HomeMy WebLinkAbout20200750 Ver 3_Deal Water Feature_20220104Full Pond/
Normal Water Level
M � � � �
Shoreline
km
Lake
(At Full Pond/Normal Water Level)
UJa�er �ea�vr�
f,-IboI
<- - ,ao' S�-'
si+e.?i `axe �C C UJc�ke.\r (a.l Teddy r\stalled
Please approximately sketch the following information on this plan, length of shoreline
(provide dimensions for each item, such as 10 ft x 100 ft)*:
I. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation
I Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation
6. Location of construction access corridors
Wader VeaAvCE-
Zone..1... 30' � ony X Lo � ode
Z(,
lab s4 C 14 3 ra3�10) = 540 s�
kao5� C I : 1.5 (C.VIa) = 18o SF
uja1K WqL tJ)45 rev C
iaU5k� Cx-P�r0\J
FORM: SSGP 10-2013 J
J 0iy I l�, 2)Dz)
l ao s�-
Page 3 of 3
EBX Buffer Mitigation Banks
Statement of Availability December 29, 2021
NC Division of Water Resources
Alan D. Johnson
610 East Center Ave., Suite 301
Mooresville, NC 28115
Re Project: Deal Buffer
This document confirms that James Deal (Applicant) for the Deal Buffer (Project) has expressed an
interest to utilize 720 Square Feet of Riparian Buffer Mitigation Credits from the following bank,
RES Dogtown Buffer Mitigation Bank. The specific bank site that may be debited Dogtown, that is
located in the Catawba River watershed, specifically RUC 03050101. As the official Bank Sponsor, EBX,
attests to the fact that mitigation is available for reservation at this time.
These mitigation credits are not considered secured, and consequently are eligible to be used for alternate
purposes by the Bank Sponsor, until payment in full is received from the Applicant resulting in the
issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has
fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation
obligation requiring the credits/units.
The Banker will issue the Mitigation Credit Transfer Certificate within three (3) days of receipt of the
purchase price. Banker shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and
a documented copy of the debit of credits from the Bank Official Credit Ledger(s), indicating the permit
number and the resource type secured by the applicant. A copy of the Mitigation Credit Transfer
Certificate, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the
proper documentation.
Please contact me at 854-900-3222 or dlachAres.us if you have any questions.
Best,
David Lach
Resource Environmental Solutions, LLC
701 E. Bay Street, Suite 306
Charleston, SC 29403
Bank Sponsor — Environmental Banc & Exchange (EBX)
1 DRAWING NUMBER DRAWING NUMBER pppyy
I3 a3o
L' ■77pG 1
uwamY��m,aaa�Ts���aaE:aa��$' EE
$=Stgggg,:�Yggr,.tXggARgt-giY x $p$°
Yf �E€g�o
Sga.L.ig¢atiitYiR"_e•C6SYSgm
ass«'a_ %4kkk--_. eR«is«Y
AFiippgggtgfppipi.rgrgi=.t: A N 6 QOOATn
i m a em
a•
Tn' v 3Ri •�°` Ak1y�
R.
\ aawx ♦ REFgg
In
n` «
• Ip•F = A Vh \ '�
xr�u + is
R A'F^ 7`/7 , c11
" m s e w'za.w \ Fv j
u�g".� Ya'M j.,bb i m n,c�Ca;�y��,�9
zZ �,�.. y O
'+1tzjH
o�Uy1rm
Vp
F- A ill
R m ^ezR m 87 i / »
q"ggSqq°qqsx:�Am"�°3.t�q"bggqqqqqSq"q q^q^^q
UP$'e "a a aee as
g ^xag ��F '� ;�8' r, I ae��,"€-€"asxsoxx».sNv�ssaatxoxaoaoe»aoo��� 's_
t�^£ "A� /b m o � � 88$888$8888fl88$888&$88888888$88$8888$$ "
I .... .«�$So'....
_._...e�:te3'aR9Y�Y
^
...... o-Y.Cg9"mY8g5:
m s e w 8m.8Paa°:$.... . ... a$SBC.syy W8$a
I w / a "&t:gytiyYfLPS2t�q ;5�qt 2.S..�y ;tytr¢-3 �
8 / _ l = F • / $;;:>+xeaxffi�8q��a:>r�ssxexxx>iaa8ss:axY;z�
I I y s � msi -'oi�uowpg�wo,YeWmmumBg--�iggpp."+$:mm:"-'u�v $
fl a s J,. 'ae Q.:dBx'Sx8$g'$�ams7o__iYe'_8a8�a8cR�8.^i "
- m ro •Y m-a
.......... 4-�SoY;i. g9asa�i&"»88i�$7C
!4:4.
a.a�$i s8$s " t_essx;m=c:.tazx;�Qw;:s =
.
.ƒ�:-
�-
.:-
«w���
� .
.2~
%f
� ??
�J
CD
0
CD
3
0,
CD
N
CD
N
O
N
"'NIFI
"Sp ism4
- Y�
�J
CD
0
CD
a'
CD
N
N
O
N
O O
O
s
0
0
O O
O O)
O
O OW �
A
V
w
CD
�,
AGENT AUTHORIZATION FORM
PROPERTY LEGAL DESCRIPTION:
LOT NO. PLAN NO. PARCEL ID:
STREET ADDRESS:...-'( a•1 i e,.�� �d l�r
�l en, rem NC 2,�3�1
Please print:
Property Owner: ___ :T es
Property Owner:
The undersigned, registered property owners of the above noted property, do hereby authorize
(Contractor j Agent) (Name of consulting fir )
to act on my behalf and take all actions necessary for the processing, issuance and acceptance of
this permit or certification and any and all standard and special conditions attached.
Property Owner's Address (if different than property above):
Telephone:
We hereby certify the above information submitted in this application is true and accurate to the
best of our knowledge.
Authorized Signature
Date: 11 - ak - J.l Date:
Project
Owner:
Print
Cantrracttorr/agent/ (
C A u WWARQ WARM BUFFER NOTMCCQ II D®N FOR
Print
ature
•
The approval is for the purpose and design described in your app icl ation. Impacts not indicated in the
application is a violation of the Buffer Rule. Site specific work should be provided in the application. [15A NCAC
02H .0506 and 15A NCAC 02B .0243(8)]
Trees are not allowed to be removed from Zone 1 of the Buffer (within 30 ft of the full pond elevation), unless
approved. Exception, those trees that are severely undermined along the immediate shoreline can be removed.
Minimal shaping and sloping along the immediate shoreline is allowed. [15A NCAC 02B .0243(6)]
Benching, grading in the buffer is not allowed. Excessive disturbance of ground cover. [15A NCAC 02B .0243 (6)]
Beaches, impervious patios, impervious walkways, etc. are not allowed in the buffer unless specifically approved
by the Division. There are limitation on size for decks. [15A NCAC 02B .0243(4) and (6)]
Work to be conducted from land must indicate an access and indicate any trees that are to be removed. The
work corridor should be described. The approved access corridor shall be restored. Staging, spoil, construction
material must be outside the buffer. [15A NCAC 02H .0502 and 15A NCAC 02B .0243 (4), (6), (8)]
Stormwater cannot be piped or channeled for direct discharge to the lake. All constructed stormwater
discharges must be at the natural elevation and discharged prior to entering the buffer directed as diffuse or
sheet flow at non -erosive velocities to the lake. [15A NCAC 02B .0243(5), (6)]
hereby state that I have been informed of the Catawba
Rip, Jan Buffer Rule. Any work conducted in the buffer, not specifically stated in the application and approved
by the Division of Water Resources (DWR), is a violation and subject to enforcement. Due diligence will be
taken such that the construction will b Lu kilt within substantial compliance and intent of the 401 Water
Quality Certification and Buffer R s, t approved plan(s) and specification(s), and other supporting
materials. /
Signature (owner): L--y k_�_ Date: I)- a,['_