Loading...
HomeMy WebLinkAboutGW1-2021-00037_Well Construction - GW1_20211109 WELL CONSTRUCTION RECORDGW-11 internal use only: CONSTRUCTION 11 Contractor information: 1.We 14.WATERZONES Joseph Bailey FROM TO DESCUPTION I f, I ft. e - Wcl I Contractor Name ft. ft. 3271-A I iz—OUTER G ASMG, nail&. OR LWER MATERIAL NC Well Contractor Certification Number FROM TO DIAMETERTHICKNESS B & K Well Drilling Inc 0 f 1. ft 61/4 SDR-21 P.VC:�,:' .4h I&JNn� R-CAl OR: 61) Company Name FROM ft. T ft. DIAMETER in. THICKNESS MATERIAL Permit#: 2.Well Construction P tion permits(i.e.UIC,C010�v,-�'ole. ....... ft. in. all applicable well const7.itc. List.11 applicable-11 con. ft 3.Well Use(check well use): 47;1SCRIEEN1- THICKNESS MATERIAL FROM TO DIAMETER SLOTSIZE in. Water Supply Well: ft. ft. 'y Well: M 1/Public IC n in. ClAgricultural U oq;�,�sidentiall Water Supply(single) ft. ea C 0G,Othermal(Ijeating/Cooling SUPPIY) oResidential Water Supply(shared) UT CEM METHOD 1&GRO j%.&TERIAL ENT METHOD&A OIJNT 7 EMPLA 0 b omon lildustrial/COmmerrlal 0WeIIS>1 o0,000 GPD FROM TO Pour C❑ 0 1 ft. 20 ft. Ben ni e ]Irri ation Non-Water Supply Well: ORecoverY ft. ft. 0M011itoring Injection Well: ClGroundwater Rcinediation 19 NDI VF1 []Aquifer Recharge [3 Salinity Barrier FROM TO MA IAI. 0AqUifer Storage and Recovery [3Stormwater Drainage ft. t. 0 Aquifer Test ft. ft. oSubsidence Control a' Experimental Technology �,ttieh,idditi sl C3 oTracer .70,DRML.AN6.C DFSCRI O\. soil/rockrypegra ..FROM TO (color,hardness, DGeothermal(Closed LOOP) o0thcr(explain under#21 Remarks) ft. ft. Mcotlicn-nal(1-1catillg/Cooling Return) - ft. ft d'm QJ 1) 4.Date Well(s)Completed: Well ID4 ft. ft. fd 5a Well Location: ft ft. �cility im(if applicabl,c) ft. ft. le ft fit Facility/ownerNarric e P Alr 04 'n ft. ft Physical Ad C' and Zip ZI REMARKS::? Ity, 4& paccl Identification No.(PIN) County ngitude in degrees/minutes/secondi or decimal degrees: 22.certification: 5b.Latitude and lo (if well field,one lat/10ng is sufficient) W ------------- N Date St ure Of nice onrractor I- 07remporary - at the (were)constructed in accordl 6.ls(arc)thewell(s): vg—..ent or B signing thisficrin.I herehi,cert and that I copy 15A NCAC 02C.0100 or ISA NC AC 02C.0200 H'ell CM'strl Standard" 7.Is this a repair to an existing well: OYes or () this record has been provided to the.well ow77er if this is a repair,fill Out known well construction information and explain the name nl the it or on the back of this for- 23.Site diagram or additional well details: pag You provide additional well construction info repair under i:21 remarks sectiO You may use the back of this ' e 8.For Geoprobell or Closed-Loop Geothermal Wells having The same (add'See Over'in Remarks Box).; may also attach additional pages if necessary construction,only I GW_l is needed. Indicate TOTAL NUMBER of wells 24.SUBMITTAL INSTRUCTIONS drilled: 1A< ..— ) (ft') Submit this GW-I within 30 days of well completion per the following: 9.Total well depth below land surface: (examPle-3@200'and 2glUv) Original;form to Division of Water Resources (DWR). For natliple wells list all depths if all 24a. For All Wells: 0 . MSC,Raleigh,NC 27699-1617 40 (ft-) Information—Processing Unit,1617 10.Static water level below top of casing: --------------- o DWR,Underground injection Control(IUC) vote,-level is above casing,use'*+" 24b.for [niection_��ells:COPY t 27699-1636 61/18 Program,1636 MSC.Raleigh,NC 1.Borehole diameter: Wells�i COPY to the )Geothermal Return we Air Rotary 24c-For Water Su id 0 e,- "P-�� 12.Well construction method: county—environmental health department of the county where installed (i.e.auger,rotary,cable,direct push,etc-) I CCPCUA 24d.For Water Wells I oducino over 100,000 GPD:Copy to DWR, FOR WATER SUPPLY WELLS ONLY: PC-n,1Tljt PTOg m,1611 MSC,Raleigh,NC 27699-1611 13a.Yield Gopm) Method of test: Air Lift 1 1/2 Lbs 11-6hior. Tabs Amount* 13b.Disinfection type:-- ------_ i Revised 6-6-2019 North Carolina Department of Environmental Quality-Division of Water Rcs?:Urccs Form GW-I I