Loading...
HomeMy WebLinkAbout20201505 Ver 1_B-5728 Cover Letter_20220106 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER J. ERIC BOYETTE GOVERNOR SECRETARY Mailing Address: NC DEPARTMENT OF TRANSPORTATION ENVIRONMENTAL ANALYSIS UNIT 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 Telephone: (919) 707-6000 Customer Service: 1-877-368-4968 Website: www.ncdot.gov Location: 1000 BIRCH RIDGE DRIVE RALEIGH NC 27610 January 6, 2022 U.S. Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 ATTN: Mr. David Bailey NCDOT Regulatory Coordinator Subject: Application for Section 404 Regional General Permit 50, and Section 401 Water Quality Certification for the Proposed Replacement of Bridge 112 on NC 87 over Reedy Fork Creek in Alamance County, Division 7, TIP No. B-5728, Debit $570 from WBS 45684.1.1. Dear Sir: The North Carolina Department of Transportation (NCDOT) proposes to replace bridge number 112 on NC 87 over Reedy Fork Creek with a new bridge in the same location. Traffic will utilize an on-site Detour bridge during construction. As a result of replacing the existing bridge, there will be 66 linear feet of stream bank stabilization, and 0.26 acre (134 linear feet) of reported temporary stream impacts from causeways needed for removal of the existing bridge and construction of the new one. There are additional temporary impacts associated with the causeways not reported, as they overlap permanent bank stabilization impacts. There will be 24,312 square feet of mitigable impacts to the Jordan River Buffer. Mitigation has been acquired from NCDMS for the mitigable buffer impacts from this project. Please see enclosed copies of the Pre-Construction Notification (PCN), which includes the following attachments: pre-filing notification documentation, an NCDWR "Onsite Determination for Applicability to the Mitigation Rules (15A NCAC 2H .0506) and Onsite Determination for Applicability to the Jordan Buffer Rules (15A NCAC 02B .0267)" letter, dated September 19, 2018, Historic Architecture Form, Archaeological Form, Tribal Letters (Monacan Indian Nation and Catawba), Stormwater Management Plan, Permit Drawings and Buffer Drawings. A Minimum Criteria Determination Checklist (MCDC) was completed in November 2020 and distributed shortly thereafter. This project calls for a letting date of April 19, 2022, and a review date of March 1, 2022. A copy of this permit application and its distribution list will be posted on the NCDOT Website at: https://xfer.services.ncdot.gov/pdea/PermApps/. If you have any questions or need additional information, please contact Bill Barrett at wabarrett@ncdot.gov or (919) 707-6103. Sincerely, Philip S. Harris III, P.E., C.P.M. Environmental Analysis Unit Head ec: NCDOT Permit Application Standard Distribution List