Loading...
HomeMy WebLinkAboutNCC216830_Site Plan or Location Map_20220105F- M E CEN R AV O Z �i U) 2� O o �O zLEGEND ' �- C� SITE >:. �O 00 PROP. DISTURBANCE LIMITS p O - �� C6.1 I O� PROP. MAJOR CONTOUR 820 ' 1 Z PROP. MINOR CONTOUR 818 PROP. SEDIMENT BASIN DRAINAGE AREA % VICINITY MAP / N.T.S. TEMP. SILT FENCE X X - _ FUTI. NARRATIVE: STRAW WATTLE THE PROPOSED VILLAGES AT CODDLE SUBDIVISION PROJECT IS WITHIN THE TOWN LIMITS OF MOORESVILLE, IREDELL COUNTY, STONE OUTLET NORTH CAROLINA. THE TOTAL DISTURBED ACREAGE FOR THE �/ s PROPOSED DEVELOPMENT IS APPROXIMATELY +/- 74 ACRES. THE SCOPE OF WORK INCLUDES CLEARING, STRIPPING AND GRADING EXIST. TREE LINE I �r FOR THE ROADWAYS AND BUILDING PADS, INSTALLATION OF EROSION CONTROL MEASURES, GRASS -LINED DITCHES, STORM DRAINAGE PIPES, UTILITIES, AND PAVING. EXIST. MAJOR CONTOUR - 700 - /l BASED ON SCS SOIL SURVEY MAP, SITE CONSISTS OF: VI �P Ce132 - CECIL SANDY CLAY LOAM, 2% TO 6% SLOPES EXIST. MINOR CONTOUR 700 C6.3 r� CeC2 -CECIL SANDY CLAY LOAM, 6% TO 10% SLOPES MaE4 - MADISON-UDORTHENTS COMPLEX, 15% TO 25% SLOPES PaE - PACOLET SANDY LOAM, 15% TO 25% SLOPES TEMP. DIVERSION DITCH PcB2 - PACOLET SANDY CLAY LOAM, 2% TO 6% SLOPES PROPERTY LINE (TYP) PcC2 - PACOLET SANDY CLAY LOAM, 6% TO 10% SLOPES PcD2 - PACOLET SANDY CLAY LOAM, 10% TO 15% SLOPES PcE2 - PACOLET SANDY CLAY LOAM, 15% TO 25% SLOPES ( „ RiF - RION SANDY LOAM, 15% TO 45% SLOPES \ 9/ WaA - WARNE LOAM, 0% TO 2% SLOPES DOWNSTREAM RECEIVING WATER IS ROCKY RIVER. THIS SITE IS IN ZONE AE FLOODPLAIN PER FEMA FLOOD MAP COMMUNITY PANEL NUMBER: 3710466600J, DATED 3/18/2008. EROSION CONTROL NOTES: 1. ON -SITE BURIAL PIT LOCATIONS MUST BE DOCUMENTED ON FINAL PLAT. 2. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE STATE EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 3. NO MORE THAN 20 ACRES TO BE DISTURBED AT ONE TIME. 4. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. 5. ALL AREAS ARE TO BE SEEDED AND MULCHED PER THE NEW STABILIZATION TIMEFRAME TABLE ON SHEET. 6. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY IREDELL COUNTY EROSION CONTROL INSPECTOR. 7. MAXIMUM TEMPORARY GRADED SLOPES ARE 3:1. WHEN STEEPER SLOPES MUST BE USED, PLANS SHALL BE SEALED BY A GEOTECHNICAL ENGINEER FOR SLOPE STABILITY AND FINAL SURFACE STABILIZATION. 8. ALL WORK IMPACTING STREAMS MUST HAVE APPROPRIATE NCDENR-DWQ AND U.S.A.C.E. (401/404) PERMITS. 9. ALL FLOW FROM PERMANENT / TEMPORARY DITCHES SHOULD BE DIRECTED TOWARDS SEDIMENT TRAPS UNTIL SITE IS COMPLETELY STABILIZED. 10. ALL PERMANENT SLOPES STEEPER THAN 3:1 SHALL HAVE EROSION CONTROL MAT EQUIVALENT TO NORTH AMERICAN GREEN SC75. 11. DE -WATERING OF THE WORK AREA DIRECTLY INTO A STREAM, CREEK, WETLAND, ETC. IS PROHIBITED. 10. ANY OFF -SITE BORROW OR SPOIL SITE USED DURING CONSTRUCTION SHALL HAVE AN APPROVED EROSION CONTROL PLAN. MAINTENANCE PLAN: THE FOLLOWING MAINTENANCE PLAN SHALL BE FOLLOWED UNTIL THE SITE IS COMPLETELY STABILIZED AFTER CONSTRUCTION. DURING CONSTRUCTION THE CONTRACTOR SHALL BE RESPONSIBLE FOR INSPECTION AND MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL STRUCTURES. 1. ALL EROSION CONTROL MEASURES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING ANY RAINFALL PRODUCING RUNOFF AND AT LEAST ONCE EVERY WEEK. ANY NEEDED REPAIRS SHALL BE MADE IMMEDIATELY SO THAT ALL EROSION CONTROL MEASURES ARE MAINTAINED AS DESIGNED. 2. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED IN ACCORDANCE WITH THE SEEDING SPECIFICATIONS IN ORDER TO MAINTAIN A DENSE VEGETATIVE COVER. 3. SEDIMENT DEPOSITS SHALL BE REMOVED FROM SEDIMENT FENCE AFTER EACH STORM EVENT OR SEDIMENT FENCE SHOULD BE REPLACED. THEY MUST BE REMOVED WHEN DEPOSITS REACH APPROXIMATELY HALF THE HEIGHT OF THE BARRIER. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SEDIMENT FENCE IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED. 4. SEDIMENT BASINS SHALL BE CLEANED OUT WHEN THE LEVEL OF SEDIMENT REACHES THE MID -DEPTH POINT BELOW THE WEIR ELEVATION. WASHED STONE SHALL BE CLEANED OR REPLACED WHEN THE SEDIMENT BASIN NO LONGER DRAINS PROPERLY. 5. GROUND COVER SHALL BE ESTABLISHED ON EXPOSED SLOPES PER THE NEW STABILIZATION TIMEFRAME TABLE ON SHEET C6.7. 6. SEDIMENT DEPOSITS SHALL BE REMOVED FROM TEMPORARY CHECK DAMS AND/OR WATTLES AFTER EACH STORM EVENT. STONE FACING SHALL BE CLEANED OF CONTAMINATED STONE AND REPLACED WITH CLEAN WASHED STONE. CONSTRUCTION SEQUENCE: 1. OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM IREDELL COUNTY. 2. SET UP A ON -SITE PRE -CONSTRUCTION CONFERENCE WITH IREDELL COUNTY AT (704) 832-2352 TO DISCUSS EROSION CONTROL MEASURES. 3. FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE. 4. COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF ANY EROSION CONTROL MEASURES. 5. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 6. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. PHASE 1 1. DRAIN EXISTING POND TO LEVEL BELOW FILL LIMITS. 2. CLEAR ONLY AS NECESSARY TO INSTALL EROSION CONTROL MEASURES IN THIS PHASE. 3. INSTALL CONSTRUCTION ENTRANCE AND ALL SILT FENCE, INCLUDING OUTLETS. 4. CONSTRUCT BYPASS CHANNEL AND INSTALL STORM DRAINAGE FES-1 TO DI-6. 5. INSTALL EROSION CONTROL BASINS SB-1, SK-2, SK-3, SK-4, ST-5, SB-6, SB-7, SK-8, AND SK-9. STOCKPILE EXCESS SOIL UPHILL OF AND ADJACENT TO EACH BASIN. 6. CONSTRUCT DIVERSION CHANNELS AND INSTALL WATTLES. 7. SEED, MULCH, AND TACK EACH BASIN. 8. CALL EROSION INSPECTOR FOR APPROVAL PRIOR TO BEGINNING FULL GRADING OPERATION PER PHASE 2. SEE PHASE 2 FOR CONTINUED OPERATION. C6.7 1 C6.8 C6.9 / - - \ C6.10 - CP 0-0 S K-6 /v _- - - / / - / - - 79 8, i\/ - 840 SK-8 _ �-- ��\ 830 -� 11� J J/ 82 -600 10 _77 800 1 I I I ` s - - ss - ---- TERLINE (TYP) Ol O31NOla0 ala0ON H1aON GRAPHIC SCALE 0 100' 200' 400' ( IN FEET ) HORIZONTAL 1 inch = 200 ft. �1 i 1). CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2). CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAG MEN, ETC., AS NECESSARY TO INSURE SAFETY. 3). ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION AND LOCAL MUNICIPALITIES. 4). SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMENDED. Town of Mooresville, North Carolina Concept Plan Approval Planning Department Date Engineering Department Date Fire Department Date U p a� o U M a) U W O 0) Cu - N r V (6 U L 'v O z " o Q U rn c Q 00 N C O J 2i W N(A- U Z 3 9IM4 CaAn rm" 01111111111// N R .9 LICENSE NO.: F-1407 III I I I i 111J1t/tt/z .:';fit` •'��5�a/rj .ss�'i�. 7582 M a F_ z O U J J W 0 w Lu w a U) 0 0 WW W N F_ o a `= � N M O z CU z J LLI J J O z N O W O Z O � O > CU a Z O m � N 0 OL Z Q J � W 0 V_ O Lu Lu U � 2 a w W J Lu ♦11 L) W J v J ID j O Lu ILL LL O LL W W CU M PROJECT INFORMATION PROJECT MANAGER: DEB DESIGNED BY: ALL DRAWN BY: AMP PROJECT NUMBER: HR56.401 ORIGINAL DATE: 12/18/2020 SHEET C6.0