Loading...
HomeMy WebLinkAboutNCC203655_Notice of Termination_20220106Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 1/6/2022 1:59:43 PM (NOT Submittal) Approve by Morman, Alaina 1/7/2022 4:49:43 PM (NOT Request Review - NCC203655) • The task was assigned to Morman, Alaina. The due date is: January 11, 2022 5:00 PM 1/6/2022 1:59 PM NORTH CAROLINA Rrf OmFkm&tral Qualrly Certificate of NCC203655 Coverage (COC) No.* Enter the Certificate of Coverage Number 2020 Annual Fee Status 2021 Annual Fee Status PAID May be blank (if not yet billed). 2022 Annual Fee May be blank (if not yet billed). Status Information associated with this permit Project Name Camden Solar Farm Address 345 NC Hwy 343, Camden, NC County Camden Latitude 36.3089 Longitude -76.1403 Permittee Listed Worley Field Services Legally Responsible Alfred Wills III Individual NC Reference No. NCG01-2020-3655 E&SC Plan ID Camde-2020-009 Original NOI Tracking 30188 No. Date COC Issued 8/21/2020 Prior Rescission Date Date populates only if COC was already rescinded at time of submittal. Reason for Rescission/Termination Request: Reason for • Project Closed -Out Termination of Sale (Another Owner/Operator obtained new COC) Coverage* Mistake or Invalid Coverage Other Additional More information about the basis of this request, if needed. Explanation The project is complete. James Edwards from the NC DEQ inspected the completed project site on January 4, 2022 and approved the site for permit close-out. He submitted the attached report confirming the permits can be closed out and no additional self -monitoring or inspections are required. Supporting Upload Supporting Documentation if applicable. Documentation Must be PDF format Project Close-out Information: Final Close-out 1/4/2022 Inspection Approval Project Close-out 211228 CAMDEN SOLAR CAMDE-2020-009 Approval 35.91 KB PRINT.pdf Documentation CO 113 Sand Hills Rd.pdf 88.65KB Must be PDF format North Carolina General Statute 143-215.6B (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). * I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. "This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Alfred Wills III Title* Vice President of Power and New Energy Organization * Worley Field Services Date * 01 /06/2022 Email for kirk.neubauer@worley.com Confirmation * Contact Telephone* 8145712121 NOT Certification NCG01-eNOT-Certification-Form-20210514-DEMLR- Form 961.98KB SW (NCG01).pdf Must be PDF Format Is this COC Already Ensure this COC has not been rescinded since submittal! Rescinded? Additional Email CC'd on Notification Emails (Optional) Wayne.watson@worley.com Original Permittee CC'd on Notification Emails Email trey.wills@worley.com Original Site Contact CC'd on Notificaiton Emails Email kirk.neubauer@worley.com