HomeMy WebLinkAbout20140074 Ver 1_401 Application_20140114Needham Environmental Inc.
Robert N. Needham, PWS
9100 Charlestowne Rd. SE
Winnabow, NC 28479
Office/Fax (910)371 -6082
needhambud@ec.rr.com
Mickey Sugg
Regulatory Specialist
US Army Corps of Engineers
Wilmington Regulatory Field Office
69 Darlington Ave
Wilmington, NC 28403
Tom Gulley, NCLSS# 1256
P.O. Box 960
Wilmington, NC 28402
Office/Fax (910)795 -0319
tgulley @gmail.com
January 15, 2014
RE: PCN Form and Supporting Documentation for 160 Big Hammock Road (SAW- 2014 -
00017), Onslow County, North Carolina.
Dear Mickey: + -
Enclosed is the PCN Form and supporting documents for 160 Big Hammock Road. kowaL- -*
unavoidable to place this home on the lot, without impacting a small area of wetlands. The home
has been placed at the front building setback and a retaining wall will be used to minimize the
footprint of the wetland impact.
If you have any questions or concerns, I can be contacted at (910)795 -0319, (910)297 -1282, or by
e -mail at tgulley&gmail.com.
cc: NC DWQ (five copies)
Catherine Young
Sincerely,
J. Tom Gulley, Jr.
North Carolina Soil Scientist License# 1256
1:2�
O�C,�W A�TF9
o�<
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
Page 1 of 10
PCN Form — Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the Corps:
❑X Section 404 Permit ❑ Section 10 Permit
1 b.
Specify Nationwide Permit (NWP) number: 18 or General Permit (GP) number:
1 c.
Has the NWP or GP number been verified by the Corps? _T_Z
Yes ❑ No
1 d.
Type(s) of approval sought from the DWQ (check all that apply):
❑X 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express N Riparian Buffer Authorization
1 e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes ❑X No
For the record only for Corps Permit:
N Yes NX No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
N Yes ❑X No
1 g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h
below.
0 Yes ❑ No
1 h.
Is the project located within a NC DCM Area of Environmental Concem (AEC)?
❑ Yes ❑X No
2.
Project Information
2a.
Name of project:
Pelican Point Lot 37 (160 Big Hammock Point Rd)
2b.
County:
Onslow
2c.
Nearest municipality / town:
Sneads Ferry
2d.
Subdivision name:
Pelican Point
2e.
NCDOT only, T.I.P. or state project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
William & Gail Inge
3b.
Deed Book and Page No.
1279/963
3c.
Responsible Party (for LLC if
applicable):
3d.
Street address:
1524 Rogers Road
3e.
City, state, zip:
Graham, NC
3f.
Telephone no.:
3g.
Fax no.:
3h.
Email address:
Page 1 of 10
PCN Form — Version 1.4 January 2009
4.
Applicant Information (if different from owner)
4a
Applicant is
❑ Agent X❑ Other, specify Buyer, property is under contract
4b
Name
Rodger & Catherine Young
4c
Business name
(if applicable)
4d
Street address
2853 Ohara Dr
4e
City, state, zip
Tallahasse, FL 32309
4f
Telephone no
904- 382 -0451
4g
Fax no
4h
Email address
cate07O2 @yahoo com
5.
Agent/Consultant Information (if applicable)
5a
Name
Tom Gulley
5b
Business name
(if applicable)
Needham Environmental, Inc
5c
Street address
P O Box 960
5d
City, state, zip
Wilmington, NC 28402
5e
Telephone no
910- 297 -1282
5f
Fax no
910 - 795 -0319
5g
Email address
tgulley @gmad com
Page 2 of 10
B.
Project Information and Prior Project History
1.
Property Identification
1a
Property identification no (tax PIN or parcel ID)
Parcel ID# 048383, Map# 774A -261
lb
Site coordinates (in decimal degrees)
Latitude 34 5242 Longitude -77 3697
1c
Property size
072 acres
2
Surface Waters
2a
Name of nearest body of water to proposed project
Atlantic Intracoastal Waterway
2b
Water Quality Classification of nearest receiving water
SA
2c
River basin
New River
3.
Project Description
3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application
The property currently consists of a maintained or mowed grassy upland area with a vegetated wetland area with no major canopy trees or saplings
The lot is within a subdivision with existing homes, piers, docks, ect
3b
List the total estimated acreage of all existing wetlands on the property 0 55
3c
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 75
3d Explain the purpose of the proposed project
New construction of a single -family home
3e Describe the overall project in detail, including the type of equipment to be used
Typical, residential, new home construction A small skid -steer will be used to place proposed fill on lot
4
Jurisdictional Determinations
4a
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all nor phases) in the past?
❑X Yes ❑ No ❑ Unknown
Comments Action ID SAW-2014-00017
4b
If the Corps made the jurisdictional determination, what type
of determination was made?
Preliminary ❑ Final
4c
If yes, who delineated the jurisdictional areas?
Name (if known) Tom Gulley
Agency /Consultant Company Needham Environmental, Inc
Other
4d If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation
Corps of Engineers approval dated 1/3/14
S.
Project History
5a
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes ❑ No ❑X Unknown
5b
If yes, explain in detail according to "help file" instructions
6
Future Project Plans
6a
Is this a phased project?
❑ Yes ❑X No
6b
If yes, explain
Page 3 of 10
PCN Form — Version 14 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1a Which sections were completed below for your project (check all that apply)
❑X Wetlands ❑ Streams — tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction
2. Wetland Impacts
If there are wetland Impacts proposed on the site, then complete this question for each wetland area impacted
2a
Wetland Impact
number
Permanent (P) or
Temporary T
2b
Type of Impact
2c
Type of wetland
2d
Forested
2e
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f
Area of
Impact
(acres)
W1 P
Fill
Non -Tidal Freshwater Marsh
No
Corps
00375
W2 -
Choose one
Choose one
Yes /No
W3 -
Choose one
Choose one
Yes /No
-
W4 -
Choose one
Choose one
Yes /No
-
W5 -
Choose one
Choose one
Yes /No
-
W6 -
Choose one
Choose one
Yes /No
-
2g Total Wetland Impacts:
00375
2h Comments
Freshwater Scrub /Shrub wetland adjacent to coastal marsh
3. Stream Impacts
If there are perennial or Intermittent stream Impacts (Including temporary Impacts) proposed on the site, then complete this
question for all stream sites Impacted
3a
Stream Impact
number
Permanent (P) or
Temporary (T)
3b
Type of Impact
3c
Stream name
3d
Perennial (PER) or
Intermittent (INT)?
3e
Type of
jurisdiction
3f
Average
stream
width
(feet)
3g
Impact
length
(linear
feet)
S1
Choose one
-
-
S2
Choose one
-
-
S3 -
Choose one
-
-
S4 -
Choose one
-
-
S5 -
Choose one
-
-
S6 -
Choose one
-
-
3h Total stream and tributary impacts
31 Comments
Page 4 of 10
PCN Form — Version 1 4 January 2009
4. Open Water Impacts
If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then indivi ually list all open water impacts below
4a
Open water
impact number
Permanent (P) or
Temporary T
4b
Name of waterbody
(if applicable)
4c
Type of impact
4d
Waterbody
type
4e
Area of impact (acres)
01 -
Choose one
Choose
O2 -
Choose one
Choose
03 -
Choose one
Choose
04 -
Choose one
Choose
4f Total open water impacts
4g Comments
S. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below
5a
Pond ID number
5b
Proposed use or
purpose of pond
5c
Wetland Impacts (acres)
5d
Stream Impacts (feet)
5e
Upland
(acres)
Flooded
Filled
Excavated
Flooded
Filled
Excavated
P1
Choose one
P2
Choose one
5f Total:
5g Comments
5h Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)
51 Size of pond watershed (acres)
5k Method of construction
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below If yes, then individually list all buffer impacts
below If any impacts require mitigation, then you MUST fill out Section D of this form
6a Project is in which protected basin?
❑ Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other
6b
Buffer Impact
number —
Permanent (P) or
Temporary T
6c
Reason for impact
6d
Stream name
6e
Buffer
mitigation
required?
6f
Zone 1
impact
(square
feet )
6g
Zone 2
impact
(square
feet
B1 -
Yes /No
B2 -
Yes /No
B3 -
Yes /No
B4 -
Yes /No
B5 -
Yes /No
B6 -
Yes /No
6h Total Buffer Impacts:
61 Comments
Page 5 of 10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
Home was pulled forward on the lot to the front budding setback in hopes of avoiding any impact Based on budding setbacks and home size, the
impact was not avoidable Placing the home at the front budding setback minimizes the impact Minimal fill is proposed around the home to also
minimize the impacts
1 b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques
A retaining wall will be placed to the rear of home to minimize the total footprint of the impact
2 Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a Does the project require Compensatory Mitigation for
impacts to Waters of the U S or Waters of the State?
❑ Yes ❑X No
2b If yes, mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
2c If yes, which mitigation option will be used for this
project?
❑ Mitigation bank
❑ Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a Name of Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type Choose one
Type Choose one
Type Choose one
Quantity
Quantity
Quantity
3c Comments
4. Complete if Making a Payment to In -lieu Fee Program
4a Approval letter from in -lieu fee program is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c If using stream mitigation, stream temperature
Choose one
4d Buffer mitigation requested (DWQ only)
square feet
4e Riparian wetland mitigation requested
acres
4f Non - npanan wetland mitigation requested
acres
4g Coastal (tidal) wetland mitigation requested
acres
4h Comments
5. Complete if Using a Permittee Responsible Mitigation Plan
5a If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan
Page 6 of 10
PCN Form — Version 1 4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact within a protected riparian buffer that requires
buffer mitigation
❑Yes E] No
6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
Zone
6c
Reason for impact
6d
Total impact
(square feet)
Multiplier
6e
Required mitigation
(square feet)
Zone 1
3 (2 for Catawba)
Zone 2
1 5
6f Total buffer mitigation required-
6g If buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank,
permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund)
6h Comments
Page 7 of 10
E.
Stormwater Management and Diffuse Flow Plan (required by DWQ)
1
Diffuse Flow Plan
la
Does the project include or is it adjacent to protected riparian buffers identified
❑ Yes ❑X No
within one of the NC Riparian Buffer Protection Rules?
1 b
If yes, then is a diffuse flow plan included? If no, explain why
❑ Yes ❑ No
2.
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
103%
2b
Does this project require a Stormwater Management Plan?
❑ Yes ❑X No
2c
If this project DOES NOT require a Stormwater Management Plan, explain why
This
lot is in an existing subdivision and will only have 10 3% impervious surface
2d
if this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan
2e
Who will be responsible for the review of the Stormwater Management Plan?
3.
Certified Local Government Stormwater Review
3a
In which local government's jurisdiction is this project?
Sneads Ferry/Stump Sound
❑ Phase II
❑ NSW
3b
Which of the following locally - implemented stormwater management programs
❑ USMP
apply (check all that apply)
❑ Water Supply Watershed
❑ Other
3c
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑X No
attached?
4. DWQ Stormwater Program Review
OCoastal counties
❑HQW
4a
Which of the following state - implemented stormwater management programs apply
❑ORW
(check all that apply)
E] Session Law 2006 -246
❑ Other
4b
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑X No
attached?
S.
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements
❑X Yes ❑ No
5b
Have all of the 401 Unit submittal requirements been met?
❑X Yes ❑ No
Page 8 of 10
PCN Form — Version 1 4 January 2009
F. Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
la
Does the project involve an expenditure of public (federal /state /local) funds or the
❑ Yes ❑X No
use of public (federal /state) land?
lb
If you answered "yes" to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes ❑ No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1 c
If you answered "yes" to the above, has the document review been finalized by the
State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter )
Comments
2.
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland Standards,
❑ Yes ❑X No
or Riparian Buffer Rules (15A NCAC 2B 0200)?
2b
Is this an after - the -fact permit application?
El Yes ❑ No
2c
If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s)
3.
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
❑ Yes 0 No
additional development, which could impact nearby downstream water quality
3b
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent DWQ policy If you answered "no," provide a short narrative description
4
Sewage Disposal (DWQ Requirement)
4a
Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated from
the proposed project, or available capacity of the subject facility
Sewer
wio be provided by the ONWASA Holly Ridge Plant
Page 9 of 10
PCN Form — Version 1 4 January 2009
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected species or
❑ Yes X❑ No
habitat?
5b Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ❑X No
impacts?
5c If yes, indicate the USFWS Field Office you have contacted
-
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
USFWS Critical Habitat Mapper
6. Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑ Yes ❑X No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
This Activity is located more than 75' from the normal high waterline The EFH online viewer was used
7 Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ❑X No
status (e g , National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would impact historic or archeological resources?
NCSHPO HPOWEB Viewer
8. Flood Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA- designated 100 -year floodplain?
❑X Yes ❑ No
8b If yes, explain how project meets FEMA requirements
Home will be constructed to the appropriate flood elevation Proposed project area is in an AE Zone
8c What source(s) did you use to make the floodplain determination?
Onslow County Online GIS
L I 6AA1
I tj
Applicant/Agent's Printed Name
Date
Applicant/ gent's Signature
(Agent's signature is valid only if an authorization
letter from the applicant is provided
Page 10 of 10
Needham
Environmental, Inc.
Main Office/Fax (910) 795 -0319
Tom Gulley — tguileykggmail corn
P.O. Box 960, Wilmington. NC. 28402
Agent Authorization Form
TO WHOM IT MAY CONCERN:
I /we, the undersigned, hereby authorize Needham Environmental, Inc. to act as our agent
in the preparation and representation of information related to the below listed tract. This
authorization grants permission for the USACE to enter the property for the purposes of
jurisdictional wetlands determination as well as review of any areas that may be included in
a 404/401 or CAMA permits. This authorization, for liability and professional courtesy
reasons, is valid only for government officials to enter the property when accompanied by
staff of Needham Environmental, Inc.
TRACT NAME:
Pelican Point Lot 37 Onslow Co. Parcel iD# 048383
TRACT LOCATION:
160 Big Hammock Rd
OWNER /APPLICANT:
SIGNATURE:
DATE: '
1
1km SS 1
i S111�S'�1
u
l .=
�1
1 ?�
3U� =
r
SITE
Maq Source: Onslow County GIS Online
Needham Environmental, Inc.
160 Big Hammock Point Rd Environmental Consultants Site Location
Onslow County, NC Wilmington, N.C.
03-13-053 /COE Package.cdr January 2014
Needham Environmental, Inc.
160 Big Hammock Point Rd Environmental Consultants Generalized Soils Map
Onslow County, NC Wilmington, N.C.
03-13-053 /COE Package cdr I January 2014
Property Boundary Shown in Yellow.
Needham Environmental, Inc.
160 Big Hammock Point Rd Environmental Consultants
Onslow County, NC Wilmington, N.C. 2012 Color Aerial
03- 13- 053 /COE Package .cdr January 2014
Needham Environmental, Inc.
160 Big Hammock Point Rd Environmental Consultants New River Inlet
Onslow County, NC Wilmington, N.C. USGS Quad Sheet
03-13-053 /COE Package.cdr I January 2014
IRACOASTAL WATERWAYSI
AO.AINFRS EXISTING
BULKHEAD
SIS 3 4"923. I,, 77.e,•
TW-Amr LN 4� EIS .. ACOBRA ZONE UNE
1- rEL 10) •}� -- _ _
I�
LOT 37
C R 1279, -.953
M.R. 30. P. 73, SL. 0 -211
`-�
31.448.18 S -F.
0.72 ACRES
10NEC - R15 'oo�
W I LO
T g PELICA
INNEY ii I ERICK REESE ABER
MCKINNEY Y 4 # G.B. 38
gB �, MEAN HIGH WATER UNEI c M.9. 30, P,
G-211 �, I !FUG LOCATED 7/14/13 n
5EE NOTE 'A' 15B RIG HAMA
^.IYT R0. SNEACS FUR
28460 \ I z ZONEC
EIS ON LINE
ft 4'- WEILAY:s L.B _.1i1 CAVA SETBACK LINE
_.T 4E 10) SEE NOTE 'A'
\V r —
iTiACOASTAL WATERWAY ', � �' C+ t- o9�� WIS q/ ,MO' _
IGHT OF WAY LINE Cl , f'7W4' - - 4�A WETLANDS
!'> �, +(i+ 'AETLAN05 LINE
- - m CAMA UNE i L2;/ - N'ETLANO +NYACT ari_A 0.375 acres) finished grade
will be at the 5'contour
WETLANDS . w] 75' AEC LINE
Fitt LANE 7D BE TO• S'EE NOTE 'A'
EXISTING HOUSE _ tt°PENW9 MOUSE _ l Retaining wall or vegetated soil
sloped at a 1.5:1 ratio, with silt
S " - fence place at base during construction
q4i� J
17 SC' AF.- p
we Rio EJ0571NG HOUSE
W5 WT d
ADJOINERS EXISTING LL IU W I p 33.58' s
WOOD HEADWA N•s % I -
N I p V) NETLAhC_i 111 L
-
g > gQS- LINE 'x 4
�0,
JI N y
.9.58 W,,
30.00' ° 3459 J r o
25' MBL .....- :: :. -:::: 25. M4L i -y-
r250 ii.:iij; 3'.3' lY
UNDE ^ /
...:.:.:..:.:..:: RGROUND
o
Y rORIVEWAY: ELEC. BOX ,�
cog EIS N 33'15'58' E 7501' ABLE BOX EIS
4�-�
IG HAMMOCK POINT ROAD - 50' R W J _ 1" - 60'
- - - -7
589.49' TO R/W OF
z SHELL DRIVE (M.8.30. P
EIS NFedham Environmental, Inc.
160 Big Hammock Point Rd Environmental Consultants Wetland Impact
Onslow County, NC Wilmington, N.C. Overview Map
03- 13 -053 /COE Package.cdr January 2014
U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id. SAW - 2014 -00017 County Onslow U.S.G.S, Quad NC -NEW RIVER INLET
NOTIFICATION OF JURISDICTIONAL DETERMINATION
Applicant: Roger and Catherine Young
Address: 2853 Obara Drive
Tallahasse. FL. 32309
Size (acres) 0.72 Nearest Town Sneads Ferry
Nearest Waterway AIWW River Basin New. North Carolina.
USGS HUC 3030001 Coordinates 34.523930 N, - 77.364152 W
Location description: The property is located at 160 Big Hammock Point Road in Sneads Ferry. Onslow County.
North Carolina. Parcel #: 774A -2
Indicate Which of the Followinz App:
A. Preliminary Determination
_ Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have
this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a
jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action
under the Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331) If you wish, you may request
an approved ID (which may be appealed), by contacting the Corps district for further instruction. Also, you may provide
new information for further consideration by the Corps to reevaluate the JD
B. Approved Determination
X There are Navigable Waters of the United States within the above described property subject to the permit requirements of
Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or
our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this
notification
X There are waters of the U.S including wetlands on the above described property subject to the permit requirements of
Section 404 of the Clean Water Act (CWA)(33 USC § 1344) Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification
_ We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our
present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely
delineation, you may wish to obtain a consultant. To be considered final. any delineation must be verified by the Corps.
_ The waters of the U S including wetlands on your project area have been delineated and the delineation has been
verified by the Corps We strongly suggest you have this delineation surveyed. Upon completion, this survey should be
reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to
CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be
relied upon for a period not to exceed five years
X The waters of the U.S including wetlands have been delineated and surveyed and are accurately depicted on the plat
signed by the Corps Regulatory Official identified below on January 3, 2014 Unless there is a change in the law or our
published regulations, this determination mar be relied upon for a period not to exceed five years from the date of this
notification
_ There are no waters of the U,S., to include wetlands, present on the above described project area which are subject to the
permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our
published regulations. this determination may be relied upon for a period not to exceed fire years from the date of this
notification
X The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act
(CAMA) You should contact the Division of Coastal Management ui Morehead City. NC, at (252) 808 -2808 to
determine their requirements
Page 1 of 2
Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may
constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this
determination and/or the Corps regulatory program, please contact David Bailey at 910- 2514469 or
Dayid.E.Bailey2Cri usace.a rmy.miL
C. Basis For Determination: The site exhibits features with Mean fth Water and wetland criteria as defined in
the applicable Re i nal Supplement to the 1987 Corps Wetland Delineation Manual. The waterg on site Include the
Atlantic Intracoastal Waterway, a Tradition llv Navizable Waterway, and ad scent wetlands. This determination is
based on an office verification by David E. Bailey (USACE) on 10/28/2013.
D. Remarks: The wetlands and other Waters of the US on the property were flagged by Tom Gulley (Needham
Environments
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps' Clean Water Act jurisdiction for the
particular site identified in this request. The delmeation/detenmuiation may not be valid for the wetland conservation
provisions of the Food Security Act of 1985 If you or your tenant are USDA Program participants, or anticipate participation
in USDA programs. you should request a certified wetland determination from the local office of the Natural Resources
Conservation Service, prior to starting work
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in
B. above)
This correspondence constitutes an approved jurisdictional determination for the above described site If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331 Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form If you request to appeal this
determination you must submit a completed RFA form to the following address-
US Army Corps of Engineers
South Atlantic Division
Attn. Jason Steele, Review Officer
60 Forsyth Street SW, Room 1OM15
Atlanta, Georgia 30303 -8801
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for
appeal under 33 CFR part 3315, and that it has been received by the Division Office within 60 days of the date of the NAP.
Should you decide to submit an RFA form, it must be received at the above address by March 4, 2014
"It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this
correspondence **
Corps Regulatory Official:'
Date January 3, 2014 Expiration Date, January 3.2019
The Wilmington District is committed to providing the highest level of support to the public To help us ensure we continue to
do so, please complete the attached customer Satisfaction Survey or visit hgp 'per? riu p usace- armi mil survey h_ tml to
complete the survey online
Copy furnished
Joanne Steenhuis, NCDENR -DWR, 127 Cardinal Drive Extension, Wilmington, NC 28405
William Inge. 1524 Rogers Road, Graham- NC 272533
Tom Gulley Needham Environmental, Inc., P 0 Box 960, Wilmington. NC 28402