HomeMy WebLinkAbout20070497 Ver 1_Certification of Completion_20070727,` /
B~hs
' Certification of Completion aT ~
•DWQ Project No.: O `l G i1~1 ~~ County: O n ~,~c -„~ C a,;,-~-y
Applicant: ~_I~c.~.. 5~fc;~<~, Nc. ~i7'~.,s;c+:~ G~ i~ct~.~ ~~r`~ ~i.•ec.r~c;~.c;.-,
Project Name: C_e •.~.~ Ci-.c;r.~e,~ ~.. M ~r - .~.~ ~ ~ c~c~ ~.. Mc,:r+~'e.~nnCC ~
rc'~ e.~~
Date of Issuance of Isolated Wetland Permit: i"~ c:.r c ~. 7` l'.a :~~c °i
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any
subsequent modifications, the applicant is required to return this certificate to the 401/Wetlands Unit, North Carolina
Division of Water Quality, i650 iVlail Service Center, Raleigh, NC, 2%699-160. 'This form may be returned to DWQ by
the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of
these.
Applicant's Certification
I, 1-'r~~t v~ ~-. S ~"'~~~ ,hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other sup g ma erials. x2
,ignature: - Date: / , ~ ~ ~ ~ `
Agent's Certification
I, ~ c» ~ ~ t~ o nip ~.1 \ `~, ,hereby state that, to the best of my abilities, due care and diligence was
used in the observation of the cons ction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications,
and other sup ing materials.
Signature: '~ . C-6--.- - Date: ~j' - '~. 5 ~- o c* ~
If this project was designed by a Certified Professional
I, NF.kL. w. /a(-~oi~w as a duly registered Professional GNGww~ (i.e., Engineer,
Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically,
weekly, full time) the construction of the project, for the Permittee hereby state that, to the best of my abilities, due care
and diligence was used in the observation of the construction such that the construction was observed to be built within
substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials. r~
Signature: .p,~ Registration No. Z~S~~ Date ZS ~
,~ '7~?:r~,~.,,~,'~,:e~ ~~ ,