Loading...
HomeMy WebLinkAboutNC0020656_Performance Annual Report 2006_20070312Annual Performance Report 2006 General Information Facility/System Name: City of Laurinburg Leith Creek Wastewater Plant DEN Responsible Entity: City of Laurinburg Person In Charge/Contact: Robert A. Ellis, Treatment Plants Director Applicable Permit(s) NC0020656 / WQ002526 / WQCS00062 Description of Collection System DENR - WATER QUALITY POINT SOURCE EEY-.F.,CH MAR 2 The City of Laurinburg's collection system consists of 34 pump stations located throughout the system. There are 123.7 miles of gravity sewers and 24 miles of force mains. Our Leith Creek Plant consist of two types of treatment, one extended aeration plant, consisting of 2 aeration basins, 2 clarifiers, 2 chlorine contact chambers and one return sludge pump station with 3 dual speed pumps, total capacity 2.0 million gallons per day (MGD). The second plant is an oxidation ditch style with 1 clarifier, 1 chlorination point and 1 return sludge pump station with 3 dual speed pumps, total capacity 2.0 MGD, for a total treatment capacity of 4.0 MGD. The facility has 2 aerobic digesters, (1) 150,000-gallon tank and (1) 650,000-gallon tank with course air diffusers. Summary of System Performance for Calendar Year 2006 The discharge from the City of Laurinburg's Leith Creek Wastewater Treatment Plant was in non- compliance during the month of July, November & December. Month NPDES Violation Reason(s) July Exceeded Minimum We reduced the amount of time PH weekly requirement. we ran the aerators and this increased the pH. November Failed Toxicity Test The Organisms did not die but they failed to reproduce. December Failed Toxicity Test The organisms did not die but they Have no results for Total Nitrogen, failed to reproduce as well as the Total Phosphorous, Copper & Zinc. control sample. Chief Operator failed to collect monthly samples so no results were provided for the monthly test in December. Summary of Sanitary Spills/Overflows: Months Location 05/19/06 N. Main & McGirts Bridge Rd. 08/21/06 Force Main on Hasty Road 11/15/06 Canal at the end of Avery St. Volume 800 Gallons 500 Gallons 250 Gallons Summary of Sanitary Spills/Overflows (continued): Sanitary sewer overflow events in which volumes exceeding 1,000 gallons overflowed and reach surface waters are included in the monthly estimates and are shown separately as follows: Date Location Gallons 05/07/06 Manhole Crn. 2,000 McGirt Bridge Rd. & N. Main St. 11/22/06 Pizza Hut Pump Station 1811 South Main Street 11/22/06 Bridge Creek Pump Station 1,000 Description Corrective Measures Excessive Rainfall Cleaned and video the line & Grease Found no problems. We will inspect this line more frequently. Excessive Rainfall 4 Inches in 24 Hrs 100,000 Excessive rainfall 4 Inches in 24 Hrs. 12/28/06 Aerial Line 7,200 Carver Street Excessive Rainfall caused erosion to the support on the aerial sewer line Replaced Interceptor to reduce Inflow & Infiltration All Equipment working properly. Temporary repairs were made to contain it immediately and on 1/2/07 permanent repairs were made. *Note the overflows listed resulted in no environmental impact. Notification This Annual Performance Report will appear on the City of Laurinburg's web site http://www.laurinburg.org and a statement on our Consumer Confidence Report (CCR) will inform citizens that the Annual Report is available via internee or upon request. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users or customers of the named system and that those users have been notified of its availability. Robert A. Ellis, Treatment Plants Director Treatment Plants Director City of Laurinburg March 12, 2007 -