HomeMy WebLinkAbout20040589 Ver 2_Dogtown Buffer SOA - South Point Access Area_20220104Strickland, Bev
From: Amy Staley <astaley@res.us>
Sent: Tuesday, January 4, 2022 12:01 PM
To: Chris Huysman; Perez, Douglas J
Cc: Daniel Ramsay
Subject: RE: [EXTERNAL] Re: Duke Energy South Point Access Area Mitigation
Attachments: Dogtown Buffer SOA - South Point Access Area.pdf
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Good Morning Chris and Doug,
I have attached the updated SOA for 21,416 sqft of buffer mitigation credits. It is valid for 90 days. In a separate email
Brian indicated he would like an invoice, can you please provide the purchasing entity information and I will get that
done today as well. If I have overlooked that exact information, I apologize.
Thank you,
Amy Staley
Office Coordinator II
RES I res.us
Direct: 919.209.1055
Restoring a resilient earth for a modern world
From: Chris Huysman <chrishuysman@wetlands-waters.com>
Sent: Monday, January 3, 2022 4:21 PM
To: Perez, Douglas J <doug.perez@ncdenr.gov>
Cc: Amy Staley <astaley@res.us>; Daniel Ramsay <dramsay@res.us>
Subject: Re: [EXTERNAL] Re: Duke Energy South Point Access Area Mitigation
Doug -
These are the correct numbers- Thanks.
On Mon, Jan 3, 2022 at 4:07 PM Perez, Douglas J <doug.perez@ncdenr.gov> wrote:
Hello All,
So below is the corrected table of mitigation that we will require. If it doesn't make sense let me know. Once the
updated mitigation letter is sent, I'll add it to the file but otherwise, I will send the approval up the chain and it
should be signed and go out tomorrow.
1
Compensatory
Mitigation Required
River and Sub -Basin
Number
Ratio Corrected
Mitigation Required
Zone 1 Buffers
Beach
Pedestrian Trail
10,798 sq. ft.
10,241 sq. ft.
467 sq. ft
Catawba 03050101
2:1 ratio
21,416 sq. ft. (total)
20,482 sq. ft.
934 sq. ft.
From: Chris Huysman [mailto:chrishuysman@wetlands-waters.com]
Sent: Thursday, December 30, 2021 6:13 PM
To: Amy Staley <astaley@res.us>
Cc: Daniel Ramsay <dramsay@res.us>; Perez, Douglas J <doug.perez@ncdenr.gov>
Subject: Re: [EXTERNAL] Re: Duke Energy South Point Access Area Mitigation
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Let's give Doug a day or two to get this to you- probably next week if I had to guess.
Thanks for your prompt response.
On Thu, Dec 30, 2021 at 4:32 PM Amy Staley <astaley@res.us> wrote:
Chris,
Can you provide an updated letter or permit from regulatory authority stating correct buffer mitigation needed? I can
issue an updated SOA and invoice thereafter.
Thank you,
Amy Staley
Office Coordinator II
2
RES 1 res.us
Direct: 919.209.1055
Restoring a resilient earth for a modern world
From: Perez, Douglas J <doug.perez@ncdenr.gov>
Sent: Wednesday, December 29, 2021 11:14 AM
To: Chris Huysman <chrishuysman@wetlands-waters.com>; Amy Staley <astaley@res.us>
Cc: David Lach <dlach@res.us>; Jeff.Lineberger@duke-energy.com; Johnson, Alan <alan.johnson@ncdenr.gov>;
Sarah.Santos@duke-energy.com; Steve.Cahoon@duke-energy.com; Tami.Styer@duke-energy.com; Williams, Kelly
<kelly.williams@ncdenr.gov>; brian.couture@duke-energy.com; Daniel Ramsay <dramsay@res.us>
Subject: RE: [EXTERNAL] Re: Duke Energy South Point Access Area Mitigation
All,
Based on Chris doing his due diligence (thanks Chris), it does seem like the only areas we would require mitigation
for is the 467 square feet of ADA beach access and the beach. If we can adjust the mitigation letter, I can attach that
to the file and send the approval letter up the chain to be signed.
Thanks everyone,
Doug
From: Chris Huysman [mailto:chrishuysman@wetlands-waters.com]
Sent: Thursday, December 23, 2021 8:22 AM
To: Amy Staley <astaley@res.us>
Cc: Perez, Douglas J <doug.perez@ncdenr.gov>; David Lach <dlach@res.us>; Jeff.Lineberger@duke-energy.com;
Johnson, Alan <alan.johnson@ncdenr.gov>; Sarah.Santos@duke-energy.com; Steve.Cahoon@duke-energy.com;
Tami.Styer@duke-energy.com; Williams, Kelly <kelly.williams@ncdenr.gov>; brian.couture@duke-energy.com; Daniel
Ramsay <dramsay@res.us>
Subject: Re: [EXTERNAL] Re: Duke Energy South Point Access Area Mitigation
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
3
Doug -
The SOA covers more mitigation than we need based on my review of the plans this morning.
Please give me a call and we can go over this in more detail with the plans in front of us.
Some of the buffer impacts for walkways do not necessarily require mitigation because they are less than 6 feet wide
in the buffers. I was able to measure the widths on the plans this morning and confirm that impacts at B3, B4, B5, and
B7 are 6 feet wide based on the submitted plans. I double checked the numbers based the plans and found that the
engineer measured the longest length of walkway within the buffer and that is where the impact lengths were derived
from. For example, at impact B3, the total square footage of impact is 250 square feet over 68 linear feet which gives
an average width of buffer impact as 3.676 feet. (250 / 68).
All that being said, I think that the mitigation is limited to the beach and the 467 square feet of beach access walkway
since it does exceed 8 feet in width.
Look forward to talking with you -
On Wed, Dec 22, 2021 at 9:24 PM Amy Staley <astaley@res.us> wrote:
Chris and Doug,
I have attached the updated SOA, please let us know if we can help you with anything else.
Thank you and happy holidays,
4
Amy Staley
Office Coordinator II
RES I res.us
Direct: 919.209.1055
Restoring a resilient earth for a modern world
From: Chris Huysman <chrishuysman@wetlands-waters.com>
Sent: Wednesday, December 22, 2021 5:30 PM
To: Perez, Douglas J <doug.perez@ncdenr.gov>; Amy Staley <astaley@res.us>
Cc: David Lach <dlach@res.us>; Jeff.Lineberger@duke-energy.com; Johnson, Alan <alan.johnson@ncdenr.gov>;
Sarah.Santos@duke-energy.com; Steve.Cahoon@duke-energy.com; Tami.Styer@duke-energy.com; Williams, Kelly
<kelly.williams@ncdenr.gov>; brian.couture@duke-energy.com
Subject: [EXTERNAL] Re: Duke Energy South Point Access Area Mitigation
Doug -
Forwarding this to Amy over at RES.
Amy -
Can you please revise the SOA accordingly and reply to all.
Thanks and I will be available tomorrow should anyone need anything.
Thanks again and Happy Holidays.
On Wed, Dec 22, 2021 at 4:03 PM Perez, Douglas J <doug.perez@ncdenr.gov> wrote:
Hello All,
Thanks for getting the mitigation letters to us, however I did notice a few mistakes. First, mitigation for zone i
of the Catawba Riparian Buffer is a z:I ratio. Second, mitigation should be for both the beach AND the walkways
5
as they are over 6 feet wide. So, by my calculations and the most recent impact table that was given to me, the
breakdown should be as follows:
Compensatory
Mitigation Required
River and Sub -Basin
Number
Ratio Corrected
Mitigation Required
Zone 1 Buffers
Beach
Pedestrian Trail
11,635 sq. ft
10,241 sq. ft.
1,394 sq. ft.
Catawba 03050101
2:1 ratio
23,270 sq. ft. (total)
20,482 sq. ft.
2,788 sq. ft.
Please send a new, updated letter from whichever bank or banks you will be requesting from. I need to word the
information for the mitigation bank correctly and depending on which bank or banks that is will change the
wording.
Thanks,
Doug Perez
DWR
DMMoo o1 Water Rcsou MCA
Doug Perez - Environmental Specialist
NC Dept. of Environmental Quality (NCDEQ)
Division of Water Resources - Water Quality Regional Operations
616 East Center Ave., Suite 301, Mooresville, NC z81i5
Phone: (704) 2,35-2162 Fax: (704) 663-6040
E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third
parties unless the content is exempt by statute or other regulation.
Chris Huysman
6
336.406.0906
170 Dew Drop Road
Sparta, NC 28675
chrishuysman@wetlands-waters.com
chris.huysman@gmail.com
wetlands-waters.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby
notified that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please
immediately notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete
this message. Thank you for your cooperation and consideration.
Chris Huysman
336.406.0906
170 Dew Drop Road
Sparta, NC 28675
chrishuysman@wetlands-waters.com
chris.huysman@gmail.com
wetlands-waters.com
7
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified
that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please immediately
notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message.
Thank you for your cooperation and consideration.
Chris Huysman
336.406.0906
170 Dew Drop Road
Sparta, NC 28675
chrishuysman@wetlands-waters.com
chris.huysman@gmail.com
wetlands-waters.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the
individual or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified
that any dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please immediately
notify us by return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message.
Thank you for your cooperation and consideration.
Chris Huysman
336.406.0906
170 Dew Drop Road
Sparta, NC 28675
chrishuysman@wetlands-waters.com
chris.huysman@gmail.com
wetlands-waters.com
The information contained in this email message is confidential and may be legally privileged and is intended only for the use of the individual
or entity named above. If you are not an intended recipient or if you have received this message in error, you are hereby notified that any
dissemination, distribution or copy of this email is strictly prohibited. If you have received this email in error, please immediately notify us by
return email or telephone if the sender's phone number is listed above, then promptly and permanently delete this message. Thank you for
your cooperation and consideration.
8
Compensatory
Rive' and Sub Basin
Ratio Corrected
Mitigation Required
Number
Mitigation Required
Zone l Buffers
10,708 N.ft
Catawba03050101
21,416 sq. R(rotal)
Beach
10,241 N. &
2:1 rado
20,482 sq. R
Pedestrian Trail
467 sq.k
934 sq.R
Compensatory
Mverand Sub -Basin
Raba Corrected
Mitigation Required
Number
Mitigation Required
Zone l Buffers
11,635 sq.R
Catawba 03050101
23,270 sq. &(twal)
Beach
10,241 sq. R
2:1 ratio
20,482 sq. R.
Pedestrian Trail
1,394 sq. R.
2,780 sq.R
fires
EBX Buffer Mitigation Banks
Statement of Availability January 4, 2022
NC Division of Water Resources
Alan D. Johnson
610 East Center Ave., Suite 301
Mooresville, NC 28115
Re Project: South Point Access Area
This document confirms that Duke Energy (Applicant) for the South Point Access Area (Project) has
expressed an interest to utilize 21,416 Square Feet of Riparian Buffer Mitigation Credits from the
following bank, RES Dogtown Buffer Mitigation Bank. The specific bank site that may be debited
Dogtown, that is located in the Catawba River watershed, specifically HUC 03050101. As the official
Bank Sponsor, EBX, attests to the fact that mitigation is available for reservation at this time.
These mitigation credits are not considered secured, and consequently are eligible to be used for alternate
purposes by the Bank Sponsor, until payment in full is received from the Applicant resulting in the
issuance of a Mitigation Credit Transfer Certificate by the bank acknowledging that the Applicant has
fully secured credits from the bank and the Banker has accepted full responsibility for the mitigation
obligation requiring the credits/units.
The Banker will issue the Mitigation Credit Transfer Certificate within three (3) days of receipt of the
purchase price. Banker shall provide to Applicant a copy of the Mitigation Credit Transfer Certificate and
a documented copy of the debit of credits from the Bank Official Credit Ledger(s), indicating the permit
number and the resource type secured by the applicant. A copy of the Mitigation Credit Transfer
Certificate, with an updated Official Credit Ledger will also be sent to regulatory agencies showing the
proper documentation.
Please contact me at 854-900-3222 or dlachAres.us if you have any questions.
Best,
VC "���
David Lach
Resource Environmental Solutions, LLC
701 E. Bay Street, Suite 306
Charleston, SC 29403
Bank Sponsor — Environmental Banc & Exchange (EBX)