Loading...
HomeMy WebLinkAbout20210023 Ver 3_Mitigation Bank Instrument_20210711Mitigation Project Information Upload ID#* 20210023 Select Reviewer:* Version* 3 Katie Merritt Initial Review Completed Date 10/04/2021 Mitigation Project Submittal - 7/11/2021 ................................................................................................................................................................................................................................................................. Is this a Prospectus, Technical Proposal or a New Site?* a Yes r No Type of Mitigation Project:* r Stream r Wetlands rJ Buffer 17. Nutrient Offset (Select all that apply) Project Contact Information Company/Owner:* Wildlands Engineering Contact Name:* Andrea Eckardt Project Information Project Type: Project Name: County: r DMS ( Mitigation Bank Anderson Farms II Mitigation Site Wayne Document Information Mitigation Document Type:* Mitigation Bank Instrument File Upload: Signature Print Name:* Signature:* Email Address:* aeckardt@wildlandseng.com Anderson Farms II Draft MBI 6.29.2021.pdf 309.61 KB Rease upload only one R7Fof the corrplete file that needs to be subnitted... Andrea Eckardt