INSPECTION REPORT
Attached is a copy •o of the inspection report prepared following .an onsite in of this
project. This report is intended to inform you of the proj ect's compliance with the North Carolina
Sedimentation Pollution. Control Act of 1973 and the NPDES Stormwater Discharge Permit, Note
that effective August 1, 2013 the NPDES and State Stormwater programs were transferred to our
Division. Please note that the attached inspection report has been expanded to include the NPDES
compliance items including reporting.and.rain gauge requirements. .
Please review this report carefully as it nay contain corrective actions needed or comments,
vcwhieh will assist you in meeting the required performance standards • of the Act and the NPDES .
Stormwater permit conditions. If you heed additional informatioripertaining to the North Carolina
Sedimentation Pollution Control Act and the NPDES Stormwater `program, refer to the Noxh
Carolina Division of Energy, Mineral, and Land Resources website at:
http://poital.nbdejir..org/wpbAx/
It is our desire that any and all problems be discussed and resolved at the earliest possible
time. Please contact me at (828)-296-4500 if you have any questions.
Sincerely,
Mack Granger
Environmental :Specialist
DENorth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
NORNCPROUNC
oaparoicentmrm�ronmaM,it Rualily 828.296.4500
Division of Energy, Mineral and Land Resources
County:Burke Project: Soccer Complex River basin: Catawba
Person financially responsible: City of Morganton - Sally Sandy, City Manager Project #BURKE-2020-009
Address: City of Morganton, PO Box 3448, Morganton NC Case #_
1. Project location: Greenlee Ford Road, Morganton
Pictures: No: ❑ Yes: ❑✓ Video: ❑ Digital: ❑✓
2. Weather and soil conditions: Sunny, Dry First inspection: Yes: ❑
3.a. Has NCGO1 Certificate of Coverage been issued at time of inspection? Yes: ✓❑ No: ❑
3.b. NCGO1 Certificate of Coverage onsite? Yes: ❑✓ No: ❑ Not Applicable: ❑
4. Is site currently under notice of violation? Yes: ❑ No: ✓❑
5. Is the site in compliance with S.P.C.A. and rules? Yes: ❑✓ No: ❑ If no, check violations below:
6. Violations:
❑ a. No approved plan, G.S. 113A-57 (4) and 15A N.C.A.0 4B.0107(c)
❑ b. Failure to follow approved plan, G.S. 113A-57(5)
❑ e. Failure to submit revised plan, G.S. 113A-54.1(b) and
15A N.C.A.C. 413.0118(a)
❑ d. Failure to provide adequate groundcover, G.S. 113A-57(3) and
15A N.C.A.C. 413.0107(b)
❑ e. Insufficient measures to retain sediment on site; G.S. 113A-57(3)
❑ f. Failure to take measures to protect property, 15A N.C.A.C. 413.0105
No: ❑✓
®g. Inadequate buffer zone, G.S. 113A-57(1)
h. Graded slopes and fills too steep,
G.S. 113A-57(2) or 15A N.C.A.C. 4B.0124(e)
❑ i. Unprotected exposed slopes, G.S. I3A-57(2)
❑ j. Failure to install and maintain measures,
15A N.C.A.C. 413.0113
❑ k. Failure to self -inspect G.S. 113A-54.1(e) and
15A N.C.A.C. 4B.0131
❑ 1. Other (describe)
7. Is the site in compliance with NPDES Permit NCG 010000? Yes: ❑✓ No: ❑ Not Applicable: ❑ If no, check violations below:
❑ in. Discharge without a permit, G.S. 143-215.1(a) and
15A N.C.A.C. 02H .0126
❑ n. Failure to develop or adhere to approved plan,
NCG 010000, Part I
❑ o. Failure to manage construction site pollutants, NCG 010000 Part II, F
❑ p. Failure to provide ground stabilization, NCG 010000 Part tI, E
❑ q. Failure to meet self -inspection, reporting and record -keeping
requirements, NCG 010000, Part III
❑ r. Failure to install and maintain BMP's,
NCG 010000 Part If, G.2-3
❑ s. Failure to dewater sediment basin from surface,
NCG 010000, Part II, 13.8 or GA
❑ t. Bypass of stormwater control facilities,
NCG 010000, Part 1I, G.5-6
❑ u. Other (describe)
S. Site out of compliance with NOV deadline? Yes`. ❑ No: ❑ Not Applicable:❑✓
9. Has sedimentation damage occurred since last inspection or at I51 inspection? Yes: ❑ If yes, where? (check all that apply) No: ❑✓
Lake/natural watercourse on the tract: ❑ Lake/natural watercourse off the tract: ❑ Other property: ❑
Description:
Stormwater Discharge Outfall with sediment loss:
Degree of damage: slight: ❑ moderate: ❑ severe: ❑
10. Contact made with (name): Title:
Inspection report given: ❑ or sent: ❑✓ to person financially responsible. Date given/sent: 12/20/21
11. Corrective actions needed:
-Inspection performed per request for closeout. No corrective actions were noted and the site is
stabilized. Site is approved for permit closeout. Please file a Notice of Termination by visiting deq.nc.gov/NCGOI
Report by: Mack Granger
Date of inspection: 12/20/21
ec:
Others present:
Time arriving on site: 1:00 PM
Time leaving site: 1:15 PM
Page 1 of 3
Revised 06222020
County :Burke
Division of Energy, Mineral and Land Resources
Project: Soccer Complex Project # BURKE-2020-009
11. Corrective actions needed (continued)
❑ Submit an adequate sedimentation and erosion control plan for approval, covering all areas disturbed or to be disturbed.
❑ Install all sedimentation and erosion control measures as shown on the approved plan.
❑ Submit a revised sedimentation and erosion control plan for approval for the following areas:
❑ Provide adequate permanent ground cover on all areas where development has been completed according to the time limits in the
approved plan, including the following areas:
❑ Install erosion and sediment control devices sufficient to retain sediment on the tract at the following areas:
❑ Install temporary sediment traps or basins and associated diversions as shown on the approved plan, including the following locations:
❑ Install adequate drop inlet protection as shown on the approved plan; including the following locations:
❑ Provide an adequate stream buffer zone of sufficient width to confine visible sedimentation within the 25 % of the buffer nearer the land
disturbance using natural or artificial means (minimum 25-foot width in Trout Waters) including the following areas:
❑ Reduce the angle of graded slopes to an angle on which vegetative ground cover may be established including the following locations:
❑ For disturbed areas less than one acre, provide adequate temporary or permanent ground cover on all graded slopes where rough or fine
grading has been completed for 21 calendar days, including the following locations:
❑ Maintain all sedimentation and erosion control measures as specified in the approved plan and as required to prevent sedimentation
damage including the following locations
❑ Inspect site and document self -inspections during or after each phase of the plan.
❑ Obtain NCG010000 Certificate of Coverage as required.
❑ Properly handle concrete to avoid contact with surface waters, wetlands or buffers and prevent discharge from site.
❑ Relocate soil stockpiles at least 50 feet away from storm drain inlets or surface waters.
❑ Provide adequate temporary or permanent ground cover on areas where land -disturbing activity has ceased in 7 or 14 days according to
NCG 01000 permit conditions at the following
❑ Provide and dewater sediment basins with a drainage area of one acre or greater with a skimmer or'flashboard riser.
❑ Route the flow of stormwater from the following location(s) into a control facility or measure:
❑ Inspect all erosion and sedimentation control measures and storm discharge outfalls at least weekly and within 24 hours of a rainfall
event of 1.0 inch or greater and complete self -monitoring reports.
❑ Maintain a rain gauge in good working order and record daily rainfall amounts.
12. Comments:
Report by: Mack Granger
Date of inspection: 12/20/21 Page 2 of 3
Revised 06222020
County : Burke Project:
Division of Energy, Mineral and Land Resources
Soccer Complex Project # BURKE-2020-009
Check only one box, if closing out project.
Permanent ground cover sufficient to restrain erosion has been established. No additional self -inspection or monitoring is required. Project is
released and coverage under the NPDES General Stormwater Permit for Construction Activities is terminated.
nPermanent ground cover sufficient to restrain erosion has been established. No additional self -inspection or monitoring is required and the
project is released under the SPCA. If this project has a Certificate of Coverage (COC) under the NCG01 permit, then complete the electronic
Notice of Termination (eNOT) form at deq.ncgov/NCG01.
Report by: Mack Granger
Date of inspection: 12/20/21 Page 3 of 3
Revised 06222020