HomeMy WebLinkAbout20210306 Ver 2_DWR Comment Summary_20220107Summary of Comments on Draft BPDP_DWR edits.pdf
Page: 2
Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:42:59 PM
Project # is 2021-0306v2
Page: 4
*)Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:43:42 PM
add the DMS project's DWR ID# which is 2021-03060
Page: 10
*)Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:44:43 PM
photos pre -date site viability assessment. include more up-to-date photos. drone footage is acceptable as along as the pictures are
timestamped
Page: 14
QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:47:00 PM
there is a small portion along the ephemeral reach along DJ4 that is less than 50' wide and therefore isn't viable for nutrient offset credit.
add language that speaks to this and adjust the crediting accordingly updating all figures where necessary as well
Page: 16
Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:48:10 PM
Commit to ensuring that stem species will be well mixed before planting to ensure diversity of bare roots across the planted area.
Number: 2 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:48:53 PM
Providers should take measures to ensure that plots are diverse (have 4 species represented as much as possible) and where a species
does not represent more than 50% of the plot. All plots need to be representative of the planted diversity and density surrounding the
plot and will be evaluated by DWR during the onsite AsBuilt Walkthru to ensure these criteria are met.
All DWR comments provided on planting plan & monitoring are being provided under the following Rule reference 15A NCAC 02B .0295
(n)(2-4).
Page: 17
r Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:55:02 PM
where EBX feels it appropriate, add language regarding the requirement to provide notification to DWR within 30 days post site completion per
the UMBI
r Number: 2 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:51:42 PM
add language noting that these boundaries must be clearly marked prior to the DWR asbuilt site visit for the Task 2 milestone.
Page: 20
r—Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:50:23 PM
Since this isn't quite a definite option at the BPDP review stage, please add language that speaks to having a backup if DEQ ends up not being
a viable option.
Number: 2 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:49:34 PM
add language consistent with the UMBI language that the long term steward will be chosen prior to the year 4 monitoring period.
Page: 21
r Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:53:25 PM
insert the following: In accordance with the MBI, Any Credit conversions must be calculated using the guidance provided in the
Clarified Procedures for Calculating Buffer Mitigation Credits and Nutrient Offset Credits letter issued by the DWR,
Number: 2 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:57:01 PM
this section may need to be modified after adjusting the measurements along the Ephemeral channels.
4 Number: 3 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 2:55:37 PM
since it's been decided that this site will have an UMBI instead of a MBI, please add a credit release schedule specific for this site.
Page: 22
Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 3:06:44 PM
Ephemeral credits that are chosen for Nutrient Offset in the BPDP cannot be converted to Buffer credit in the future due to the maximum
allowable credit for buffers on ephemerals in the rule.
Where text in the BPDP conflicts with the numbers tallied in this table after corrections are made, correct accordingly.
�--nj Number: 2 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 3:05:08 PM
include a row for the area <50' and check Yes for BUFFER and No for NUTRIENT
QNumber: 3 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 3:04:49 PM
once measurements are corrected as indicated on figures, update the table accordingly.
Page: 30
Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 3:00:21 PM
the measurements should be taken perpendicular and landward from the top of bank since thats the policy for measuring credit potential
except under special circumstances where there may be utilities or other site constraints.
Modify the width measurements adjacent to DR, DJ6, DJ4, DJS, DJ3 and DJ2 to be perpendicular and landward, not shown as a radias from the
Origin points. Therefore, this will result in an increase in ft2 on Ephemeral channels and a decrease in ft2 along the I/P streams where it applies.
Adjust Mit Plan text, Figures and corresponding Tables (including Project Credit Table) to reflect this change throughout the Plan.
�--_Number: 2 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 3:02:42 PM
for the Enhancement & Preservation, add "for Buffer Credits"
Correct other figures where this comment applies
Page: 32
QNumber: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 3:03:20 PM
depict the DIMS easement
Number: 2 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 3:03:08 PM
location of widths less than 50'
,*— Number: 3 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 3:00:49 PM
these measurements are depicted correctly
Page: 33
— Number: 1 Author: kymerritt Subject: Sticky Note Date: 1/7/2022 3:01:14 PM
address measurement issue noted in previous Comments