Loading...
HomeMy WebLinkAbout20140076 Ver 1_Shoreline Stabilization_20140123State of North Carolina DWR Department of Environment and Natural Resources Division of Water Resources 15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10 -2013 Shoreline Stabilization Application Form Four copies of the application (including attachments) and the application fee should be sent to: Division of Water Resources 401 & Buffer Permitting Unit 1650 Mail Service Center Raleigh, NC 27699 -1650 I. Applicant Information [15A NCAC 02H .0502(a)] 1. Owner Information Name: Peter Seidel Mailing Address: 100 Ecklin In. Cary NC 27519 Telephone Number E -mail Address: 919 - 624 -0429 pseidel94 @gmail.com 2. Agent/ Contact Person Information Fax Number: A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http: / /www saw usace army. mil / Portals /59 /docs /reguiatory /regciocs /Permits /SAMPLE AGENT AUTH ORIZATION FORM.pdt) must be attached if the Agent has signed this application form. Name: NA Company Affiliation: Mailing Address: Telephone Number: E -mail Address: Person to receive the Certification Approval: NA II. Project Information [15A NCAC 02H .0502(a) & (b}] 1. Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, FORM: SSGP 10 -2013 Page 1 of 4 and construction access corridors. You may use the diagram provided at the end of this application form. 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) 4. Location of the property (where work is to be conducted) County: Person Nearest Town: Semora Subdivision name or site address (include phase /lot number): Talley Pointe / Lot #22 Directions to site - please include road names and numbers, landmarks, etc.: From Roxboro take Hwy 57 North (Semora Rd.) - Cross the Hyco lake 3 times and at the top of the hill take a left on Rainey Ridge. Next right onto Barefoot Landing. Next right into Talley Pointe. Next right onto North Stillwood. Second to last lot on the left. 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): undeveloped, zoned residential 6. Property size (acres): 1.08 acres 7. Lake/ river/ ocean adjacent to property: Hyco Lake 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): Dredge to 6 foot depth at normal water level in area where boathouse will be built. Install rip rap along shoreline. 9. Will work be conducted from land? ❑X From water? ❑ 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 4500 square feet 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres: 1000 square feet 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): Vegetation above normal pool lake level is grass. No trees will be removed as part of this work. 1 t 1/16/2014 Owner /Agent's Signature* [15A NCAC 02H .0502(f)] Date Agent's signature is valid only if on authorization letter from the owner is provided. FORM: 5SGP 10 -2013 Page 2 of 6 Vicinity Map 336 1 7. FORM: SSGP 10-2013 Page 3 of 6 Site Plan Hyco Lake Boat House (At Full Pond / Normal Water Level) 34ftx48ft Full Pond/ Normal Water Level Shoreline Cleared Area 8ftx120ft Talley Pointe Lot #22 Area Rip Rap 3ftx120ft Below full pond / NWL Rip Rap 3ftx120ft Above full pond / NWL Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft) *: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10 -2013 Page 4 of 6 Photographs of Shoreline FORM: SSGP 10-2013 Page S of 6 Photograph of Shoreline Indentation Note: No work will be done in this section, unless rip rap is required. t , FORM: SSGP 10 -2013 Page 6 of 6