Project Number 145 December 2013 Wayne County, North Carolina Appendices 1� I t