HomeMy WebLinkAboutSW5200701_Supplement-EZ Form_20220105SUPPLEMENT-EZ COVER PAGE
FORMS LOADED
PROJECT INFORMATION
1 Project Name Bojangles at Spring Hop
2 Project Area ac �c98— 7.83
3 Coastal Wetland Area ac 0
4 Surface Water Area ac 0
5 Is this project High or Low Density? High
6 1 Does this project use an off -site SCM? No
COMPLIANCE WITH 02H .1003(4)
7 Width of vegetated setbacks r -vided feet 60
8 Will the vegetated setback remain vegetated? Yes
9 Is BUA other that as listed in .1003 4 c-d out of the setback? N/A
10 Is streambank stabilization proposed on this project? No a
FORMS LOADED
DESIGNER CERTIFICATION
27
Name and Title:
J. Michael Stocks, PE
28
Organization:
Stocks Engineering
29
Street address:
801 E Washington St.
30
City, State, Zip:
Nashville, INC 27856
31
Phone numbers :
252-459-8196
32
1 Email:
mstocks@stocksengineering.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
N CAR
�O..oESSlp,L.:y s
t
e a SnE�A,�L�j
17843
d� •••••.••
EL
/I � % dy-a j 5k,
Si ature of Designer
Ioho/zl
Dater
DRAW -WE AREAS
1 Is this a hi h density project?
2 If so, number of drainage areas/SCMs
Is all/part of this project subject to previous rule
3 versions?
FORMSLOADED
Yes
1 —
No
DRAINAGE AREA INFORMATION Entire Site
4 T e of SCM N/A
1 j
Wet Pond
5
Total BUA in project (sq ft
148803 sf
151153 sf
6
New BUA on subdivided lots (subject to permitting)
(sq ft
sf
sf
7
Permittin
New BUA outside of subdivided lots (subject to
s
148803 sf
151153 sf
8
Offsite - total area (sq ft
sf
11051 sf
9
Offsite BUA (sq ft
sf
2350 sf
10
Breakdown of new BUA outside subdivided lots:
Parkin (sq ft
51962 sf
51962 sf
Sidewalk (sq ft
1601 sf
1601 sf
Roof (sq ft
3500 sf
3500 sf
Roadway s ft
26400 sf
26400 sf
Future (sq ft
65340 sf
65340 sf
Other, please specify in the comment box
below (sq ft
sf
sf _
11
New infiltrating permeable pavement on
subdivided lots (sq ft
sf
sf
12
New infiltrating permeable pavement outside of
subdivided lots (sq ft
sf
sf
13permitting)
Exisitng BUA that will remain (not subject to
s ft
5035 sf
5035 sf
14
Existing BUA that is already permitted (sq ft
sf
sf
15
Existing BUA that will be removed (sq ft
sf
sf
16
Percent BUA
44%
43%
17
Desi n storm inches
1 in
18
Design volume of SCM cu ft
12803 cf
19
Calculation method for design volume
Simple
ADDITIONAL INFORMATION
20
1 Please use this space to provide any additional information about the
drainage area(s):
The 11,051 sf is the area that drains to the Bjangles SCM from the Duck Thru
Project Area (SW5210603). Of this 11051 sf, 2350 sf will be impervious.
Please see Runoff Map in the plan set.
WET POND
1
Drainage area number
1
21 Design volume of SCM (cu ft)
GENERAL MDC FROM 02H .1050
3 Is the SCM sized to treat the SW from all surfaces at build -out?
12803 cf
yes
4
Is the SCM located away from contaminated soils?
Yes
5
What are the side slopes of the SCM (H:V)?
3:1
6
Does the SCM have retaining walls, gabion walls or other engineered
side slopes?
No
7
Are the inlets, outlets, and receiving stream protected from erosion
(10-year storm)?
Yes
8
Is there an over or bypass for inflow volume in excess of the
design volume?
Yes
9
1 What is the method for dewatering the SCM for maintenance?
Pump (preferred)
101
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
13
If the SCM is on a single family lot, does (will?) the plat comply with
General MDC (10)?
Yes
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
151
Is there an O&M Plan that complies with General MDC (12)?
Yes
161
Does the SCM follow the device specific MDC?
Yes
17 Was the SCM designed by an NC licensed professional?
WET POND MDC FROM 02H .1053
181 Method used
Yes
SA/DA
191
Has a stage/storage table been provided in the calculations?
Yes
20
Elevation of the excavated main pool depth (bottom of sediment
removal) (fmsl)
240.00
21
Elevation of the main pool bottom -(top of sediment removal) (fmsl)
240.50
22
Elevation of the bottom of the vegetated shelf (fmsl)
246.00
23
Elevation of the permanent pool (fmsl)
246.50
241
Elevation of the top of the vegetated shelf (fmsl)
247.00
251
Elevation of the temporary pool (fmsl)
248.33
26
Surface area of the main permanent pool (square feet)
3899 sf
27
Volume of the main permanent pool (cubic feet)
14134 cf
28
Average depth of the main pool (feet)
3.10 ft
29
Average depth equation used
Equation 2
30
If using equation 3, main pool perimeter (feet)
31
If using equation 3, width of submerged veg. shelf (feet)
321
Volume of the forebay (cubic feet)
2869 cf
33
Is this 15-20% of the volume in the main pool?
Yes
34
Clean -out depth for forebay (inches)
42 in
35
Design volume of SCM (cu ft)
12803 cf
36
Is the outlet an orifice or a weir?
Orifice
37
If orifice, orifice diameter (inches)
1.3"
38
If weir, weir height (inches)
391
If weir, weir length (inches)
40
Drawdown time for the temporary pool (days)
4.1
41
Are the inlet(s) and outlet located in a manner that avoids short-
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
No
43
Depth of forebay at entrance (inches)
54 in
44
Depth of forebay at exit (inches)
42 in
451
Does water flow out of the forebay in a non -erosive manner?
Yes
46
Width of the vegetated shelf (feet)
6 ft
47
Slope of vegetated shelf (H:V)
6:1
48
Does the orifice drawdown from below the top surface of the
permanent pool?
Yes
49
Does the pond minimize impacts to the receiving channel from the 1-
yr, 24-hr storm?
Yes
50
Are fountains proposed? (If Y, please provide documentation that
MDC(9) is met.)
No
51 1
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
53
Species of turf that will be used on the dam and embankment
Centipede
54
Has a planting plan been provided for the vegetated shelf?
Yes
-
IMNIFORMATION
6
55
Please use this space to provide any additional information about the
wet pond(s):
Wet Pond 1 10:53 AM 1/5/2022