Loading...
HomeMy WebLinkAboutNC0020656_Performance Annual Report 2010_20110228of 0turio6ur ,. OFFICE OF THE TREATMENT PLANTS DIRECTOR General Information Ev3AR 2 1 2011 DW Annual Performance Report 2010 Facility/System Name: City of Laurinburg Leith Creek Wastewater Plant Responsible Entity: City of Laurinburg Person In Charge/Contact: Robert A. Ellis, Treatment Plants Director Applicable Permit(s) Description of Collection. System 002526F;/ WQ0S00062 Itstral All -America City 'I'll®, 1956 2 3 1967 I MAR 18 2011 DENR=WADER QUALITY POINT SOURCE BRANCH The City of Laurinburg's collection system consists'of 34 pump stations located throughout the system. There are 123 7 miles,of gravity sewers and 24 miles of force. mains. Our Leith Creek Plant consist of two :types'of treatment, one extended aeration plant,`consisting of 2 aeration basins, 2 clarifiers, 2 chlorine contact chambers and one return sludge pump station with 3 dual speed pumps, total capacity 2 0 m llion'gallons per day (MGD). " 1 • The second plant is an oxidation ditch style with 1'clarifier, 1 chlorination point and 1 return sludge pump stationtwith ,3 dual speed pumps, total capacity 2.0 MGD, for a total treatment capacity of 4.0 MGD The facility has;.2 aerobic digesters, (1) 150000-gallon tank and (1) 650,000-gallon tank with course air Summary of System Performance for Calendar -Year 2010 The discharge from the City of Laurinburg's Leith Creek Wastewater Treatment Plant met all permit requirements and had no Notice of Violation (NOV) for the year of 2010. Summary of Sanitary Spills/Overflows: Months Location - Volume 09/30/10 1721 Berwick Drive (Bridge Creek) 37,000 Gallons 09/30/10 N. Caledonia Road 7,200 Gallons 09/30/10 Manhole at 7th Street 400 Gallons 603 LAUCHWOOD DRIVE • P.O. BOX 249 • LAURINBURG, N.C. 28353 ! PHONE: 910/277-0214 • FAX: 9101277-3633 • Summary of Sanitary Spills/Overflows (continued): Sanitary sewer overflow events in which volumes exceeding 1,000 gallons overflowed and reach surface waters are included in the monthly estimates and are shown separately as follows: Date Location 09/30/10 1721 Berwick Dr Bridge Creek 09/30/10 N. Caledonia Rd. Bridge Creek Gallons Description 37,000 Excessive Rainfall (4.3 Inches in 24 Hrs.) Corrective Measures All Equipment working properly. 7,200 Excessive Rainfall All Equipment working (4.3 Inches in 24 Hrs.) properly. *Note the overflows listed resulted in no environmental impact. Notification This Annual Performance Report will appear on the City of Laurinburg's web site http://www.laurinburg.org and a statement on our Consumer Confidence Report (CCR) will inform citizens that the Annual Report is available via internet or upon request. Certification I certify under penalty of law that this report is complete and accurate to the best of my knowledge. I further certify that this report has been made available to the users or customers of the named system and that those users have been notified of its availability. Robert A. Ellis Robert A. Ellis, Treatment Plants Director Treatment Plants Director City of Laurinburg February 28, 2011