HomeMy WebLinkAbout820640_Sludge Survey (Reporting)_20211220Smithfield.
Good food. Responsibly®
Sonar Sludge Survey Reporting Form
Farm or Permit Number:
Lagoon I.D. Number:
Person taking measurements: Staff
Date of Measurements:
Methods/Devices used for measurement of: Sonar
Number of measurement data points:
Distance from the present liquid level to the top of sludge:
A. Start Pump Level:
B. Stop Pump Level:
C. Current Freeboard Level:
D. 1/2 Treatment Level:
E. Average Sludge Level:
If pump intake level is <2.5 ft a plan of action is required.
If value for E is greater than D then sludge levels are in Compliance.
If value for E is equal to or less than D then a Plan of Action is required.
Volume of sludge to be removed to reach compliance
Completed by: Michael Norris
Print Name
AWS820640
51
12/20/2021
680
2.96 feet
19.32 inches
50.40 inches
54 inches
94.20 inches
89.52 inches
1.6 feet
557,120 Gallons
186 Dry Tons
Signature Date
Retention: 5 years Original: 5/21/19
PLAN OF ACTION (POA) FOR LAGOON SLUDGE REDUCTION
Facility Number: AWS820640
Facility Name: S1
Certified Operator Name: Smithfield
Operator #:
County: Sampson
**Attach a copy of Lagoon Sludge Survey Form and volume worksheets
Note: A certified Sludge Management Plan may be submitted in lieu of this POA.
Lagoon 1
Lagoon 2
Lagoon 3
Lagoon 4
Lagoon 5
Lagoon 6
a. Lagoon Name/ Identifier
S1
b. Total Sludge Depth (ft)
c. Sludge Depth to be
Removed for Compliance
(in)
4.68
d. Sludge Volume to be
Removed (gallons)
557,120
e. Sludge PAN
(Ibs./1000 gal)
10
f. Liquid PAN
(Ibs./1000 gal)
2
g. PAN of Sludge (Ibs.)
(d x e)/1000
5,571.20
Compliance Timeframes:
If the sludge level is equal to or higher than the stop pump level of the lagoon or if the sludge level results in
an elevated waste analysis, a sludge management plan that meets the requirements of SB Interagency
Group Guidance Document 1.26 must be prepared by a technical specialist and submitted to DWR within 90
days. Work to reduce the sludge level must begin within another 180 days. Compliance with NRCS
Standard 359 must be achieved within two years of the original sludge survey.
If the sludge level is non -compliant but below the stop pump level of the lagoon, a POA must be filed within
90 days and compliance with NRCS Standard 359 must be achieved within two years of the original sludge
survey indicating non-compliance. If future sludge surveys do not show improvement in sludge levels, DWR
may require the owner to develop a sludge management plan that meets the requirements of SB
Interagency Group Guidance Document 1.27.
SPOA 9-15-2016 Page 1 of 3
NARRATIVE: Use this section to describe the method(s) that will be used to lower the sludge depth. If microbe
use is planned, specify the product to be used.
1) Sludge Management Plan (In accordance with NRCS Standard 359, Sludge Management Guidance) Continue
current lagoon management and monitoring of sludge as long as:
A) the sludge level is less than the stop pump level of the lagoon,
B)nutrient values of the lagoon effluent are within the normal operating range,
C) there is no noticeable increase in lagoon odor,
D)a minimum 2.5 ft deep zone, free of sludge, at the pump intake is maintained, and
E) nutrients applied from lagoon are properly accounted for in the application plan (NUP).
2) Sludge Removal- Within 90 days of not maintaining the items listed in the above sludge management plan, one of
the following options will commence:
A) Mechanical Removal by Pump and Haul - a sludge utilization/application plan will be developed that identifies land in
the vicinity of the lagoon that will allow for the application of the agitated/mixed sludge layer of the lagoon.
Implementation of the plan will commence within another 180 days. Records will be kept of these applications as
required by the permit.
B) Mechanical Removal by Dewatering - sludge will be removed by dredge or lagoon agitator pump then mixed with
polymer and pumped into geotextile tubes (bags) for dewatering, as outlined in the Management Plan of the Distribution
of Animal Residuals Solids Permit, #WO0037487. After curing for approximately 6 months solids will be distributed
within 2 years either
i) as a Class A material in accordance with permit #WQ0037487, or
ii) if the solids do not meet Class A standards, in accordance with a sludge utilization/application plan for
land application.
I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to
the best of my knowledge and ability, the information is accurate and correct. I further certify and acknowledge that
compliance with regard to sludge accumulation must be achieved within two years of the original sludge survey
indicating non-compliance.
Sludge Surveypate: f 4 �?2/20/2021 Compliance Due Date: 12/20/2023
1
Smithfield
Facility Owner/Manager (print)
Facility Owner/Manager (signature)
NPDES Permitted Facilities
Return this form to:
Animal Feeding Operations Program
NC Division of Water Resources
1636 Mail Service Center
Raleigh, NC 27699-1636
Phone: 910-293-3434
Date:
State Permitted Facilities
Return this form to:
NC Division of Water Resources
at the appropriate Regional Office
(see following page)
SPOA 9-15-2016 Page 2 of 3
DIVISION OF WATER RESOURCES REGIONAL OFFICES (09/2016)
Counties served by each Regional Office
Asheville Regional Supervisor
2090 U.S. Highway 70
Swannanoa, NC 28778
(828)296-4500
Fax (828) 299-7043
Avery
Buncombe
Burke
Caldwell
Cherokee
Clay
Graham
Haywood
Henderson
Jackson
Macon
Madison
McDowell
Mitchell
Polk
Rutherford
Swain
Transylvania
Yancey
Fayetteville Regional Supervisor
225 Green Street, Suite 714
Fayetteville, NC 28301-5094
(910) 433-3300
Fax (910) 486-0707
Anson Moore
Bladen Richmond
Cumberland Robeson
Harnett Sampson
Hoke Scotland
Montgomery
Winston-Salem Regional Supervisor
450 Hanes Mill Road, Suite 300
Winston-Salem, NC 27105
(336) 776-9800
Fax (336) 776-9797
Alamance Rockingham
Alleghany Randolph
Ashe Stokes
Caswell Surry
Davidson Watauga
Davie Wilkes
Forsyth Yadkin
Guilford
Washington Regional Supervisor 943
943 Washington Square Mall
Washington, NC 27889
(252) 946-6481
Fax (252) 975-3716
Beaufort Jones
Bertie Lenoir
Camden Martin
Chowan Pamlico
Craven Pasquotank
Currituck Perquimans
Dare Pitt
Gates Tyrell
Greene Washington
Hertford Wayne
Hyde
Mooresville Regional Supervisor
610 East Center Avenue, Suite 301
Mooresville, NC 28115
(704) 663-1699
Fax (704) 663-6040
Alexander Lincoln
Cabarrus Mecklenburg
Catawba Rowan
Cleveland Stanly
Gaston Union
Iredell
Raleigh Regional Supervisor
1628 Mail Service Center
Raleigh, NC 27699-1628
(919) 791-4200
Fax(919)571-4718
Chatham Nash
Durham Northampton
Edgecombe Orange
Franklin Person
Granville Vance
Halifax Wake
Johnston Warren
Lee Wilson
Wilmington Region Supervisor
127 Cardinal Drive Extension
Wilmington, NC 28405-3845
(910) 796-7215
Fax (910) 350-2004
Brunswick New Hanover
Carteret Onslow
Columbus Pender
Duplin
SPOA 9-15-2016
Page 3 of 3