HomeMy WebLinkAbout20210915 Ver 1_USACE Permit_20211228Strickland, Bev
From: Bailey, David E CIV USARMY CESAW (USA) <David.E.Bailey2@usace.army.mil>
Sent: Tuesday, December 28, 2021 2:45 PM
To: Jennifer Robertson; Holden Sabato
Cc: Homewood, Sue
Subject: [External] Provisional Nationwide Permit 39 Verification, SAW-2019-02059, Reedy
Fork Industrial / 5955 Summit Avenue / Greensboro / Guilford County
Follow Up Flag: Follow up
Flag Status: Flagged
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
Report Spam.
Mr. Sabato and Ms. Robertson,
This is a provisional general permit verification. Your proposed work may be authorized by the above referenced general
permit provided a 401 Certification is issued or waived. Once a 401 Certification is issued or waived, the Corps will
provide you with a final general permit verification. Your proposed work shall not commence until after the 401
Certification has been issued or waived AND a final general permit verification has been provided to you. Additional
special conditions would be added to the final general permit verification, including those requiring compensatory
mitigation for wetland impacts and implementation of the proposed stream relocation using natural channel design.
Please contact me if you have any questions regarding this provisional verification or the Corps of Engineers regulatory
program.
Sincerely,
Dave Bailey
David E. Bailey, PWS
Regulatory Project Manager
US Army Corps of Engineers
CE-SAW-RG-R
3331 Heritage Trade Drive, Suite 105
Wake Forest, North Carolina 27587
Office: (919) 554-4884, Ext. 30.
Mobile: (919) 817-2436
Fax: (919) 562-0421
Email: David.E.Bailey2@usace.army.mil
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey is
located at: https://regulatory.ops.usace.army.mil/customer-service-survey/
Thank you for taking the time to visit this site and complete the survey.
i