Loading...
HomeMy WebLinkAboutSW5200701_Supplement-EZ Form_20220105SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Bojangles at Spring Hop 2 Project Area ac �c98— 7.83 3 Coastal Wetland Area ac 0 4 Surface Water Area ac 0 5 Is this project High or Low Density? High 6 1 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks r -vided feet 60 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? N/A 10 Is streambank stabilization proposed on this project? No a FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: J. Michael Stocks, PE 28 Organization: Stocks Engineering 29 Street address: 801 E Washington St. 30 City, State, Zip: Nashville, INC 27856 31 Phone numbers : 252-459-8196 32 1 Email: mstocks@stocksengineering.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. N CAR �O..oESSlp,L.:y s t e a SnE�A,�L�j 17843 d� •••••.•• EL /I � % dy-a j 5k, Si ature of Designer Ioho/zl Dater DRAW -WE AREAS 1 Is this a hi h density project? 2 If so, number of drainage areas/SCMs Is all/part of this project subject to previous rule 3 versions? FORMSLOADED Yes 1 — No DRAINAGE AREA INFORMATION Entire Site 4 T e of SCM N/A 1 j Wet Pond 5 Total BUA in project (sq ft 148803 sf 151153 sf 6 New BUA on subdivided lots (subject to permitting) (sq ft sf sf 7 Permittin New BUA outside of subdivided lots (subject to s 148803 sf 151153 sf 8 Offsite - total area (sq ft sf 11051 sf 9 Offsite BUA (sq ft sf 2350 sf 10 Breakdown of new BUA outside subdivided lots: Parkin (sq ft 51962 sf 51962 sf Sidewalk (sq ft 1601 sf 1601 sf Roof (sq ft 3500 sf 3500 sf Roadway s ft 26400 sf 26400 sf Future (sq ft 65340 sf 65340 sf Other, please specify in the comment box below (sq ft sf sf _ 11 New infiltrating permeable pavement on subdivided lots (sq ft sf sf 12 New infiltrating permeable pavement outside of subdivided lots (sq ft sf sf 13permitting) Exisitng BUA that will remain (not subject to s ft 5035 sf 5035 sf 14 Existing BUA that is already permitted (sq ft sf sf 15 Existing BUA that will be removed (sq ft sf sf 16 Percent BUA 44% 43% 17 Desi n storm inches 1 in 18 Design volume of SCM cu ft 12803 cf 19 Calculation method for design volume Simple ADDITIONAL INFORMATION 20 1 Please use this space to provide any additional information about the drainage area(s): The 11,051 sf is the area that drains to the Bjangles SCM from the Duck Thru Project Area (SW5210603). Of this 11051 sf, 2350 sf will be impervious. Please see Runoff Map in the plan set. WET POND 1 Drainage area number 1 21 Design volume of SCM (cu ft) GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? 12803 cf yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an over or bypass for inflow volume in excess of the design volume? Yes 9 1 What is the method for dewatering the SCM for maintenance? Pump (preferred) 101 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? Yes 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? Yes 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 151 Is there an O&M Plan that complies with General MDC (12)? Yes 161 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? WET POND MDC FROM 02H .1053 181 Method used Yes SA/DA 191 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 240.00 21 Elevation of the main pool bottom -(top of sediment removal) (fmsl) 240.50 22 Elevation of the bottom of the vegetated shelf (fmsl) 246.00 23 Elevation of the permanent pool (fmsl) 246.50 241 Elevation of the top of the vegetated shelf (fmsl) 247.00 251 Elevation of the temporary pool (fmsl) 248.33 26 Surface area of the main permanent pool (square feet) 3899 sf 27 Volume of the main permanent pool (cubic feet) 14134 cf 28 Average depth of the main pool (feet) 3.10 ft 29 Average depth equation used Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 321 Volume of the forebay (cubic feet) 2869 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 42 in 35 Design volume of SCM (cu ft) 12803 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 1.3" 38 If weir, weir height (inches) 391 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 4.1 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance (inches) 54 in 44 Depth of forebay at exit (inches) 42 in 451 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No 51 1 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Centipede 54 Has a planting plan been provided for the vegetated shelf? Yes - IMNIFORMATION 6 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 1 10:53 AM 1/5/2022