Decerrmber 8,.2021
LETTER OF APPROVAL'
Cates Building, Inc.
Christopher Cates, President
630 Executive Place, Suite 400
Fayetteville, NC 25305 .
RE: Project Name: Laurel Ridge Subdivision Phase 1 (Lots # 8-10; Septic
Lots 8 & 9)..
Acres Approved: 1..97
P,roject-ID. MOORE72022-022
County: Moore, City: 'Mineral Springs
Address: Pine Laurel Drive
River Basin: Cape Fear
Stream Classification: Other .
Submitted by: Johnny Tew
Date Received by LQS: -November 16, 202l.
Plan Type: Residential.
Dear. Mr. Cates:
This office has reviewed the subject erosion and sedimentation control plan., Vie find
the plats; to be acceptable and herebyissue this Letter of Approval. The enclosed
Certificate of Approval must be posted at the job site. This plan shall expire three (3)
years following the .date of approval, .if no land. disturbing activity has been
undertaken, as is required -by Title 15A NCAC. 4B .0129.
As of April ly 2019, all new.constr4ction activities are required to complete and
submit an electronic Notice of Intent (NOI) form requesting a Certificate of
Coverage (COC) under the NCG010000 Construction 5tormwater General Permit.
This form MUST be submitted and' COC issued prior to the commencement of any
land disturbing activity on the above -named project. The. NOI form may be accessed
at deq.nc.aovINCG01. Please direct questionsabout the NOI form to Annette.Lucas
at Annette.lucas ncdenr: ov or Paul Clark at Paui.clark g7ncdenr.gev_. After you
submit a complete and correct NOI Form, a COC will be emailed to you within
three business days. Initially, DEMLR will not charge a fee for coverage,under the
NCGO1 permit. However, on or after June 13 2019, a $100 fee will be. charged
annually. This fee is to be sent to the DEMLR Stormwater Central Office staff, in
Raleigh .
ra( d 1a cG
1�Eor n. ararlla�a'[�epartnserrt.afE vaeonmenat€pality 1 Q7via[anofEner99�Mine an � :,R�Sourceq
F4y.d yli le 111 QiS�Y6 l l ifii�c 22 9t#E t `. Wltc 71 .E F y ! v?C� f 3trtih C rv11 E 41'' .
Title 15A NCAC 413.0118(a) and the NCGOI permit requirethat the following documentation
be kept on. file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 30 days.
Also, this letter gives the notice required by G.S. 1-1 3A-6 1. 1 (a) of our right of
periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance -oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, the erosion and sedimentation. control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control
Act of 1973 (North Carolina General Statute l 13A-51 through 66), this office may
require revisions to the plan and implementation of the revisions to insure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws', regulations, and rules. In addition, local city or
county ordinances, or rifles may also. apply to this land -disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the
information provided in the Financial Responsibility Form, which you provided.
You are requested to file an amended form if there is any change in the.
information included on the form.. This permit allows fora land -disturbance, as
called for on the application plan, not to exceed the approved acres. Exceeding
the acreage will be a violation of this permit and would require a revised plan and
additional application fee. Any addition in impervious surface, over that already
noted on the approved plan, would also require a revised plan to verify the
appropriateness of the erosion control measures and the stormwater retention
measures. (GS 113A-54.1(b)). In addition, it would be helpful if you -notify this
office of the proposed starting date for this project. Please notify us if you plan to
have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
Chris Baker
Assistant Regional Engineer
DEMLR - Fayetteville Regional Office
Enclosures: Certificate of Approval
cc: Glen Tew, P. B., ECLS Global, Inc. -- electronic copy
Debra Ensminger, Moore County inspections Office — electronic copy