Loading...
HomeMy WebLinkAbout20190264 Ver 2_Application Attachments_20211228Permit Class MODIFICATION/MAJOR Permit Number 49-19 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ,permit Lr `it for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Dare County, 954 Marshall C. Collins Drive, Manteo, NC 27954 Authorizing development in Dare County at Oregon Inlet, from the ocean bar channel to Old House Channel , as requested in the permittee's application dated 7/1/21, including attached workplan drawings (8), dated 8/4/21, and AEC Hazard Notice dated 4/20/21. This permit, issued on December 21, 2021 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically a,tered herein, all development shall be carried out in accordance with the attached workplan drawings. Excavation 2) Excavation shall not exceed -14' MLLW (with a 2' overdredge allowance) in Oregon Inlet and the ocean bar channel and -12' MLLW (with no overdredge allowance) in the channels labeled Oregon Inlet to Hells Gate Channel and Old House Channel Range 1. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on -site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2024 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chair of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Dare County- Oregon Inlet Maintenance Dredging Permit No. 49-19 Page 2 of 3 ADDITIONAL CONDITIONS 3) In accordance with commitments made by the permittee, sidecast dredging shall be limited to creation of a pilot channel and shall not be the primary method of excavation. 4) In order to minimize adverse impacts to fisheries resources and in accordance with commitments made by the permittee, no sidecast dredging activities shall occur from April 1 to July 31 of any year without prior approval from the Division of Coastal Management in consultation with the Division of Marine Fisheries, the North Carolina Wildlife Resources Commission, and the U.S. Army Corps of Engineers. Cultural Resources 5) In accordance with commitments made by the permittee, prior to the initiation of any dredging activities in or adjacent to the ocean bar channel, the permittee shall submit a plan depicting the three applicable avoidance buffer areas adjacent to the channel. Initiation of permitted dredging activities shall not begin until written approval of this plan is obtained from the N.C. Department of Natural and Cultural Resources, and a copy of such approval has been submitted to the Division of Coastal Management. 6) There exists the possibility that the authorized activities may unearth a beached shipwreck or other archaeological resources. Should such a finding occur, the permittee shall immediately move to another area. The DNCR Underwater Archaeology Branch shall be contacted at (910) 458-9042 to determine appropriate response procedures. General 7) Prior to the initiation of any dredging activities authorized by this permit, the permittee shall demonstrate to DCM, in coordination with the appropriate resource agencies, that the dredge plant has been constructed in accordance with the U.S. Army Corps of Engineers hopper dredge plant specifications and that the dredge plant complies with the conditions of the Corps' 2004 FONSI. 8) The permittee shall obtain any necessary authorizations or approvals from the U.S. Army Corps of Engineers prior to initiation of any permitted activity. Unless altered by a specific Condition of this Pennit, the permittee shall adhere to all conditions of the Federal approval. 9) This permit shall not be assigned, transferred, sold or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 10) In order to ensure compliance with the conditions of this permit, and in order to ensure that each proposed excavation event adheres to the limits of this permit authorization, the permittee and his contractor shall schedule a pre -construction conference with the Division of Coastal Management, the U.S. Army Corps of Engineers, and the N.C. Division of Water Resources prior to the initiation of any dredging activities. In order to facilitate these discussions, a complete set of project plans shall be provided to all listed agencies at the time of each request for a pre -construction conference. 11) The authorized project shall not interfere with the public's right to free navigation on all navigable waters of the United States. No attempt will be made by the permittee to prevent the fill and free use by the public of all navigable waters at or adjacent to the authorized work for reasons other than safety. Dare County- Oregon Inlet Maintenance Dredging Permit No. 49-19 Page 3 of 3 ADDITIONAL CONDITIONS 12) Any mitigative measures or environmental commitments specifically made in the application for this project should be implemented, regardless of whether or not such commitments are addressed by individual conditions of this permit. 13) This Major Modification shall be attached to the original of Permit No. 49-19, which was issued on 6/24/19, and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. 14) All conditions and stipulations of the active permit remain in force under this Major Modification unless specifically altered herein. 15) Any violation of the Water Quality Certification shall also be considered a violation of this CAMA Permit. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers has previously assigned the proposed project Action 1D No. SAW-2019-00175. _NOTE: An. application processing fee of $475 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources.